Machinery Division (Kobe) CHECK SHEET REXAS-42525-3 (1/3)

[ Confirmation of manual operation ]

Ship Name AL NISR Checking Date

Item CPP Manual Operation Type KST-200ZC/B1

1. Confirm manual operation and pressures at Rexpeller room


with CPP non-follow mode, M/E idle speed and clutch "OFF".

Press the valve


for manual operation

※If the pressure value is hunting, please write the range of value in the below table. (Ex. 5~7 MPa)

Result of inspection
Checking items PORT STBD
Check if CPP can move to full AH and AS by manual □ Possible □ Possible
01)
valve operation (valve 61). □ Impossible □ Impossible
Confirm the angle on blade angle transmitter under Full AH : deg Full AH : deg
02)
above condition. Full AS : deg Full AS : deg
AH to AS AH to AS
AH press : MPa AH press : MPa
03) Check each pressure during CPP movement. (AH max to AS max). AS press : MPa AS press : MPa
Pump Del : MPa Pump Del : MPa
Time : Sec Time : Sec
AS to AH AS to AH
AH press : MPa AH press : MPa
04) Check each pressure during CPP movement. (AS max to AH max). AS press : MPa AS press : MPa
Pump Del : MPa Pump Del : MPa
Time : Sec Time : Sec
Full AH Full AH
Check each maximum pressure at full AH to confirm
AH press : MPa AH press : MPa
05) the relief valve No. 63 setting point.
AS press : MPa AS press : MPa
NOTE: Keep pressing the valve during the checks.
Pump Del : MPa Pump Del : MPa
Full AS Full AS
Check each maximum pressure at full AS to confirm
AH press : MPa AH press : MPa
06) the relief valve No. 63 setting point.
AS press : MPa AS press : MPa
NOTE: Keep pressing the valve during the checks.
Pump Del : MPa Pump Del : MPa