1. GENERAL 3
2. PROCEDURES 3
3. REFERENCE DOCUMENTS 3
4. INSPECTION NOTIFICATION 3
5. APPENDIX 4
tl
al
N
LP1PPPM-PTSC
LONG PHU 1 THERMAL POWER PLANT PROJECT
Document No.:
LP1-PTSC- 10UZC-C-C1- INSPECTION AND TEST PLAN FOR Page 2 of 5
ITP-0001
TEMPORARY WAREHOUSE
Revision No.: 0 Date: 03/10/2016
. GENERAL
This Inspection and Test Plan (ITP) is a typical inspection plan for Temporary warehouse of Long
Phu 1 Thermal Power Plant Project.
• PROCEDURES
In case of any conflict between Subcontractor and EPC Contractor Procedures indicated in the ITP,
the EPC. Contractor Procedures shall be strictly adhered.
▪ REFERENCE DOCUMENTS
- TCVN 4453-1995: Monlithic concrete and reinforced concrete structures - Codes for construction,
check and acceptance.
- TCVN 9394-2012: Pile driving and static jacking works- Construction. check and acceptance.
• INSPECTION NOTIFICATION
The inspection notification shall be made in the daily communication between the EPC Contractor
and Sub- contractor as per Inspection and Test Plan.
I : Verification Of Inspection - Denotes the responsibility for implementing the verification of the
inspections required in the ITP and quality of the final product. These inspections are carried out
by the Subcontractor at the time of independent witness.
R: Review Point - Denotes the responsibility for review of relevant documents instead o
inspection/witness.
W Witness Point - Denotes the responsibility for witnessing and signing for the work. Formal
notification mustbe given to the interested parties in a timely manner. This would generally be
24 hour for site activities. Attendance by interested parties is mandatory but, on a case-by-case
basis, the witness activity may be waived. Intention to waive must be by written instruction
(email acceptable). The Subcontractor must document the inspection and endorse the record
before moving on to the next step.
H: Hold Point - Denotes the responsibility for witnessing and signing work to release Hold Points
in the work process. Attendance by interested parties is mandatory. Work may NOT proceed
beyond Hold Points without witness and sign off by the identified participants. Generally, the
formal notification for Hold Point witness will be delivered with at least 24 hour in advance for
site activities to ensure availability of interested parties.
. APPENDIX
A. CAVIL N\ ORK
L DOCUMENTATION
• Review Inspection
LP1-SICCO-10UZU-C-C1- .
1.2 Method statement certificate & Visual • Appros ed tor construction IZ RJW
CMS-001
inspection
• Review Inspection
Concrete mix proportion It \V
1.3 Concrete trial mix certificate & Visual • Approved for construction
reporting
inspection
• Review Inspection
Grout mix proportion R \\
1.4 Grout trial mix certificate & Visual • Approved for construction It II
reporting
inspection
111. MXIER1
Air content of mortar ASTM C150 ASTM C185-02 < 12% I H It/A'
Sulfur trioxide content (S(\) ASTM C150 ..1STM C114-03 <3% 1 H itly
Crushing Value in Cylinder in TCVN E51:E657572-11: Strength of stone > 1.5 - 2 times
TCVN 7570:2006 11 R/W
Saturated Water Condition 2006 strength of concrete l
Organic Matters Content TCVN 4506:2012 TCVN 6186:1996 Max. 15mgil I II R/W
Once every Test report
Water
6 months 1 Pl-c-iiiil
Suspended Solid Content TCVN 4506:2012 TCVN 4560:1988 \ lax. 200mg 1 I 1I I: W
Water absorption TCVN 1450 : 2009 TCVN 6355-5 : 2009 < 16% I H RV
Yield strength ASTM A416 ASTM A370 Min 1670 Mpa I H R/W
Tensile strength ASTM A416 Min 1860 Mpa i samples 'co Test report
., 13 Cable ASTM A370 I II R/W
Tons LP1-C-001
Elongation ASTM A416 ASTM A370 Min 3.5% 1 II R/W
. . . ..
