Subject: Risk Assessement for Steel Structure Installation Rev.

01
Project: Zali Restaurant
Location: Marsa Al Bateen - Shop 11

Risk Assessement for Steel Structure Installation


S/N Activity Hazards Identified Risk Impact Probability Severity Risk Level Controls
Falls of peronnel Seriouss injury / death Use fall protection system when fall distance exceeds 2m
Works on scaffold with guardrail system
Failure of platform / equipment Injuries & property damage Secure lanyard to strong fixed anchor point
Working at height 2 4 M
Use only good condition ladders
Secure ladders to fixed anchors
Never carry materials/tools with hands when on ladders
PTW required
Install flashback arrestors on regulators hose ends
Secure gas cylinder in trolleys with chains
Steel Cutting Fire, explosion, fumes, gases Burns, property damage, lost time 3 2 M
Use burning / cutting goggles
Provide ventillation system in confined locations
Wear respiratory protection

Overstress & overxertion in manual Use mechanical aid for heavy loads
2 2 L
handling No manual lifting beyond 50kg loads
Minimize manual whenever possible
Materials Handling Stress, strain, exhaustion
Observe proper stocking
No overload handling equipment
Toppling of loads 2 2 L
Material will have competent web slings connected with existing
concrete columns or beams where necessary
Fire and explosion from ignition of Burns or other fire related injury or
gas cylinders damage 3 4H Hot works permit (authority or client) system to be used
Ignition of other flammable materials
whilst hot work operations are under
way Electric shock 3 3H Fire fighter to be deployed on site
All flammable material should be removed from the welding
Metal splatter Injury from explosion 3 2M operation area
Hot work pieces Eye damage of various kinds. 3 2M Only competen and authorised personnel to use equipment
Infra-red and visible light given off by Fire resisting sheets should be used to protect the surroundings from
welding gas Eye damage of various kinds. 3 2M flame and spatter
Hot works Operation Ultra-violet radiation given off by
electric arc welding Eye damage of various kinds. 3 2M Appropriate PPE to be used when carrying out hot works operation
Equipment to be well maintained and inspected as per manufacturer's
Misuse of equipment Injuries may aris from manual handling 3 5H recommendations
Extra ventilation should be introduced to reduce the likelihood of heat
Sparks and flying metallic particles Injury from explosion 3 3H stress occurrence
The placing of a second person on standby in case of emergency
should be considered
Hot works Operation

Subject: Risk Assessement for Steel Structure Installation Rev.01


Project: Zali Restaurant
Location: Marsa Al Bateen - Shop 11

Risk Assessement for Steel Structure Installation


S/N Activity Hazards Identified Risk Impact Probability Severity Risk Level Controls

Prolonged welding operations to be shielded from the sightline of


adjacent operatives to reduce the risk of 'arc-eye'