Name Zainuri

PT Wijaya Karya Tbk Department RC-ID SI EA S


Smart Infrastructure
Electrification & Automation
Mobile +62 811-1666-551
E-Mail zainuri@siemens.com
Our reference 1B23 4588 / R04

Date 01.12.2023
Prepared by Akif E.R.
Budgetary Offer

Subject: Budgetary Price Indication for Terminal LPG Refrigerated Tank Jawa Timur ( Phase -2 ) Project
_
Dear Sirs / Madam,

We thank you very much for your inquiry for the above subject and subsequently submit our budgetary quotation
(hereinafter shall be referred to as Price Indication”) according to the enclosed technical and commercial offer.

VALUE PROPOSITIONS

We would like to highlight some advantages in having Siemens Indonesia as your partner for your project.

Reputable and experienced supplier


Siemens is a reputable and experienced supplier with worldwide references for more than 150 years. Choosing
Siemens as your partner on this project means that you receive a quality product from a reputed supplier, who will
always support the equipment throughout the life of it. In our experience this is highly valuable to our customers. We
have been able to establish our brand name, by offering best quality product along with best relationship management
and our customers can depend on the same.

Local presence in your region – We speak your language


Siemens is locally present in your region which provides you easy access for spare parts, field services and after
sales services. It also provides you a local partner through which all the queries can be addressed related to Siemens
products. Our fast service saves your time and money in solving your difficulties. The alternative is longer downtime
of equipment with loss of revenue.

Partnership
Siemens views every customer as a partner and we are committed to provide the solution to our customer’s
requirements. Siemens can provide every possible service from supply of standard products to complete turnkey
solution with financing. This reduces the no. of suppliers to our customers and thereby reducing supplier management
cost and interface problems.

Highest product quality with most user friendly features


Siemens delivers highest product quality with the most user friendly features. This ensures operational reliability,
equipment availability and maximum safety for the operating personnel and it results into highest level of productivity
and profitability.

PT Siemens Indonesia Jl. Jend. A. Yani Kav 67-68 Tel.: +62 811-1666-551
Kel. Kayu Putih, Kec. Pulogadung contact.id@siemens.com
Kota Jakarta Timur www.siemens.co.id

Commissioner: Thai Lai Pham (sole commissioner)


President Director and CEO: Dr. Lamine Jendoubi
Board of Directors: Dr. Lamine Jendoubi, Holger Appler
Registered Office: Jl. Jend. A. Yani Kav 67-68 Kel. Kayu Putih, Kec. Pulogadung, Kota Jakarta Timur
NIB No. 8120104863304; NPWP No. 01.310.105.0-092.000

Page 1 of 8
Letter dated : 01.12.2023
To : PT Wijaya Karya Tbk
Our reference : 1B23 4588 / R03
Offer Type : Budgetary Offer

The offer shall take reference to the following documents:

1. This Offer Letter;


2. PTSI_General Conditions updated June 2022;
3. Technical Document
4. SI EA CS Daily Rate_FY24

SCOPE OF SUPPLY AND PRICING


Item Description Quantity Unit Price Total Price
(IDR) (IDR)
Base
MV Switchgear

Note :
- Our panel has been type-tested
_
- FAT will be done as per manufacturer standard and typical-wise
- Our panel can be installed to the floor directly as long as the floor is flat
- Packing for equipment will be as per manufacturer standard
- Delivery Terms : 24 weeks, FCA Pulomas
10 30-MVSWGR-001_20kV SWGR
4 Panels,
1 pcs 1,210,391,000 1,210,391,000
24.0 kV, 25 kA / 3 s, 1250 A
consisting of:
10.10 =JZ00 NXAIR M Accessory 1 pcs
10.20 =JZ01 INCOMING FEEDER 1 pcs
10.30 =JZ02 OUTGOING TRAFO 1 pcs
10.40 =JZ03 Reserve panel (800 A 1 pcs
10.50 =JZ04 Metering Panel 1 pcs
20 Spare part for Commissioning & Start-up NXAIR-M 1 set 31,883,000 31,883,000
- Lamp Indication (Red, Green, White, Blue, Amber) 2 set
- Push Button (Red, Green, Black) 2 set
- Local/Remote Selector switch 1 set
- Emergency Stop Push Button (1 NO + 1 NC) Mushroom 1 set
Red c/w Padlocking
- MCB 2P, 6A 1 set
- MCB 3P+N, 2A 1 set
- MV VT Fuse 1 set
- Auxiliary Relay + Socket (4 NO / 4 NC) 1 set
- Terminal Block 1 set
- CB Closing Coil 1 set
- CB Opening Coil 1 set
- CB Motor Drive / Spring Charging Motor 1 set
- Thermostat 1 set
- Current Test Plug 1 set
- Voltage Test Plug 1 set
40 30-MVSWGR-002_3.3kV SWGR/MC
12 Panels,
1 pcs 3,713,487,000 3,713,487,000
7.2 kV, 31.5 kA / 3 s, 2500 A
consisting of:
40.10 =MZ00 NXAIR Accessory 1 pcs
40.20 =MZ01 INCOMING from TX 1 pcs
40.30 =MZ02 INCOMING from EDG 4 pcs
40.40 =MZ03 OUTGOING FEDEER 2 pcs
40.50 =MZ04 OUTGOING TX 630 kVA 1 pcs
40.60 =MZ05 OUTGOING TX 1600 kVA 1 pcs
40.70 =MZ06 OUTGOING CAPACITOR 1 pcs
40.80 =MZ07 Metering Panel 600mm 1 pcs
40.90 =MZ08 Outgoing Soft Starter 1 pcs
Confidential Page 2 of 8
Letter dated : 01.12.2023
To : PT Wijaya Karya Tbk
Our reference : 1B23 4588 / R03
Offer Type : Budgetary Offer

