EOD
Station PLL @366MW
BOP
Coal Plant:
Plant on load, feeding 1K silos with RC2.
BF1, BF2 and BF3 are standby.
No stacking due to silo level low, Exxaro mine on maintenance. RTS 2023/12/29.
T8C striker plate damage, C&I replace damage striker plate. Plant back to operational.
RC1 on PTW for removal and replacement of drum motors. RC1 cleaning not completed
due to faulty brakes on drum motors, no spares. RTS:2024-01-15
Ash Plant
Ash plant on load dumping ash at AS 2.
Silo1 @ 3.6m Silo2 @ 6.3m Silo3 @3.0m Silo4@ 2.1m Silo5@ 2.2m Silo6@ 2.9m
LP Services
Potable water head tank level @2.07m.
CSY TRF HSE 6 PTW for repairing of fire water leak, Issued. RTS 2023-12-29.
HP fuel oil bank 50 PTW for replacement of thyristor relay revoked, plant back on load.
o No running feedback due to K07 relay faulty settings, SE(Nthando) notified and
busy attending.
North fuel oil plant tripped due to HP pre-heater min flow.
o The LP reg station valve (00EGC17AA001) was not regulating and open to 99.8%
o The control valve was open manually and selected back to remote after starting.
o C&I engineer still investigating the root cause.
o HP heater bank 20 heater 2 (00EGD20AC002) is not operational due to faulty
safety relay. EMD sourcing spares.
Fuel oil tankers offloaded: 0 | Tanks @ 10.6m
Potable water inlet valve open limit signal is simulated. C&I and engineering are