Figure 1. LH Mount Transmission, MPI Test Not Found Figure 2. Detail Hole Mount, MPI Test not Found Crack
Crack area. area.
Sandvik Mining and Construction Australia Pacific
NDT-Magnetic Particle Inspection Report
Pre Inspection
Figure 3. RH Mount Transmission, MPI Test not Found Figure 4. Detail Hole Mount, MPI Test not Found Crack
Crack area. area.
Test Result