TRIBHUVAN UNIVERSITY

INSTITUTE OF ENGINEERING
PULCHOWK CAMPUS
DEPARTMENT OF CIVIL ENGINEERING
SURVEY INSTRUCTION COMMITTEE
Group No.:02 Date:2076-Ashwin
Observer: Loop Levelling(B-D-G-B)(Left Bank) Instrument:
Recorder: Weather:

Inst Coerrection Correc Corrected


BS FS RISE FALL RL (m) Coefficient
Remarks
Stn tion RL(m)
B 1.824 1304.882 0 0.000 1304.882
TP1 1.696 1.054 0.77 0 1305.652 1 -0.001 1305.651
D 1.754 1.149 0.547 0 1306.199 2 -0.001 1306.198
TP3 0.985 1.195 0.559 0 1306.758 3 -0.002 1306.756
TP4 1.845 1.923 0 0.938 1305.82 4 -0.002 1305.818
TP5 1.046 0.712 1.133 0 1306.953 5 -0.003 1306.950
G 1.437 1.441 0 0.395 1306.558 6 -0.004 1306.554
TP6 1.117 1.056 0.381 0 1306.939 7 -0.004 1306.935
TP7 1.798 1.856 0 0.739 1306.2 8 -0.005 1306.195
TP8 1.195 0.746 1.052 0 1307.252 9 -0.006 1307.246
TP9 1.546 1.892 0 0.697 1306.555 10 -0.006 1306.549
TP10 1.015 1.814 0 0.268 1306.287 11 -0.007 1306.280
TP11 0.912 1.468 0 0.453 1305.834 12 -0.007 1305.827
B 1.856 0 0.944 1304.89 13 -0.008 1304.882 Ok
SUM 18.17 18.162 4.442 4.434
∑BS - ∑FS = 18.17 - 18.162 = 0.008 ∑Rise - ∑Fall = 4.442 - 4.434 = 0.008m OK

e = 8 mm
k = 0.189 km
perm e = 10.869 mm OK