Contractor : BMS
Subcontractor : Enjaz Al-Arabiya Contracting Company
Subject : Extra work done by Enjaz Al-Arabiya Till 10-01-2024
SI ITEM Location UNIT QTY
1 Automatic Air Vent 1/2" and valve for cooling skid supply and return D2 PCS 32.00
10 CRAH Stanless Steel Hose both MNPT fixed 1.5" X 70 cm D2 PCS 24.00
11 Remove and install new insulation and cladding on SCWP 7 & 8 to avail plate D2 LOT 1.00
Thermal storage tank Leakage maintenaince ,,, Romove cladding and insulation and reinstall
12 D2 PCS 6.00
new material
13 Thermal storage tank : Alumium Clading Box for Cover Tank LEG D1/D2/D3 Tank 16.00
14 Modify of Chilled Water Pipe in D-1 for FCU`s in the corridor with new insulation and cladding D1 Lot 1.00
15 Circulation pump and generator expenses after flushing (As Mail) D2 Day 13.00
17 Supply and install 6 inch valves instead of motorized BFV to procees with flushing D2 PCS 4.00
18 Supply and install 1/2 inch valve for DPT D2 PCS 8.00
24 Supply and install DRV for BM FCU and POD 4 FCU D2 PCS 16.00
25 Engineering support during TCCF L3/L4 and operation of plant with technical team D2 LOT 1.00
Preprartion of the As-built and shop drawing for the Fuel system, water supply and
26 D2 LOT 1.00
condensation drawings
27 Supply and install ball valves for cooling skid CRAH connection POD 6 D2 PCs 12.00
28 Installation of ball valves for cooling skid CRAH connection POD 4,5 D2 PCs 24.00
30 Vibration and Noise test for Chiller Area D1/D2 LOT 1.00
TOTAL
Enjaz Al- arabiya Engineer
Eng/ Mohamed A Elmorsy
3,300.00 19,800.00
3,900.00 23,400.00
7,000.00 42,000.00
9,000.00 54,000.00
0.00 0.00
80.00 5,760.00
110.00 7,920.00
500.00 12,000.00
1,000.00 1,000.00
1,500.00 9,000.00
1,200.00 19,200.00
0.00
5,600.00 72,800.00 الزم تكون في ورق مستقل
28,000.00 28,000.00
2,887.00 11,548.00
250.00 2,000.00
3,000.00 6,000.00
3,400.00 3,400.00
3,500.00 7,000.00
5,000.00 5,000.00
680.00 8,160.00
600.00 9,600.00
20,000.00 20,000.00
15,000.00 15,000.00
408.00 4,896.00
250.00 6,000.00
0.00
0.00
0.00
0.00
407,009.00
SBM PROJECT MANGER
Eng/ Ahmad Al-Zou'bi
Project : DMM052 D2 - STC DATA CENTER
Contractor : BMS
Subcontractor : Enjaz Al-Arabiya Contracting Company
Subject : Extra work done by Enjaz Al-Arabiya Till 16-05-2023
5 Guard room split unit maintenance- Gas filling and cladding rectification on the roof D1 LOT
6 Staging Room D1 m2
7 DC room D1 m2
8 MMR room D1 m2
Romove cladding and insulation from day 1 makeup line and install two pressure guages
20 D1 LOT
and re install insulation and cladding after finish
21 Supply GRB tank for water supply lift station 3000 litre D1 PCS
22 Installation of flexible connection 6" Between cooling skid and main loop with bolts D2 PCS
28 Remove and install new insulation and cladding of piping for last previous item D1 LOT
30 Cleaning and final paint for DAY 1 Gen pipe connection D1 LOT
32 Rectify broken pipe connection in D1 tanks and remove diesel leaked from tank area D1 LOT
34 for FUEL / 3" Ball valve and reducer with hose FOR ROOF D1 LOT
35
TOTAL
264,571.00