Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

El Born

designed by Erika Flory

In Barcelona, El Born is an old neighborhood filled with narrow streets where sunlight filters
down between the tall buildings. The long curve of the shawl, alternating and expanding
bands of dark and light, and a lace edging reminiscent of iron work all evoke memories of
wandering in that area.

SKILL LEVEL NEEDLES


Intermediate Size US 5 (3.75mm) 32" circular needle, or
size needed to obtain gauge.
FINISHED MEASUREMENTS
Wingspan: 60.5" after blocking NOTIONS
Back Length: 17"after blocking Two removable stitch markers
Yarn needle
YARN
Tosh Merino Light by madelinetosh, 100% GAUGE
superwash wool, 420 yards/384 meters, 1 In garter stitch, 20 sts and 46 rows = 4" after
skein each of Color A and Color B blocking
Sample shown in Woodstock (Color A) and Adjust needle size if necessary to obtain
Daffodil (Color B) correct gauge.
While exact gauge is not crucial, it will Stripe Sequence II
affect the size of the shawl and the With A, work 6 rows.
amount of yarn used. With B, work 4 rows.
This sequence is worked a total of 8 times:
ABBREVIATIONS 266 sts on needle.
CO: cast on
K: knit Work Rows 1 and 2 in Color A a total of 4
K2tog: knit two together times: 282 sts on needle. Cut Color A.
Kf&b: knit in the front and the back of the
stitch Work Rows 1 and 2 in Color B one time: 286
P: purl sts on needle.
PM: place marker
Rep: repeat
SK2P: slip 1, knit 2 together, pass slip stitch
over the knit 2 together
SM: slip marker
SSK: slip, slip, knit these 2 stiches together
St(s): stitch(es)
YO: yarn over

NOTES & TECHNIQUES


 When working stripes, carry yarn not
in use up the side.
 Cable cast on: *Insert right needle
between first two stitches on left
needle. Wrap yarn as if to knit. Draw
yarn through to complete stitch and
slip this new stitch to left needle. Rep
from * for as many stitches needed.

SHAWL
With Color A, CO 7 sts.
Set-up
K2, (kf&b) 3 times, k2: 10 sts on needle.
Shawl body
Row 1: K2, yo, kf&b, k to last 3 sts, kf&b, yo,
k2. Edging
Row 2: Knit. Row 1 (RS): K2, yo, kf&b, pm, *yo, ssk, k2tog,
This 2-row repeat is worked for the entire yo, k1. Rep from * to last 3 sts, pm, kf&b, yo,
Shawl Body while you work the following k2.
stripe sequences: Row 2 and all WS rows: K2, p to last 2 sts, k2.
Stripe Sequence I Row 3: K2, yo, kf&b, k to marker, sm, *k1,
With A, work 4 rows. yo, ssk, k3, k2tog, yo, k2. Rep from * to last 3
With B, work 2 rows. sts, sm, kf&b, yo, k2.
This sequence is worked a total of 8 times: Row 5: K2, yo, kf&b, k to marker, sm, *k2,
106 sts on needle. yo, ssk, k1, k2tog, yo, k3. Rep from * to last 3
sts, sm, kf&b, yo, k2.
Row 7: K2, yo, kf&b, k to marker, sm, *k3, Work Rows 2-14 of Edging as above: 342 sts
yo, sk2p, yo, k4. Rep from * to last 3 sts, sm, on needle.
kf&b, yo, k2. Knit 2 rows even.
Rows 9, 11 and 13: K2, yo, kf&b, sm, *ssk, k2,
yo, k1, yo, k2, k2tog, k1. Rep from * to last 3 Picot Bind off
sts, sm, kf&b, yo, k2. Bind off 26 sts. *Slip last st worked from right
Row 14: K2, p to last 2, k2, removing hand needle to left hand needle, cable
markers as you come to them. cast on 3 sts, bind off 13 sts. Rep from * 30
times total. Bind off remaining sts.
Re-set markers
Row 1: K2, yo, kf&b, k4, pm, work Row 1 of FINISHING
Edging to last 7 sts, pm, k4, kf&b, yo, k2. Weave in ends. Block to finished
measurements.

Edging Chart

Knit on right side, purl on wrong side

ssk

K2tog

Yarn over

Sk2p
copyright 2015 Erika Flory
kidknits@flory.com/www.kidknits.blogspot.com All rights reserved. This pattern may not be reproduced for business, trade or
sale.

You might also like