JDRS ENGINEERING

Blk 10 Lot 37, ALDEA REAL Phase 1,


Ciudad De Calamba, Brgy. Punta,
Calamba City, Laguna, Philippines
Reg. Tin No.: 245-681-621-000
Contact No.: (+63) 999 886 9169
Email Address: dreynajr@gmail.com

To : Ms.
Ms.Shiela
AngeliRosales
Rosales/ Ms.Angeli Rosales Date: July 24, 2023
Project Address : Lot 15, Blk 8, Ph3 – Aldea Real Quotation No.: 2023 – No.040

Dear Mam
Dear MamRosales,
Michelle,
Relative to your requirements, we are pleased to submit our best and final quotation for your perusal.

Item No. Price per Unit Total


CONCRETE FENCE AND GATE
Design and Drawings Php 20,000 / Lot Php 20,000.00
Site Clearing / Preparation / Excavation Work Php 20,000 / Lot Php 20,000.00
Left Side Concrete Fence (2.0 m - height), Total Linear Meter: 8 meters
➢ 25cm x 10cm Concrete Column, 4x12mm dia. RSB (3 units)
➢ 60cm x 60cm x 30cm Concrete footing with 5x5x12mm dia. RSB (3 units)
➢ 4” CHB Wall with 10mm horizontal and vertical RSB Php 4,500 / Linear Php36,000.00
➢ Plastering works (inside and Outside) – 1 lot Meter
➢ Consumables – 1 lot
Note: Note: No tie beams, wall footing and Concrete columns are design for
concrete fence only
Rear Side Concrete Fence (2.60m height), Total Linear Meter: 12 meters
➢ 25cm x 10cm Concrete Column, 4x12mm dia. RSB (5 units)
➢ 60cm x 60cm x 30cm Concrete footing with 5x5x12mm dia. RSB (5 units)
➢ 4” CHB Wall with 10mm horizontal and vertical RSB Php 5,800/ Linear Php 69,600.00
➢ Plastering works (inside only) Meter
➢ Consumables
Note: No tie beams, wall footing and Concrete columns are design for concrete fence
only
Right Side Concrete Fence (2.0m height), Total Linear Meter: 12 meters
➢ 25cm x 10cm Concrete Column, 4x12mm dia. RSB (2 units)
➢ 60cm x 60cm x 30cm Concrete footing with 5x5x12mm dia. RSB (2 units)
➢ 4” CHB Wall with 10mm horizontal and vertical RSB Php 4,500 / Linear Php 54,000.00
➢ Plastering works (inside and Outside) Meter
➢ Consumables
Note: No tie beams, wall footing and Concrete columns are design for concrete fence
only
Front Concrete Fence (2.0m height), Total Linear Meter: 10.5 meters
➢ 25cm x 25cm Concrete Column, 4x12mm dia. RSB (5 units)
➢ 60cm x 60cm x 30cm Concrete footing with 5x5x12mm dia. RSB (5 units)
➢ 4” CHB Wall with 10mm horizontal and vertical RSB
➢ Plastering works (inside and Outside) Php 6,000/ Linear Php63,000.00
➢ Smooth Painted Finish Meter
➢ Consumables
Note: No tie beams, wall footing and Concrete columns are design for concrete fence
only
Garage Gate, Service Gate and Metal Grills
1. Garage Gate (6ft Height x 4.0 meters Width) PHP 6,500 / Linear Php 26,000.00
➢ GI Tubular Framing and Grills Meter
➢ Pillow Block and Anchor Bolts
➢ Gate Lock
➢ Epoxy Primer
➢ Smooth Painted Finish (up to 2 Colors Combination) PHP 10,000 / assy Php 10,000.00
2. Service Gate (6ft height x 1.5 meters width)
➢ GI Tubular Framing and Grills
➢ Pillow Block and Anchor Bolts
➢ Gate Lock
➢ Smooth Painted Finish (up to 2 Colors Combination)
3. Metal Grills Php 25,000 /lot Php 25,000.00
➢ GI Tubular Framing and Grills (1”x3” GI Tubular Grills)
➢ Smooth Painted Finish (up to 2 Colors Combination)
4. Gate Post / Concrete Fence Lightings Php 30,000 / lot Php 30,000.00
➢ Electrical Wiring/Conduits
➢ Gate Post Lamp (5 units)
➢ Decorative Pin Light (5 units)

