Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

MAINTENACE WEEKLY REPORT

AUGUST 07-13 2023


DOWN TIME
EQUIPMENT STARTED ENDED
dd/mm/yy dd/mm/yy DURATION
REASON hh:mm hh:mm (h:m:s)
MONDAY (07/08/2023)
07/08/2023 07/08/2023
Loader II Check-up hydraulic oil, transmission, and greasing 1:00:00
6:00 7:00
07/08/2023 07/08/2023
Transit mixer Check-up wheels, rubber damper, and P.T.O propeller 1:00:00
6:00 7:00
07/08/2023 07/08/2023
TM 201 Replace right inner rear tire 1:00:00
8:00 9:00
07/08/2023 07/08/2023
Everdigm Repair greasing line and replace packing seal 9:00:00
8:00 17:00
07/08/2023 07/08/2023
TM 209 Repair signal light, back light, head light 4:00:00
10:00 14:00
07/08/2023 07/08/2023
TM 216 Repair backlight and head light 2:00:00
15:00 17:00
07/08/2023 07/08/2023
TM 225 Adjust ball drum roller 2:00:00
15:00 17:00
TUESDAY (08/08/2023)
08/08/2023 08/08/2023
Loader II Check-up hydraulic oil, transmission, and greasing 1:00:00
6:00 7:00
08/08/2023 08/08/2023
Transit mixer Check-up wheels, rubber damper, and P.T.O propeller 1:00:00
6:00 7:00
Repair Park light, clearance light, fog light, signal light, and 08/08/2023 08/08/2023
TM 204 3:00:00
brake light 8:00 11:00
08/08/2023 08/08/2023
TM 212 Replace headlight assembly 3:00:00
11:00 14:00
08/08/2023 08/08/2023
TM 223 Replace flat tire 0:30:00
15:30 16:00
WEDNESDAY (09/08/2023)
09/08/2023 09/08/2023
Loader II Check-up hydraulic oil, transmission, and greasing 1:00:00
6:00 7:00
09/08/2023 09/08/2023
Transit mixer Check-up wheels, rubber damper, and P.T.O propeller 1:00:00
6:00 7:00
09/08/2023 09/08/2023
TM 214 Replace right outer rear tire 1:00:00
8:00 9:00
09/08/2023 09/08/2023
TM 216 Refrigerant charging 2:00:00
8:00 10:00
09/08/2023 09/08/2023
TM 221 Replace flat tire 1:00:00
11:00 12:00
09/08/2023 09/08/2023
TM 223 Replace flat tire 1:00:00
11:00 12:00
09/08/2023 09/08/2023
TM 201 Repair back light 2:00:00
14:00 16:00
THURSDAY (10/08/2023)
10/08/2023 10/08/2023
Loader II Check-up hydraulic oil, transmission, and greasing 1:00:00
6:00 7:00
10/08/2023 10/08/2023
Transit mixer Check-up wheels, rubber damper, and P.T.O propeller 1:00:00
6:00 7:00
10/08/2023 10/08/2023
TM 223 Replace left outer rear tire 1:00:00
8:00 9:00
10/08/2023 10/08/2023
TM 206 Repair high and low gear shifter 3:00:00
8:00 11:00
10/08/2023 10/08/2023
TM 210 Repair hydraulic fan 2:00:00
11:00 13:00
10/08/2023 10/08/2023
TM 213 Repair clearance light and park light 2:00:00
15:00 17:00
FRIDAY (11/08/2023)
11/08/2023 11/08/2023
Loader II Check-up hydraulic oil, transmission, and greasing 1:00:00
6:00 7:00
11/08/2023 11/08/2023
Transit mixer Check-up wheels, rubber damper, and P.T.O propeller 1:00:00
6:00 7:00
11/08/2023 11/08/2023
TM 225 Replace aircon blower 4:00:00
8:00 12:00
11/08/2023 11/08/2023
TM 211 Repair Park light, and back light 2:00:00
9:00 11:00
SATURDAY (12/08/2023)
12/08/2023 12/08/2023
Loader II Check-up hydraulic oil, transmission, and greasing 1:00:00
6:00 7:00
12/08/2023 12/08/2023
Transit mixer Check-up wheels, rubber damper, and P.T.O propeller 1:00:00
6:00 7:00
Welding ball drum plate, replace foot valve, and repair 12/08/2023 12/08/2023
TM 205 4:00:00
hydraulic fan 8:00 12:00
12/08/2023 12/08/2023
TM 213 Repair hydraulic fan 2:00:00
13:00 15:00
SUNDAY (13/08/2023)
Dasswell central 13/08/2023 13/08/2023
Jackhammer hardened concrete 9:00:00
mixer 7:00 16:00
13/08/2023 13/08/2023
Loader II Preventive Maintenance Schedule 9:00:00
7:00 16:00
13/08/2023 13/08/2023
TM 216 Pull-out aircon evaporator 9:00:00
7:00 16:00
DAILY AVAILABILTY OF 10K EQUIPMENTS
EQUIPMENTS MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
TRANSIT Operable 19 19 19 19 18 18
MIXERS Not Operable 6 6 6 6 7 7
LOADER I OPERABLE OPERABLE OPERABLE OPERABLE OPERABLE OPERABLE
LOADER II OPERABLE OPERABLE OPERABLE OPERABLE OPERABLE OPERABLE
CAT GENSET OPERABLE OPERABLE OPERABLE OPERABLE OPERABLE OPERABLE
CUMMINS GENSET OPERABLE OPERABLE OPERABLE OPERABLE OPERABLE OPERABLE
DUNAMIS GENSET OPERABLE OPERABLE OPERABLE OPERABLE OPERABLE OPERABLE
NOT NOT
EVERDIGM OPERABLE OPERABLE OPERABLE OPERABLE OPERABLE OPERABLE
NOT NOT NOT NOT NOT NOT
MITSHUBISHI BACK HOE OPERABLE OPERABLE OPERABLE OPERABLE OPERABLE OPERABLE
DUMP TRUCK HOWO
371 OPERABLE OPERABLE OPERABLE OPERABLE OPERABLE OPERABLE

OPERABLE TRANSIT MIXERS PER WEEK


OPERABLE MIXER TRUCKS 18.67 74.67% WEEKLY AVERAGE OUT OF 25 MIXER TRUCKS

BREAKDOWN UNITS
EQUIPMENT PROBLEM DESCRIPTION STATUS
Delivered to repair shop at Quezon
TM 202 Accident repair
city last September 04, 2022
Cylinder head delivered to machine
TM 207 Engine repair shop for repair and Sourcing for
crankshaft
Quotation and Scope of work
TM 215 Accident repair submitted by Maintenance
Department
Mitsubishi
Damage idler and broken bearing For installation
Back Hoe
TM 206 Engine repair and Concrete chipping Scheduled for concrete chipping
TM 222 Concrete chipping On-going concrete chipping
For replacement of evaporator taken
TM 216 Evaporator leak
from tm 215
Maintenance Department Summary Report
Date: August 14 2023; as of 9:00am
TRANSIT MIXER
 Operable Units 18
 Breakdown Units 7

LOADER
 Loader 1 Operable
 Loader 2 Operable

GENERATOR SET
 Caterpillar Genset Operable
 Cummins Genset Operable
 Dunamis Genset Operable

CONCRETE PUMP
 Everdigm Pump Operable

BACKHOE
 Mitsubishi Back Hoe Not Operable

Prepared by: Noted by:

Elison G. Estinopo ROGER JOSE A. BANDELARIA

You might also like