Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Project Job Ref.

PROPOSED ………………………………
Section Sheet no./rev.
FOOTING LOADING ON GRID …………… 1
Calc. by Date Chk'd by Date App'd by Date
OJ 5/18/2022

LOADING ON THE STRUCTURE

Footing

Assumed baring capacity of 200


At the base

= 110 x 943.07
100

=1037.377KN

SBC = L
A

200= 1037.377
A

A = 1037.377
200
A = 5.1869

Size = 2.3 x 2.3m

FactorMoment

MU = P X B X (B-D)2 X 1
2 2

MU = 1037.377X 2.3(2.3-0.35)2 X 1
2 2
MU = 154.146KN/m

d= MU
0.15 X fck X b

d = 1134.1 X 106
0.15 X 25 X 2300

d = 362.6 mm

You might also like