:V. CONS-MI:CT! ON WORKS .... :-,!:.: :!:-::: ..: ,.E:i?: .:. .:: ' H.:.::::•• :::::' ' ' - :'. ' .. '' : . :•.:.. • '' • . :. :
-.:,:i:i:.:.:.:,:.:.::.::.:::: . ::•.:..:...::::.:::. .. .•-i:::• ' .• ::::::...:.:...:.:
Compaction factor • 22 TCN 02 - 71 • Sand cone method • > 95% ',4:m test I H RIW Lab Form
Mortar mixing design TCVN 4314:2003 Review Mix design approved I II R \V Lab Form
• As per design 1 II
Wall dimension TCVN 4085:2011 R/W
• Variation from plumb level
• Min 8mm. Max 15mm (bed
joint)
Thickness of mortar TCVN 4085:2011 • Min lOmm. Max 15mm (head I II R., W
I V.S \ lasonry work Check & measure joint) l.5 cry sit-mime
• Variation: 3mm/lm length LP1-C-015
Mortar compressive strength TCVN 4314:2003 TCVN 3121 -11:2003 > 7.5MPa 1 II R/W
Mortar compressive strength TCVN 4314:2003 TCVN 3121-11:2003 > 7.5MPa I H R/W
Pile head steel box installatioaTCVN 4453-1995 Check & measure As per AFC drawing I H R/W
Rehar installation TCVN 4453-1995 Check & measure As per AFC drawing I 11 R/W
Test repot t
Pile production Every structure
I V.7 LP1-C-019
work • As per AFC drawing
LPI-C-o22
• Deviation of concrete cover
Formwork installation TCVN 4453-1995 Check & measure thickness: 5mm I II R'W
• Length deviation: max 75mm
• Witdh deviation: max 5mm
TCVN 4453-1995
As per approved method
Concrete pouring LP1-SICCO-UZU-C-C1- Check & measure I H R/W
statement
CMS-001
LP1-SICCO-UZU-C-C1- I H R1W
Slump Check & measure 10-14 cm
CMS-001
- TCVN 4453-1995
As per approved method
Curing - LPI-SICCO-UZU-C-C1- Visual I H R/W
statement
CMS-001 Test report
Pile production Every structure
1\7.7 • R7? 75% compressive LP1-0019
work LP1-C-022
strength designed
Compressive strengh TCVN 4453-1995 TCVN 3118-1993 I H R/W
• R28> compressive strength
designed
Pile joint • TCVN 9394-2012 • Visual/ Measure • As per design document I H R/W
LP1-C-020
• AFC Drawings • Plan tolerance of pile head
Pile head coordinate • Survey I H R/W or
• TCVN 9394-2012 position< 0,2d = 6 cm
Every structure LP1-C-025
IV.8 Piling work
• Design Document I H R/W
Pile head's elevation • Survey • Deviation <f 5cm
• TCVN 9394-2012
Pile length • Design Document • Survey/ Measure • As per design document I H P1W
Pile inclination • Design Document • Survey/ Measure • As per design document I H !VW
OWNER Acid: Thanh Duc hamlet, Long Duc commune, Long Phu district, Soc Trang province, S.R Viet Nam EPC CONTRACTOR
BIEN BAN KIEM TRA MAY MOC THIET 13!
MACHINE — EQUIPMENT INSPECTION REPORT
Ngdy/ Date: Bien ban s6/ Protocol No.:
Bat dau/ Start time: Kk thud/ Finish Time:
Hang mud/ Item:
Nghirn thu xay di,mg/ Inspected Civil Work:
Ket eau/ Structure:
1. Phtrang Oar, Urn tra/Method of inspection
Quan ❑ Thi nghi em/Laboratory ❑ Tai lieu dinh kemlAttached sheet
cat/Vi vim/ ❑ Dinh gia/
Do Itimg/ ❑ Kh ao sat/Survey ❑ ❑ Assessment
KhaclOther
Measurement
SO/No Ni
.:1 dung nghi4n thu/Inspection Content ACC REJ N/A
I Chiing loail Type
2 Chirng chi xuk xtremg cfra nha san xu'at/ Mill certificate of manufacturer
3 GiAy to nhap khAu (neu co)/ With full of import & custom document (if any)
MA hieu/ Sigh - Phil hop v6i giiiy chimg nhan kiem dinh, hieu chart/ In accordance with
4
calibration certificate
SO ch6 WI Manufacture No. -Phil hop voi giAy chimg nhan kiem dinh, hieu chain/ In accordance ❑
5 El
with certificate-calibration
6 Tinh trang hoat Ong/ Working condition - Hoat d'Ong Binh thtremg/ Normal operation
7 Bang ke thiet hi dinh kern/ Attached equipment sheet
Kiem tra chimg chi, tern kiem dinh, hieu chuiln/ Check Calibration certificate, Calibration stamp
8
of equipment, device
2. Y kin cua giam sat Chii d'Au tr/ LP1PP Supervisor's comments:
3. Kk 1u4n1Conclusion:
Chit k'y
Signature
Ho va ten
Full Name
Note: ACC = Accepted, REJ = Rejected, N/A = Non-Applicable
I ,P1-G-002 Rev.0
LONG PHU 1 ( ..
