Professional Documents
Culture Documents
91Loop-Levelling (FINAL) LEFT BANK
91Loop-Levelling (FINAL) LEFT BANK
91Loop-Levelling (FINAL) LEFT BANK
INSTITUTE OF ENGINEERING
PULCHOWK CAMPUS
DEPARTMENT OF CIVIL ENGINEERING
SURVEY INSTRUCTION COMMITTEE
Group No.:02 Date:2076-Ashwin
Observer: Loop Levelling(B-D-G-B)(Left Bank) Instrument:
Recorder: Weather:
e = 8 mm
k = 0.189 km
perm e = 10.869 mm OK
91