Make kitchen counter in inside and outside kitchen sum ----------------------- = $ 160,000
box and cast and dress big column top # 5 x 6500 --------------------------- = $ 32,500
Supervise leveling yard spray yard install iron to wall sum ----------------------- = $ 60,0
2 mason help cast belt beam ½ day pay for 2 days x 7000 -------------------- = $ 14,000
2 mason make scafoldding to rough cast and render wall ½ day each --------- = $ 7,000
Pull down back eve and cut zinc tale sum of ----------------------------------------------- = $ 9000
½ day for 2 mason to help cast belt beam 2 x 3500 ------------------------------------ = $ 7,000
rough cast and wood float beam and column 91 ft run x 139 ----------------- = $ 12,649
Erect farm work ,steel up and cast stair case sum of 70,000 --------------------- = $ 70,000
Rough cast and wood float upstan 90 ft run x 139 ---------------------------------- = $ 12,510
rough cast and render beam and column 32 ft run x 185 ------------------------ = $ 5,920
box and cast and dress small column top # 3 x 4500 ----------------------------- = $ 13,500
cast ,lay and dress crove wall 106.9 ft run x 800 ----------------------------------- = $ 85,520
Make bar counter in basement and roof top sum ------------------------------------ = $ 90,000
erect and strip farm work to septic 369.8 sq ft x 180 --------------------------------------------- = $ 66,564
Erect farm work ,steel up and cast pit top sum of 50,000 ----------------------------- = $ 50,000
dress and steel float septic and gravel bed 50.7 sq yd x 555 ------------------------------------ = $ 30,913
Erect and strip farm work to arch way 80 sq ft x 180 ----------------------------- = $ 14,400