EB line construction required for 170 Mtr. length HT and 30 Mtr LT. Line erection planned with Ariel Bunched Cable. Cost
may be approx. 10% less incase SEB allow us to use Open Conductor ( Racoon or Weasel).
Standard Civil Cost for 40 Mtr. GFT-12(WT), 180 KMPH, 10 SBC Foundation Design for Assam is Rs. 6,03,855/.The area is lo
lying so we need to increase AMT DG Slab to 1 mtr and as such there will be additional cost Rs.25,000. Additional Civil cost
of Rs. 30,000/ is taken for de-watering/ shoring of pits/bolder soling etc. which may be required as per site condition.
Additional Cost of Rs. 50,000/ is taken for differential amount due to Steel Rate Increase in ATC BOQ.
Charges for Site Management, Template Carrying & Cube Test amounting Rs. 31,500/ is not a part of the Standard
Foundation cost and as such same will be added in Civil PR (These 03 Items come as a Child BOQ Item in Civil PR).
Additional revenue Rs. 1500/pm as per EB distance clause in MSA.
The acquired option falls in forest land and prospective may be considered post receiving NOC from Deputy Commissioner
74.3604997025
EB line construction required for 130 Mtr. length HT and 30 Mtr LT. Line erection planned with Ariel Bunched
Cable. Cost may be approx. 10% less incase SEB allow us to use Open Conductor ( Racoon or Weasel).
Though the nominal falls in 200 KMPH zone we have planned to install 180 KMPH tower to optimize cost as
approved by IPD. Standard Civil Cost for 40 Mtr. GFT-12(WT), 180 KMPH, 10 SBC Foundation Design for Assam is
Rs. 6,03,855/. Additional Civil cost of Rs. 50,000/ is taken for differential amount due to Steel Rate Increase in ATC
BOQ.
Charges for Site Management, Template Carrying & Cube Test amounting Rs. 31,500/ is not a part of the Standard
Foundation cost and as such same will be added in Civil PR (These 03 Items come as a Child BOQ Item in Civil PR).
200
EB line construction required for 120 Mtr. length HT and 30 Mtr LT. Line erection planned with Ariel
Bunched Cable. Cost may be approx. 10% less incase SEB allow us to use Open Conductor ( Racoon or
Weasel).
Though the nominal falls in 200 KMPH zone we have planned to install 180 KMPH tower to optimize cost
as approved by IPD. Standard Civil Cost for 40 Mtr. GFT-12, 180 KMPH, 10 SBC Foundation Design for
Tripura is Rs. 6,27,293/. Additional Civil cost of Rs. 1,25,000/ (Approx. 40% increase in Rate) is taken for
differential amount due to Steel Rate Increase in ATC BOQ.
Charges for Site Management, Template Carrying & Cube Test amounting Rs. 38,500/ is not a part of the
Standard Foundation cost and as such same will be added in Civil PR (These 03 Items come as a Child BOQ
Item in Civil PR).
14872.0999405116
Estimated
additional
revenue
EB distance premium Nil. We Projected as EB
are unlikely to get the cost EB distance
sharing benefit above 5 Lacs as distance premium
Airtel has agreed for premium would be
reimbursement only for sites is Rs. Per Rs. 2,000/
RFIed prior to 1st July'21. month. pm.
EB line construction required for 130 Mtr. length HT and 30 Mtr LT. As per Term Sheet, Airtel will reimburse EB Cost above
Estimated Foundation Cost for 40 Mtr. Contemporary Design for Assam is Rs. 4,55,349/. Charges for Site Management, Tem
a part of the Standard Foundation cost and as such same will be added in Civil PR (These 03 Items come as a Child BOQ Ite
Total Estimated Cost - Rs. 13.87 Lacs, Approved Capex for Contemporary Lite Plus - 13.4 Lacs. Additional Revenue for WSZ,
RFI timeline is considered is in line with average time required for getting Permanent EB con
EB line construction required for 130 Mtr. length HT and 30 Mtr LT. As per Term Sheet, Airtel will reimburse EB Cost above
Estimated Foundation Cost for 40 Mtr. Contemporary Design for Assam is Rs. 4,55,349/. Charges for Site Management, Tem
a part of the Standard Foundation cost and as such same will be added in Civil PR (These 03 Items come as a Child BOQ Ite
Total Estimated Cost - Rs. 13.61 Lacs, Approved Capex for Contemporary Lite Plus - 13.4 Lacs. Additional Revenue for WSZ,
RFI timeline is considered is in line with average time required for getting Permanent EB con
EB line construction required for 130 Mtr. length HT and 30 Mtr LT. As per Term Sheet, Airtel will reimburse EB Cost above
Estimated Foundation Cost for 40 Mtr. Contemporary Design for Assam is Rs. 4,55,349/. Charges for Site Management, Tem
a part of the Standard Foundation cost and as such same will be added in Civil PR (These 03 Items come as a Child BOQ Ite
Total Estimated Cost - Rs. 13.01 Lacs, Approved Capex for Contemporary Lite - 12.64 Lacs. A
RFI timeline is considered is in line with average time required for getting Permanent EB co
EB line construction required for 130 Mtr. length HT and 30 Mtr LT. As per Term Sheet, Airtel will reimburse EB Cost above
Estimated Foundation Cost for 40 Mtr. Contemporary Design for Assam is Rs. 4,55,349/. Charges for Site Management, Tem
a part of the Standard Foundation cost and as such same will be added in Civil PR (These 03 Items come as a Child BOQ Ite
Total Estimated Cost - Rs. 12.71 Lacs, Approved Capex for Contemporary Lite - 12.64 Lacs. A
RFI timeline is considered is in line with average time required for getting Permanent EB co
EB line construction required for 270 Mtr. length HT and 30 Mtr LT. As per Term Sheet, Airtel will reimburse EB Cost above
Estimated Foundation Cost for 40 Mtr. Contemporary Design for Manipur is Rs. 4,78,208/
Test amounting Rs. 38,500/ is not a part of the Standard Foundation cost and as such same will be added in Civil PR (These
Total Estimated Cost - Rs. 14.1 Lacs, A
Rs. 2,100/ per month. RFI tim
for getting Permanent EB connection.
Total Estimated Cost - Rs. 13.82 Lacs, Approved Capex - 13.4 Lacs. Additional Revenue for WSZ, Rs. 2,100/ per month.