THERMAL POWER PLANT PROJECT **600.
OWNER Add: Thanh Duc hamlet, Long Duc commune, Long Phu district, Soc Trang province, S.R Viet Nam EPC CONTRACTOR
s6 Diem TWEET KE/ DESIGN (m) THUC TE/ ACTUAL (m) CHENH LKH/ RIFF. (m) Ghi din
No. Point Remark
North (N) East (E) Elev. (EL) North (N) East (E) Elev. (EL) AN AE AH
-- --
OWNER Add: Thanh Duc hamlet, Long Due commune, Long Phu district, Soc Trang province, S.R Viet Nam EPC CONTRACTOR
Chit kST
Signature
H9 va ten
Full Name
Note: ACC = Accepted, REJ = Rejected, N/A = Non-Applicable
LP I -0-005
LONG PHU 1 ,-----
gEY.1q0 THERMAL POWER PLANT PROJECT ,..--.
LP1 PP i?*-1,.., •
Add: Thanh Duc hamlet, Long Duc commune, Long Phu district, Soc Trang province,
OWNER S.R Viet Nam
EPC CONTRACTOR
LONG PHU 1 ( .-
.0*.tog THERMAL POWER PLANT PROJECT
iiipp : Vire,C1 ,
Add: Thanh Duc hamlet, Long Duc commune, Long Phu district, Soc Trang province,
OWNER S.R Viet Nam
EPC CONTRACTOR
LP14.1-006 Rev .0
LONG PHU 1
;tag
mamma THERMAL POWER PLANT PROJECT 007.4
LP1 PP imirs=
OWNER Add: Thanh Duc hamlet, Long Duc commune, Long Phu district, Soc Trang province, S.R Viet EPC
SiiI.Vo Ni)i dung nghiem thu/ Inspection Content ACC REJ N/A
1 Don dcp cOng trtremg/ The work site is cleared 7 P
1 Kiem tra toa dO, cao dO, ranh gigi dao Mr& khi thi cong 0 0 0
.. _
3 Cong tac dao thgc hien theo dgng tuyen, bat d6c/giat cap va mai d6c ❑ 0 ❑
0
. _ .__
4 He thong thoat mac (ranh, barn...)/ Drainage system include trench, pit, pump, etc. P 0 0
5 Su On dinh mai doc hO dao va he thong ch6ng der' vach (neu c6) 0 0
6 Cao dO day Ito dao/ Excavated elevation is within tolerance 0 O E
7 DO chat day h6 dao/ Excavated density 0 0 0
1 • --- - -— --
8 Trai tam nylon/ Polyethylene spreading 0 0 P
3. i' kien dm gigm sat Chu din ttr/ LP I PP Supervisor's comments:
Chit kji
Signature
Ho va ten
Full Name
Note: ACC Accepted, REJ - Rejected, N/A - Non-Applicable
LP1-C-001 Rev .0
LONG PHU 1
.
ITMOVVIIAIN THERMAL POWER PLANT PROJECT
LP1 PP IfrirS1M
OWNER Ada: Thanh Duc hamlet, Long Due commune, Long Phu district, Soc Trang province, S.R Viet Nam EPC CONTRACTOR
Quan sat/Visual 0 Thi nghiem/Laboratory Eli Tai liti dinh kemlAttached sheet Li
Dinh gii/
Do luting/ Assessment
0 khan sat/Survey C KlyAc/Other —
Measurement
SOlNo Ni)i dung nghiem thu/ Inspection Content ACC REJ N/.A.