Item Description Quantity Unit Price Total Price


(IDR) (IDR)
50 Spare part for Commissioning & Start-up NXAIR 1 set 31,883,000 31,883,000
-Lamp Indication (Red, Green, White, Blue, Amber) 2 set
-Push Button (Red, Green, Black) 2 set
-Local/Remote Selector switch 1 set
-Emergency Stop Push Button (1 NO + 1 NC) Mushroom 1 set
Red c/w Padlocking
- MCB 2P, 6A 1 set
- MCB 3P+N, 2A 1 set
- MV VT Fuse 1 set
- Auxiliary Relay + Socket (4 NO / 4 NC) 1 set
- Terminal Block 1 set
- CB Closing Coil 1 set
- CB Opening Coil 1 set
_
- CB Motor Drive / Spring Charging Motor 1 set
- Thermostat 1 set
- Current Test Plug 1 set
- Voltage Test Plug 1 set
60 Software 1 set 35,564,000 35,564,000
MV Soft-starter

Note : Delivery Terms : 47 weeks, FCA Pulomas


100 Incoming Panel (Bus Riser)
Incoming panel equipped with the following equipment:
1 set 263,067,000 263,067,000
1.) Bus bar system Rated current: 2450 A
2.) 3 pcs of Voltage transformer (PT)
110 MV Soft Starter up to 370kW
Solid state soft starter type VFS 150/3,6
(suitable for a max. 375 kW and 3,3 kV motor)
equipped with the following equipment:
- Bus bar system Rated current: 2450 A
- Motor feeder circuit Rated current: 150 A
- 1 pc of Disconnector and earthing switch unit
- 3 pcs of MV fuses for short circuit protection 9 set 600,022,000 5,400,198,000
- 3 pcs of Current transformer (CT)
- 2 pcs of Vacuum contactor (fixed type)
- 3 pcs of Phase module (SCR power stack)
- Motor temperature protection relay with 8-CH
- Digital multimeter with MODBUS RTU (reading of kW,
kVA, kVAr, etc.)
120 MV Soft Starter up to 630kW
Solid state soft starter type VFS 150/3,6
(suitable for a max. 630 kW and 3,3 kV motor)
equipped with the following equipment:
- Bus bar system Rated current: 2450 A
- Motor feeder circuit Rated current: 150 A
- 1 pc of Disconnector and earthing switch unit
- 3 pcs of MV fuses for short circuit protection 14 set 635,948,000 8,903,272,000
- 3 pcs of Current transformer (CT)
- 2 pcs of Vacuum contactor (fixed type)
- 3 pcs of Phase module (SCR power stack)
- Motor temperature protection relay with 8-CH
- Digital multimeter with MODBUS RTU (reading of kW,
kVA, kVAr, etc.)