Concrete Flooring (Total Area: 40 sq.m) Php 1,000.00/sq.m Php 40,000.00

Clearing / Hauling of all debris and construction waste Php 10,000.00 / lot Php 10,000.00
KITCHEN EXTENSION
Site Preparation and Excavation Works Php 12,000.00 Php 12,000.00
Construction of Structural Support and Roofing
(Total Area: 24.0 sq.m) – As Per Drawing
➢ Concrete Column (4 units)
➢ Concrete Footing (4 units)
➢ Concrete tie-beam (down only)
Php 2,500 / Square
➢ Rebar Works Php 60,000.00
Meter
➢ Structural (Design for 2nd Floor)
➢ Color Roofing (red color)
➢ Flushing, Gutter, Down Spout
➢ Concrete flooring – ground floor (3 inches thick)
Consumables
Concrete Walls
Total Linear Meter: 10.3 linear meters (note: 4.40 Meters height)
➢ 4” CHB Concrete Wall (4.4 meters height)
➢ Concreting Works Php 51,500.00
Php 5000.00 / linear
➢ CHB Layering
meter
➢ Rebar Works
➢ Form Works
➢ Plastering Works (inside and outside)
Consumables
Construction of Kitchen Counter and Sink (0.6m width)
Total Linear Meter: 6.4 linear meters
➢ 60 x 120 Floor Granite (side wall)
➢ Stainless Sink (Double)
PHP 8,000 / linear
➢ Water Faucet Php 51,200.00
meter
➢ Water Lines (Tap to existing)
➢ Sewerage Line (Tap to existing)
➢ Concrete framing
➢ Counter top – 60 x 120 Granite tiles
➢ Cover Door below kitchen Counter
➢ Consumables
(note: Above Kitchen Cabinet not included)
Door (1 set) – kitchen
➢ Door Framing (GI Tubular)
➢ Door Set PHP 12,000 / Set Php 12,000.00
➢ Door Knob
➢ Consumables
Awning Window (2 sets) – Kitchen
➢ Windows Framing
➢ Awning Window Assembly PHP 10,000 / set Php 20,000.00
➢ Sealant
➢ Consumables
Floor Tiles – Ground Floor
Total Square Meters: 25 sq. meters
➢ 60 x 60 Floor granite tiles (standard design) PHP 1,600 / square
Php 40,000.00
➢ Tiles Adhesive meter
➢ Tile Grout
➢ Consumable materials
Ceiling, Total Area: 25 sq.m
➢ Structural Framing
Php 1,200.00 Php 30,000.00
➢ Hardieflex Ceiling
➢ Consumables
Electrical Works – Kitchen Extension
Php 600 / Lightings Php 6,000.00
➢ Decorative Lightings (10 units) (All are pin lights)
Php 1200 / Outlet Php 4,800.00
➢ Convenience Outlet (4 units)
Php 1000/Switch Php 2,000.00
➢ Switches (2 sets)
Php 6000/panel Php 6,000.00
➢ Panel with 4 branches (1-40A, 4-20A)
Php 4,000/lot Php 4,000.00
➢ Wirings/Conduits
Php 2,000/lot Php 2,000.00
➢ Consumables
Painting Works (Smooth Painted Finish) – Kitchen Extension, inside only
➢ Paint
➢ Brush/Rollers Php 25,000.00 Php 25,000.00
➢ Skim Coating
➢ Consumables
RENOVATION OF STAIRS GOING TO ROOF DECK
Second Floor Wall Extension (2.0m height), Total Linear Meter: 7 meters
➢ 4” CHB Wall with 10mm horizontal and vertical RSB
Php 3,000 / Linear Php 21,000.00
➢ Plastering works (inside and Outside)
Meter
➢ Smooth Painted Finished (inside and Outside)
Roofing Extension, Total Area: 10 Sq.m
➢ Installation of Structural Framing
➢ Color Roofing
Php 1,700 / sq.m Php 17,000.00
➢ Gutter
➢ Flushing/ Down Spout
➢ Consumables
1. Ceiling, Total Area: 10.0 sq.m
➢ Structural Framing
Php 1,200.00 Php 12,000.00
➢ Hardieflex Ceiling
➢ Consumables
2. Door (1 Set for Second Floor)
➢ Door Framing (GI Tubular) PHP 8,500 / Set Php 8,500.00
➢ Door Set (Ordinary)
➢ Door Knob
➢ Consumables
3. Window (1 set) – Second Floor
➢ Windows Framing
➢ Window Assembly PHP 7,500 / set Php 7,500.00
➢ Sealant
Consumables
4. Electrical Works – Kitchen Extension
➢ Lightings (1 unit Pin Light) Php 600 / Lightings Php 600.00
➢ Switches (1 set) Php 600/Switch Php 600.00
➢ Wirings/Conduits Php 1,000/lot Php 1,000.00
Consumables Php 300/lot Php 300.00
5. Painting Works (Smooth Painted Finish, inside only) – Additional
Area, 1 Lot
➢ Paint Php 7,000.00
Php 7,000.00 / lot
➢ Brush/Rollers
➢ Skim Coating
Consumables
TOTAL PROJECT COST (VATEX) PHP 795,607.00

TERMS AND CONDITIONS:


1. Fifty Percent (50%) down payment, Fifty Percent (50%) full payment will be collected after project
completion.
2. All additional scope other than mentioned above shall be charged separately.
3. Lead time for the delivery/installation will be 6 to 8 weeks.
4. Cancellation of any portion of this contract is sucbject to forfeiture of the 20% of the downpayment.
5. Items and/or any materials delivered to the client shall remain exclusively as property of JDRS Engineering,
unless paid in full.
6. Client hereby authorizes JDRS Engineering to pull out subject/installed items in case of failure to comply with
the terms and
conditions hereof and failed to pay the contract price.
7. Price Validity: Thirty (30) days from the date of the qoutation.
8. Warranty: 6 months on materials and services.
9. All regulatory requirements / permitting / construction bond will be responsibility of the client.

Thank you and Godbless!


Engr. Diosdado T. Reyna Jr., PEE, CEM
JDRS Engineering Owner