2nd Quarter Exam TLE 9
2nd Quarter Exam TLE 9
2nd Quarter Exam TLE 9
I. MATCHING TYPE
Direction: Match the words in column A with their meaning in column B.
Write the letter of answer before each blank.
COLUMN A COLUMN B
_____1. cloth used in making garments
_____2. exactness of a measured
distance or circumference a. Pattern
_____3. longer or longest dimension of b. Conversion
an object to measure c. Sewing tools
_____4. piece of paper usually one-half d. Calculator
of the body parts used as a guide e. English system
_____5. instruments that aid in f. Metric system
accomplishing a sewing task g. Length
_____6. changing portion of a garment h. Fabric
so that it fits the body i. Altering
_____7. an electronic device used for j. Cutting tools
speed computation k. Sewing machine
_____8. has inches for its basic unit l. Grain
_____9. a tool for cutting m. Measuring tools
_____10. based on a unit of length n. Individual Measurement Chart
known as the meter o. Accuracy
_____11. the process or an act of p. Calculation
calculating q. Cost
_____12. change of figures r. Hemline
_____13. used to stitch fabric s. Measurement
_____14. the marked line at the bottom t. Marking tools
of the garment where the hem is turned u. Width
_____15. IMC stands for v. Instruction Measuring Chart
_____16. amount paid or charge for
something that is acquired
_____17. direction of fabric threads
_____18. systematic procedure of
determining the quantity
_____19. instruments used for obtaining
quantities and dimension of real objects
_____20. required for transferring
pattern
II. IDENTIFICATION
Direction: Identify the components of a Project Plan. Choose your answer
inside the box. Write your answer on the space provided. Write
the letter only.
III. Direction: Arrange the steps in drafting the Apron Pattern to Fabric then
number them 29-37.
_______29. Using double fold hem (folding fabric in ½”, pressing, then folding ½”
again pressing for a 1” hem), pin and stitch the sides and bottom of
the apron.
_______30. Place the pocket on the center of the apron approximately 12” from the
top
_______31. Stitch 28” piece of ribbon to top left of apron.
_______32. Fold down ¼” along top and press. Fold 1” again and press. Stitch
facing down.
_______33. Place the apron pattern on the folded fabric and cut out.
_______34. Using a double fold hem (folding fabric in 5/16”, pressing then folding
5/16” again and pressing for a 5/8” hem), pin and stitch the curved
side of the apron.
_______35. Stitch 24” long piece of ribbon at the top of the straight side.
_______36. Fold the rectangle of coordinating fabric in half with right sides
together
_______37. Turn the pocket right side out and push out the corners of the pocket
with an item like chopstick.
IV. Direction: Arrange the steps in making an Apron Pattern then number
them 38-42.