Confidential Page 3 of 8
Letter dated : 01.12.2023
To : PT Wijaya Karya Tbk
Our reference : 1B23 4588 / R03
Offer Type : Budgetary Offer

Item Description Quantity Unit Price Total Price


(IDR) (IDR)
130 Spare part for MV Soft Starter
Spare parts consisting of:
1 pc of HMI
1 set of Aux. relays 6 set 17,893,000 107,358,000
1 set of Aux. contactors
1 set of Miniature circuit breakers
1 set of Push buttons and indication lamps
200 On-Site Service for MV Soft Starter 1 Lot 560,689,000 560,689,000
- 1 engineer for 4 days of installation supervision
- 1 engineer for 8 days of commissioning test supervision
- 1 engineer for 2 days of training
- Accommodation, transportation, documentation for
_ training is included
230 On-site Service of SI EA (MV AIS) 1 Lot 197,420,000 197,420,000
- 1 engineer for 7 days of installation supervision
- 1 engineer for 15 days of commissioning test supervision
- 1 engineer for 4 days of training
- Accommodation, transportation, documentation for
training is included
240 On-site Service of 3rd Party 1 Lot 440,916,000 440,916,000
- 5 days of 20 kV MV AIS Comm. Test
- 10 days of 6 kV MV AIS Comm. Test
- 8 days of MV Soft-Starter Comm. Test
- Accommodation, transportation, expenses is included

Testing Tool :
- Primary Injection
- Secondary Injection
- Insulation Test
- Multimeter
- Hi-Pot AC
- Mob-Demob
Total 20,896,128,000
Optional
140 Option: Optional PT (2pcs-2Pole) for MV Soft Starter 1 set 29,839,000 29,839,000
150 Option: Optional PT (3pcs-1Pole) for MV Soft Starter 1 set 43,098,000 43,098,000
160 Option: FAT for MV Soft Starter
One-day factory acceptance test (FAT) in Rheinberg,
1 set 15,730,000 15,730,000
Germany acc. to the test schedule from Mocotech GmbH
(external costs are not included).
210 Option: Daily Rate Optional Factory Training for MV
1 pcs 17,586,000 17,586,000
Soft Starter
220 Option: Overtime Hour Optional On-Site Service for MV
1 pcs 2,931,000 2,931,000
Soft Starter
250 Option: DDP Tuban 1 pcs 115,480,000 115,480,000

The price above are exclusive VAT and other taxes if applicable. Place of manufacturing are as follows :
1. MV Swithgear : Pulomas Factory, Jakarta
2. MV Soft Starter : Germany or equal

Price subject to change due to exchange rate fluctuation. The basis for exchange rate used in this pricing is 1 EUR
= 16,500 reference date as per offer date.

Confidential Page 4 of 8
Letter dated : 01.12.2023
To : PT Wijaya Karya Tbk
Our reference : 1B23 4588 / R03
Offer Type : Budgetary Offer

Please note that the following items and services are not included in our scope:
 Construction
 Intermediate inspection
 Ticket and accommodation for FAT

The Equipment & Service (if any) shall be placed in two separate Purchase Orders.

PRICE VALIDITY AND INCOTERMS

Our budgetary offer can be used as reference until 1 month after offer date and is to be understood FCA Pulomas
Factory, Jakarta according to INCOTERMS®2020. The price does not include any taxes and fees. Transfer of risk
for the goods supplied shall be in accordance with INCOTERMS®2020.

Orders shall only be placed after the release of firm offer from PT Siemens Indonesia.
_ Price above valid for full load bundle.

TERMS AND PAYMENT

Payment shall be made by T/T for Advance Payment and Letter of Credit (or SKBDN) for the remaining payment.
Terms of payment are as follows:

Advance Payment:
20% of the total order value to be paid by telegraphic transfer within 30 (thirty) days upon PO issuance against
our commercial invoice.

Progress Payment:
20% of the goods value, as progress payment upon main material arrival at our warehouse against our signed
delivery note.

30% of the goods value, as progress payment upon the completion of factory acceptance test against our FRT /
FAT (If Applicable) certificate.
In case of delivery in batches, partial FAT and invoicing of the FRT / FAT (If Applicable) portions are allowed.
Typical FRT / FAT (If Applicable) test is allowed unless agreed otherwise.

30% of the goods value shall be paid upon delivery against our commercial invoice, along with supporting
documents as agreed in the order (e.g. delivery note)
In case of delivery in batches, partial deliveries and invoicing of the portions delivered are allowed.

The above progress payment has to be affected out of an irrevocable Letter of Credit (or SKBDN), which must be
payable within 30 days, divisible, and transferable. The L/C (or SKBDN) must be issued by a reputable Bank and
opened in favour of:

PT Siemens Indonesia
With Deutsche Bank, Jakarta Branch
Deutsche Bank Building
Jl. Imam Bonjol No. 80
Jakarta 10310

The L/C (or SKBDN) must be received by us within 30 (thirty) days after receipt of official purchase order.