1 Dieu kien chuyen bate Ong tac dap-lap/ Release condition for fill-backfill II- 0 C
2 Vat to dap-lap phu NT va doge phe duyet/ Materials for fill-backfill are suitable and approved 0 a Li
3 Di dai cac vat to la/ Foreign materials are removed 0 CI 0
4 Chieu day, cao d6 mbri lap dap-lap phu hqp/ Thickness, elevation per layer are adequate 0 0 Ei
5 Ket qua thi nghiem d6 chat fling lap/ Test result offield density test per layer 0 0 0
----
6 Cao d6 hoan thien/ Finish level survey after fill-backfill and compaction E 0 0
7 Be mat hoan thien/ Finish surfaces conditions 0 0 CI
8 Kich thuac, d6 6n dinh dm khu vuc dap/ Dimension, stability offill-backfill area 0 0 0
9 Lap dat cac bien earth bao/ Installation of warning tape 0 0 0
10 Quan trac chuyen vi dia cong trinh Fan can/ Displacement of adjacent construction 0 0 CJ
3. i' kien caa giam sat Chet din ttr/ LPIPP Supervisor's comments:
I.P1-C-002 Re‘
LONG PHU 1
, ,,
. ,:
:WOO THERMAL POWER PLANT PROJECT 'Wiiii**
Li.-iii,... iii;:ii
OWNER Add: Thant' Duc hamlet, Long Duc commune, Long Phu district, Soc Trang province, S.R Viet NamEPC CONTRACTOR
2. Y kien cda giam sat Chu dAu tar/ LP1PP Supervisor's comments:
Chit 14
Signature
lio va ten
Full Name
Note: ACC = Accepted. IZI•li = Rejected, N/A = Non-Applicable
1,P1-C-003 0
CONCRETE TEST SAMPLE STAMP CONCRETE TEST SAMPLE STAMP (...1
'
PROJECT: LONG PHU 1 THERMAL POWER PLANT PROJECT: LONG PHU 1 THERMAL POWER PLANT
LP1PP/PMC P M- PTSC SUBCONTRACTOR LAB LPI PP/PMC PM- P ESC SUBCONTRACTOR LAB
I P1PP/PM( PM-PTSC SUBCONT RACTOR LAB LP I PP/PMC PM- PTSC SUBCONTRACTOR LAB
....s...
,•••.
f os: •
CONCRETE TEST SAMPLE STAMP • .. ..,..:.. CONCRETE TEST SAMPLE STAMP s.,:::::::: . .
PROJECT: LONG PHU 1 THERMAL POWER PLANT PROJECT: LONG PHU 1 THERMAL POWER PLANT
SUBCONTRACTOR LAB
.•
CONCRETE TEST SAMPLE STAMP Ko.,—
..X K owtwi,
CONCRETE TEST SAMPLE STAMP ',..<-"-
K ..,:.;,_.
PROJECT: LONG PHU 1 THERMAL POWER PLANT PROJECT: LONG PM 1 THERMAL POWER PLANT
L PI PP/PMC PM- PTSC SUBCONTRACTOR I.\ Li. I PP/PM C PM- PTSC SUBCONTRACTOR :.. \ B
LP 1 -C-Ho o Re \
GROUT TEST SAMPLE STAMP
LPIPP/PMC Pht PTSC SUBCONTRACT,* LAB I P1PP PM, Pm. PTSC SUBCONTRACT,* LAB
1111.1. PM( PSI PIS, SI B, °NI R t, roR I tB LPLPP*MC PM-PTSC SUBCONTRACTOR LAB
t;zai:
• ?.v.:*. ::
GROUT TEST SAMPLE STAMP Au s GROUT TEST SAMPLE STAMP '..::4 •
,r•-....
