Formato de Inicio - 24001 Casa Mesa de Los Santos
Formato de Inicio - 24001 Casa Mesa de Los Santos
KICKOFF MEETING FO
This template should be filled out before the first kickoff meeting of the project, by the assigned engineer (notified by the coordinator)
example) the same file will be used to log all the information. Use the color legend to the right to distinguish between the different kic
manner by all involved in the project. The kickoff template has the following structure. First is the kickoff meeting attendees with info
0 Project Organization
INITIAL DATA
How did the project Email from TJ
arrive?
Date on which the project 29/11/2023
arrived?
Who received the email? Sergio Gonzalez
2 Initiation tasks
To fill this section please create the appropriate folders and documents where the information will be saved. Remember to create the fo
kicoff meeting
Table 2,1 as well. It is important to have all the channels to register the information to avoid delays later on. Fill the (Y/N) colum
Space (Y/N) Notes
2,1,1 Clockify SY TRUE
3 What
The what section describes specifically the scope of the project, what will be included, and what won't. To do this it is not just necessa
will be designed, and any additional notes that will help tackle any problems before they arise. This section also describes the delivera
REFER TO THE SCOPE DOCUMENT (section 1) OF THE PROJECT TO FILL THIS SECTION, AND PROVIDE BETTER DES
3,1 Project (inclusions) from the scope document
The following questions will define what will be included in our scope. Before filling this section take a look at the proposal documen
a) ·answer
What iseach
theof theofquestions
type project? in as much detail as possible. The clearer we can answer the questions the better we can move forward w
New Construction
b) · What is being built? (what does the client want to do? In this section describe the whole project regardless of whether it is in our scop
Multi-family residential structure (New Construction) Based on R
d) · What types of structures are we going to design? (for example, concrete structures, retaining walls, wood framing, conventional stee
(table 3,1,1) fill the names of the structures and provide comments or descriptions for the structres you enter
Table 3,1
Number Structure Comments
3,1,1, Floor Framing (All levels) Material: Wood
3,1,2, Roof Framing Material: Wood
3,1,3, Posts Material: Wood - 6x6 Post UN
3,1,4, Foundation Strip Footing for Perimeter Walls and Pad Footing
3,1,5, Lateral Resisting System Wood Shearwalls with Holdow
3,1,6,
Others
e) · What is the lateral force-resisting system of the structure? (select the force resisting system accroding to table 12,2-1 from the ASCE
combination of froce resisting systems sections12,2,2 12,2,3 12,2,3,1 12,2,3,3)
A. BEARING WALL SYSTEM - 15. Light-frame (wood) walls sheathed with
f) · What special conditions are in the project? (big overhangs, steel elements, tall retaining walls, parapets, etc)
None
g) · What non-structural elements require a detail/design? (for example, counter top and stools inside a pool, kiosk, decorative beams, lat
N/A
i) What special checks are needed for the design of the the structures
N/A
j) What assumptions are we making? (are we assuming a soil bearing pressure, or a type of connection, or that the existing lateral resysta
Soil Values (Allowable Bearing Pressure) - (IBC Chapter
k) what structural observations or special inspections are needed? (fill out the following tables based on the information found in section
Mention any Special inspections that will be required (concrete compresive strength greater than 2500 psf, deep foundations, etc)
Concrete compressive Strength - 3000 PSI
Additional Notes:
N/A
4 Where
4,1 Project location
The where section describes the geographical location of the project which will influencethe design criteria for the project. For this se
title block
Table 4,1 of the project and related folders and documents. In the client section use the dropdown menu to select the correct client. Fo
4,1,1 Project name Douglas Apartments-Nevada
4,1,2 Project number 23-133
4,1,3 Client MDS
4,1,4 Address 8625 N Nevada St
4,1,5 CIty Spokane
4,1,6 State WA
4,1,7 County (optional) Spokane
4,1,8 ZIP code 99208
4,1,9 EOR seal TJ seal
Table 4,2
Structure type
Design criteria Value Reference
https://hazards.atcouncil.org/#/wind?lat=47.4717096&lng=-117.6061082&address=1633%20W%201st%20St%2C%20Cheney%2C%20
Wind speed (mph) 110
Wind GCPI factor 0,18/-0,18
Ground snow load 30
(lb/sqft)
Seismic Design Category C
Soil bearing capacity 1500 PER IBC CHAPTER 18, MINIMUM REQUIREMENTS
(lb/sqft)
5 When
This section serves to describe the dates in which the project will be worked on, most of the information pertaining to this section has
the budget of the project and the dates for the deliverables. The phases are connected to the ones described in section 3,3. In the percen
Table 5,1
Awarded date 7/12/23 Notes
Total Budget hours 40
Phase % of duration for each Hours per phase Duration (weeks, taken from the
phase proposal)
Schematic set 40.00% 16 1.00
Design Development 40.00% 16 1.00
Permit set 10.00% 4 1.00
6 Who
This section describes the roles of the people involved in the project. To fill the table enter manually the names of the members of the
only ONE responsible. the last three spaces are reserved for "others" whose role does not appear on the list.
