18-FOT-RA-Steel Structure Installation Works - Rev.1
18-FOT-RA-Steel Structure Installation Works - Rev.1
01
Project: Zali Restaurant
Location: Marsa Al Bateen - Shop 11
Overstress & overxertion in manual Use mechanical aid for heavy loads
2 2 L
handling No manual lifting beyond 50kg loads
Minimize manual whenever possible
Materials Handling Stress, strain, exhaustion
Observe proper stocking
No overload handling equipment
Toppling of loads 2 2 L
Material will have competent web slings connected with existing
concrete columns or beams where necessary
Fire and explosion from ignition of Burns or other fire related injury or
gas cylinders damage 3 4H Hot works permit (authority or client) system to be used
Ignition of other flammable materials
whilst hot work operations are under
way Electric shock 3 3H Fire fighter to be deployed on site
All flammable material should be removed from the welding
Metal splatter Injury from explosion 3 2M operation area
Hot work pieces Eye damage of various kinds. 3 2M Only competen and authorised personnel to use equipment
Infra-red and visible light given off by Fire resisting sheets should be used to protect the surroundings from
welding gas Eye damage of various kinds. 3 2M flame and spatter
Hot works Operation Ultra-violet radiation given off by
electric arc welding Eye damage of various kinds. 3 2M Appropriate PPE to be used when carrying out hot works operation
Equipment to be well maintained and inspected as per manufacturer's
Misuse of equipment Injuries may aris from manual handling 3 5H recommendations
Extra ventilation should be introduced to reduce the likelihood of heat
Sparks and flying metallic particles Injury from explosion 3 3H stress occurrence
The placing of a second person on standby in case of emergency
should be considered
Hot works Operation