PROJECT: LONG PHU 1 THERMAL POWER PLANT PROJECT: LONG PHU I THERMAL POWER PLANT
S6/No.:
Cling trinh/Project: Temporary Warehouse
Dia diem/Local: Long Phu, Long Duc, Soc Trang
Lo0 sari phtim/Commodity: Reinforcement concrete pile
S6 luvng/quantity: S6 hiWcode :
So liayng/quantity: S6 hiO/code :
So luvng/quantity: S6 hiO/code :
2 Chat luvng m6i him/ Weld quality Dat/Accept 111 Khong dat/Not Accept [11
3 IKCt Man/Conclusion:
•
Phan III: VAN KHUON, COT THEP Ngiry/Date:
1 Van khuon/Formwork
2 C6t thep/Reinforcement:
LP1-C-019 Rc\ (
- Thep chit/Main rebar Dat/Accept ❑ KhOng dat/Not Accept
3 K& luan/Conclusion:
flat yeu eau, cho phep d6 be tong/ Dat/Accept CI Khong dat/Not Accept El
5. K6t Juan/Conclusion:
LP1-C-019 Rev.0
Phan VI: THANH PHAM Ng4v/Daie:
Part VI: PRODUCT
1. Ngooi quan san pham/Appearance:
Kich thtrac hinh hoc/Dimension: Dat/Accept 0 KhOng dot/Not Accept
3. K6t luan/Conclusion:
Dat yeu cau, dtra vao ton trir, xuat xudng/ Dat/Accept 0 Khong dat/Not Accept ❑
Acid:Than it 1) u c ham let, Long Duc commune, Long Phu district, Soc Trang province, S.R Viet EPC
OWNER
Nam CONTRACTOR
Vi tri Ong viec/ Job Location:..... ... ..... . Bien ban s6/ Protocol No .:
Ko Ghi
Cong vied Work Item Dat/Pass
dat/Fail cliWNotes
I .
Kiem tra thiet bi/ Equipment to be used for testing
K ii:'.m tra chat lacing cc.c/ Pile's material has been inspected and approved
Kiem tra vat to phu/ Auxiliary material has been inspected and approved
S6 hieu mai coc/ Bottom segment no.: ...... . S6 hieu than coc/ Middle segment No. •
Type machine/ Loai may : Thuy list tinh Maximum pressure liip lifc tiii da : Ton
Date of Pressing/ NgOv ep coc: . Elevation of Ground/ cao d() Mi:11 dat:
LP I -C-020 Rev.O
Start Time/ Bat di:1u: .......... .. ............ Finish Time/ K'di thtic: __ .......... ..
Pile Toe Elevation (m)/ Cao dO mil! coc (in): ... ... ... ... ... ... ....
II
Note: Depth is determined as the depth of pile at the design elevation of pile head.
Ghi cha: DO sciu ducc xac dinh la chieu sau coc di xuOng tinh tir cao do thief ke ddu coc.
Ni din cac ben/ On behalf of representatives
OWNER/CONSULTANT EPC CONTRACTOR SUBCONTRA("I'OR
LPIPP/PMC PM-PTSC
Chile danh
Position
Chit 14
Signature
LPI-C-020
Kamm
•
LONG PHU 1
• ,
LP 1 PP
THERMAL POWER PLANT PROJECT
NHAT Ki".EP C9C/ PILE PRESSING LOG
!tang mtie (ling trinh/ Item: Lo#i c9c1 Pile type:
DO chi Tip docod Pile coordinate
KS, hieu down c9c to khi dirng Plant Chitt dai cod Length Cao NW u Ccc I Elevation Of
Ten coc/ Ngay ep/ mill dCn dAti coc ep/ Pile's
VN 2000 0 Coordinates U Sai so/ Of Pile (m) Pile Head (m)
(,hi chti/
Sii T'l / No. Pile's Pressing Pile seg. Symbol from Refusal Thi"e't Ki.1 / Design Thtrc Te /Actual Deviation
Remarks
Nanze date Bottom segment to when (cm) Sai
Top segment finishing x (m) Thit Ke / Thtic -1-• / Thiel tie / "Chun 'I / •
It (m) X (m) 'V (m) solDeviati
(cm) Design Actual Design Actual
on (cm)
PI -C-0*,I Roy 0
116
LONG PHU 1
PETROVIETWO THERMAL POWER PLANT PROJECT K Immo
. PS=
LP1PP
BIEN BAN NGHIEM THU COC VAO CONE TRU'ONG
PILE DELIVERY TO SITE CHECKLIST
00000
I GiAy chang nh4n xuai wan/ Pile certificate; Lji Lich c9c/ Pile casting resume
CI
2 Chi''u rOng dm c9c : ± 5 mm/ Width of pile: ± 5 mm El _
3 Nirt do au, van chuytn/ Crack caused by hoisting, deliv CO/ Yes LI KhOng/ No