In all cases of late payment an interest of 0.5% per week will be applied. In the event that shipment is delayed for
reason beyond our control, payment shall be affected against presentation of notice of delivery readiness.
Additional from such, PT Siemens Indonesia is also entitled to invoice all costs and expenses incurred due to such
delay including but not limited storage costs. It is understood the goods remains under PT. Siemens Indonesia
property until payment received in full.

Confidential Page 5 of 8
Letter dated : 01.12.2023
To : PT Wijaya Karya Tbk
Our reference : 1B23 4588 / R03
Offer Type : Budgetary Offer

CANCELLATION AND ADDITION

In the event that PT Wijaya Karya Tbk determines to vary the contracted scope of works by adding or reducing
quantities of panels, the following table of indicative unit rates based upon % of the unit prices quoted above will be
applied. These rates are based upon the intent to maintain the contracted delivery dates, assuming accelerated
delivery of required components and/or new preparation/modification of engineering documentation. If however the
change cannot be accommodated within the agreed delivery period, PT. Siemens Indonesia reserves the right to
decline the variation or negotiate a new delivery period.

Time after official Progress Status Cancellation Addition


confirmation of
purchase order
1-2 weeks After confirmation of order, before primary drawings 0% 0%
for approval are issued
_ 3-5 weeks Primary Design has been approved, purchase order -5% +5%
for major components not yet released
6-8 weeks Purchase orders for major components and parts -45% +35%
have been released, in some cases already
dispatched (need for acceleration activities, incl.
vendors/freight to allow delivery to be maintained)
Changes after this can no longer be accommodated within the contractual delivery period.
Need for contractual delivery date to be varied and delivery split.
9-12 weeks Major components and parts received, metal and -80% **
copper produced. Some assemblies may already be
produced
>= 13 weeks All parts produced, all parts received, all -100% **
documentation completed

** Amount of charges can only be identified after contractual delivery has been amended and allowances for
prolongation, deferment, acceleration and modification have been identified.

TERMS OF DELIVERY

Delivery is refering to scope of supply table as above mentioned effective after receipt of official purchase order,
technically and commercially clarified order, including receipt of requested down payments or payment securities and
confirmed on the basis of the following milestones, according to attached “Submission of Electrical Documentation”:

 Order is technically and commercially clarified 47 weeks before FCA date. Clarification includes at least the
confirmation of the scope of supply and written information about eventually existing engineering
requirements further to the costumer’s specifications, so that the elaboration of Secondary Design may start.
 Receipt of approved for construction Primary Design ca. 1 week after submittal of Primary Design.
 Receipt of technical documentation for free-issue components (also known as “Consignments” or “Customer-
Supplied Components”) and receipt of free-issue components according to attached “Terms and Conditions
for Customer-Supplied Components”.
 Receipt of approved for construction Secondary Design ca. 2 weeks after Secondary Design submittal.
 Both Primary and Secondary Design shall be received by factory with status “approved for construction” or
“approved for construction with comments”, such that those comments will produce no effect to both price
and delivery schedule, according to attached “Submission of Electrical Documentation”.

Any changes, modification, or others beyond the stated conditions above may affect delivery time and equipment
price. The delivery includes packing as described in the attached scope of supply. A detailed project milestone
schedule will be submitted with our order confirmation. Delivery time is subject of our approval during order
confirmation.

Delivery time will be affected if it overlaps with Idul Fitri or Christmas or New Year.

The Parties acknowledge that temporary delays in delivery and service performance concerning Siemens and/or
Siemens suppliers/sub-contractors may occur as a result of the Covid-19 Virus. Therefore, the time delivery
Confidential Page 6 of 8
Letter dated : 01.12.2023
To : PT Wijaya Karya Tbk
Our reference : 1B23 4588 / R03
Offer Type : Budgetary Offer

(mentioned above in the offer) is budgetary and Siemens reserves the right to partial delivery of service and shall be
entitled to reasonable adjustment of the time delivery.

STORAGE

In the event shipment is delayed for any reason that is beyond the control of PT Siemens Indonesia., and the
equipment needs to be kept in storage, a storage fee in the amount of 1.5% of the equipment value shall be charged
per month on the first day of each month.
In the event that shipment is delayed for reasons beyond our control, payment shall be effected against shipping
agent’s confirmation that the material is ready for shipment or storage.

CONSEQUENTIAL DAMAGES & LIABILITIES

_ In no case we shall be liable under any condition as a result of this offer for any indirect or consequential damages,
such as, but not limited to: Loss of profit, loss production, loss of use of equipment, loss of power or any other claims
from third parties.

