Professional Documents
Culture Documents
Towing and Transport
Towing and Transport
Danger
4.14 Towing in case of an engine failure
Operation
Fig. 64
! Caution
Towing speed 1 km/h, max. towing distance
500 m.
l Open the tailgate.
Operation
After towing
! Caution
Before detaching the tow bar block the ma-
chine with chocks to prevent unintended
roll- ing.
l Turn the high pressure relief valve cartridges
tightly back in.
l Turn all brake releasing screws of the
axle evenly back out, until they are light
moving again.
Fig. 65
! Caution
Do not turn the valves out completely.
Fig. 67
Fig. 66
i Note
4.15 Transport
If necessary replace the seal ring under the
coun- ter nut if it is leaking.
For this purpose completely unscrew the brake ! Danger
re- leasing screw, replace the seal ring and Danger of accident!
lubricate the screw with silicone grease.
Use only stable loading ramps of sufficient
Reinstall the screw with a new seal ring and
load bearing capacity. Make sure that
adjust the protrusion as described above.
persons are not endangered by the machine
tipping or sliding off.
Lash the machine down, so that it is secured
against rolling, sliding and turning over.
Do not stand or step under loads being lifted.
Always use shackles on the lifting points for
loading, tying or lifting the machine.
Fig. 69
Fig. 70
Operation
Fig. 71 Fig. 73
l Lash the machine on the transport vehicle l Position of centre of gravity (Fig. 73).
(Fig. 71), use the four lashing eyes on front
and rear frame for this purpose. Machine L H
l Support the front frame to avoid
overstressing of the rubber buffers. BW 211 - 214-4 1150±260 860±70
Danger of accident!
The machine cannot be steered if the
articula- tion lock is applied.
l After transport release the articulation lock
again and store it in the receptacle.
Fig. 72
l For lifting use also the four lifting eyes (Fig.
72) and appropriate lifting gear.