4 Sai *h chi'eu dai: ± 75mm chiL dai clop c9c/ The tolerance of pile length: ± 75 mm pile length n _
5 Sai lech dO Ong: 0.3% chi6'u dai coc/ The tolerance of deflection: 0.3% pile of length -1--- •
Stt Lokii c9c Kich Ca c9c Ma hi'e'u c9c/ Pile marking S6 luctng c9c Ngay san xuAt
No. Pile Type Pile Size Tic/ From: .......Den/ To: Number of piles Produced date
10
NhA may san xuAt/ Production plant: Tong so lining eye/ Total number of piles :
i" kin ciia giam sat Chii (fall to - Tir van (neu 0)/ Owner - Consultant Supervisor's comments (if any)
Chit 14'
Signature
119 WI ten
Full Name
Note: ACC = Accepted, REJ = Rejected, N/A = Non-Applicable
LP1-C-023 Rev.(
..., .....,
•,ri::i
LONG PHU 1 '4\ 2
THERMAL POWER PLANT PROJECT - • •R,: :‘,..:'::
::::,:s::: •-•• • ,
LP1 Pt*
OWNER Add: Thanh Duc hamlet, Long Due commune, Long Phu district, Soc Trang province, S.R Viet N. n€PC CONTRACTOR
BIEN BAN NGHIEM THU CONG VIEC XAY DUNG
ACCEPTANCE OF THE CONSTRUCTION
Ngay/ Date: Bien ban sii/ Protocol No.:
BAt din/ Start time: Ket thud/ Finish Time:
Hang mud Item:
Nghiem thu xay &pig/ Inspected Civil Work: CONG TAC XAY/ MASONRY WORK
Ket can/ Structure:
1. Tait lieu can cu nghiem thu/ Based documentation for acceptance:
1.1 W.I.0 au nghiem thu/ Request for inspection:
1.2 Ban ve dirqc pile duvet/ Approved drawings: Phien ban/Rev.:
1.3 lieu chuAn áp dung/ Applicable code and standard:
1.4 Kt qua kiern tra, thi nghiem/ Inspection and testing result
1.5 Tai lieu ky thuat/ Specification:
Dinh gial Assessment
No. MN dung nghiem Mu/ Inspection Content
ACC REJ N/A Date Sub. Con. Own.
1 CAI) phOi trop viral Mortar mixing design U 0
2 LAy mu/ Mortar sampling for compressive testing U U•
3 Hinh clang va kich think hinh hoc! Shape and size of wall Li U III
8 An Wan/ Safety
2. Y kien ciia giam sat ChU thin ttr/ LPIPP Supervisor's comments:
3. Kb 1u4n/ Conclusion:
Add: Thanh Duc hamlet, Long Duc commune, Long Phu district, Soc Trang province, S.R Viet EPC
OWNER
Nam CONTRACTOR
Vi tri Ong viec/ Job Location: .................... ....... .............. Bien ban s6/ Protocol No.:
Ko Ghi
C6ng vi'ec/ Work Item 1)4t/Pass
dat.1Fail chulNotes
Kiem tra chat lacing coc/ Pile's material has been inspected and approved
Kiem tra vat to phu/ Auxiliary material has been inspected and approved
S6 hieu min coc/ Bottom segment no.: ... ...... S6 hieu than coc/ Middle segment No.
.
ps6 hieu dau coc/ Top segment no.: ... ..
Thiet bi en cod Driving equipment :
Type machine/ Loai may : Thuy lyv trnh Maximum pressure lAp Arc U.-if da : Ton
Date of Pressing/ ,Nay ep cac: .................... ...... Elevation of Ground/ Cao da mat da t:
I .P 1 -C-025 Rev.O
Start Time/ Bat dau: Finish Time/ Keq fink:
Pile Welding
Pass/ Fail/ Start time/ Finish time/
position/
Pyr Khong dot Tgian hat dau hrrn T.gian ket thuc han
17 tri han coc
Bottom segment-
Middle segment/
cpc-thein coc
Designed/ Thit ke
Note: Depth is determined as the depth of pile at the design elevation of pile head.
Ghi chic: DO sau dirov xac Binh chichi sari coc di xuang tinh cao 643 thief ke dau c()c.
Dai dien cac ben/ On behalf of representatives
OWNER/CONSULTANT EPC CONTRACTOR SUBCONTRACTOR
LP 1 PP/PMC PM-PTSC
Chirc danh
Position
Cher kv
Signature
1-10 va ten
Full .Vaine
I .131-C-025 Rev.(