Under no circumstances shall Supplier’ total aggregate liability toward Customer exceeds the Contract Price.
We cannot be held responsible for any delay in delivery / damage caused by Force Majeure, incidence, accidents,
or other events that are beyond our control.

WARRANTY

The warranty period will be 18 months from the date of shipment (Bill of Lading / delivery notes) or forwarding agent’s
receipt with warranty condition as refer to PTSI_General Conditions updated June 2022.
To ensure the proper operation of Siemens product and system, we require the service of Commissioning and Site
Acceptance Test to be done by Siemens engineers; or by the 3rd party trained and experienced service providers
certified by Siemens or under the supervision of Siemens engineers. Any Commissioning and Site Acceptance Test
violating Siemens policy shall lead to a void of warranty conditions.

QUALITY INSURANCE

Our Factories have a comprehensive program of Quality Assurance and Quality Control, which is compliant with,
and accredited to the ISO 9001:2000, ISO 14001:2004, and OHSAS 18001:1999.

COMPLIANCE WITH EXPORT CONTROL REGULATIONS

1 If Recipient transfers goods (hardware and/ or software and/ or technology as well as corresponding
documentation, regardless of the mode of provision) delivered by Siemens or works and services (including all
kinds of technical support) performed by Siemens to a third party Recipient shall comply with all applicable
national and international (re-) export control regulations. In any event of such transfer of goods, works and
services Recipient shall comply with the (re-) export control regulations of the Federal Republic of Germany, of
the European Union and of the United States of America.

2 Prior to any transfer of goods, works and services provided by Siemens to a third party Recipient shall in particular
check and guarantee by appropriate measures that

- There will be no infringement of an embargo imposed by the European Union, by the United States of
America and/ or by the United Nations by such transfer, by brokering of contracts concerning those goods,
works and services or by provision of other economic resources in connection with those goods, works and
services, also considering the limitations of domestic business and prohibitions of by-passing those
embargos;

- Such goods, works and services are not intended for use in connection with armaments, nuclear technology
or weapons, if and to the extent such use is subject to prohibition or authorization, unless required
authorization is provided;

Confidential Page 7 of 8
Letter dated : 01.12.2023
To : PT Wijaya Karya Tbk
Our reference : 1B23 4588 / R03
Offer Type : Budgetary Offer

- The regulations of all applicable Sanctioned Party Lists of the European Union and the United States of
America concerning the trading with entities, persons and organizations listed therein are considered.

3 If required to enable authorities or Siemens to conduct export control checks, Recipient, upon request by
Siemens, shall promptly provide Siemens with all information pertaining to the particular end customer, the
particular destination and the particular intended use of goods, works and services provided by Siemens, as well
as any export control restrictions existing.

4 Recipient shall indemnify and hold harmless Siemens from and against any claim, proceeding, action, fine, loss,
cost and damages arising out of or relating to any noncompliance with export control regulations by Recipient,
and Recipient shall compensate Siemens for all losses and expenses resulting thereof.

BUSINESS ETHICS

_ We are following highest business ethic standards, which we expect in the same way from all our Customers,
Contractors, Suppliers, and Consultants, when doing business with us. Any violation of that policies will be considered
as a serious breach of our contracts and agreements.

You can find the details in our brochure Business Conduct Guidelines as a download from our website
www.siemens.com

GENERAL CONDITIONS

Unless specifically addressed within the items above and quotation documentations, then the terms and conditions
detailed in the attached PTSI_General Conditions updated June 2022 will apply.

Siemens shall not be obligated to continue with firm offer if such offer is prevented by any impediments arising out
of national or international foreign trade or customs requirements or any embargoes or other sanctions.

For the avoidance of doubt, the Price Indication given in this document is meant to be budgetary. Any confirmation
or acceptance from your side will not constitute any contractual relationship. This Price Indication does not oblige
Siemens to submit a binding offer. A firm and binding offer may be submitted to you after further clarifications and
upon your request and will be subject to further management approval. Siemens excludes any liability whatsoever
under or in connection with it.

Should you require further information, or need clarification of any aspect of our budgetary offer, please do not
hesitate to contact Zainuri on +62 811-1666-551.

Yours faithfully,
PT. Siemens Indonesia Smart Infrastructure Electrification & Automation

Rupinder Kumar Tinjani Nguyen Viet Y Vy


Head of PT. Siemens Indonesia Finance of PT. Siemens Indonesia
Smart Infrastructure, Electrification and Automation Smart Infrastructure, Electrification and
Automation

This document was signed electronically and is valid without written signature