Table 6,1
Name Role
Sergio Gonzalez Coordinator
Joan Martinez Responsible
Daniel Rodriguez Responsible
7 How
The How section will clarify the process that the team will follow to complete the project.
Schematic set
Design Development
Design Development
Permit set
Calculations
Table 7,2,2
Milestone Task Description
Schematic set
Design Development
Permit set
PS-ENG-TO-SYN-F003
MEETING FORM V01
07/19/23
MEETING FORM
eer (notified by the coordinator). Should there be more than one kickoff meeting (client kickoff, SY kickoff, for
guish between the different kickoff meetings. The template will be filled in the Zoho workdrive in a collaborative
off meeting attendees with information on the date and type of kickoff, second is the initiation tasks where we will
eople present in the list of the platform where the meeting is taking place and pasting it into the attendee’s column.
he client, with SY, etc), and finally the date by double clicking the cell and selecting the correct date. The objective of
aved. Remember to create the folders and documents following the instructions from the manuals, and do it before the
ys later on. Fill the (Y/N) column by checking the boxes. Check the box for Yes, leave it blank for No. If one of the
Manual Link
https://writer.zoho.com/writer/open/mu0cxd6217e98a7be45be8204be4e29731251
https://writer.zoho.com/writer/open/9mttx39c963df40ba487c961c7c6dd57ebde2
To do this it is not just necessary to describe the scope but define what materials we are going to use, what structures
ction also describes the deliverables, the information received from the client, and the phases of the project. PLEASE
AND PROVIDE BETTER DESCRIPTIONS BASED ON SAID DOCUMENT. The sections in GREEN will be taken
the scope document
a look at the proposal document as this document will already contain a scope description. Using that document
better we can move forward with the design and drawings.
ood framing, conventional steel, CMU bearing walls, ICF walls) In the table below
enter
Comments
Material: Wood
Material: Wood
Material: Wood - 6x6 Post UNO
erimeter Walls and Pad Footings for Post (Concrete)
Wood Shearwalls with Holdowns
to table 12,2-1 from the ASCE, note the R value and specify if there is a
me (wood) walls sheathed with wood structural panels rated for
None
N/A
II
N/A
made on the previuos section. Remember to be as detailed in the answers as possible as this will serve us in the quality
N/A
N/A
elated to dates and time destined for each phase is described in section 5, the "when" of the project.
omments
t Package - (SETUP)
ll Package Submittal)
t of the scope in the table 3,1 (using the same number), please select the materials that will be used on those
l the value described in the Material specification column.
Value
Douglas Fir #2 - Glue Lam Timber
Douglas Fir # 1- Glue Lam Timber
Douglas Fir #2 - Glue Lam Timber
2500 PSI and Higher
Wood Shearwalls Panel Sheathing
hether it will be an internal or external deliverable, and any additional notes. Please register in the notes section what
erables of the project.
Description
eck the box if the sheet will be included in the set, if not provide a brief description explaining why is it not part of
escription
yend to the right to know how to use the checkbox and when to provide notes. Take notes like the quality of the
ut has not been provided. At the end of the table please write any additional questions for the client, this information
Notes
N/A
teria for the project. For this section fill in the general information about the project as this information will be on the
u to select the correct client. For the date double click the cell to select the date. Be sure to enter all information
CE and ATC hazards tools. To correctly use the tool enter the project address and make sure it matches the zip code
peedbeaccording
ust to the
downloaded andcorresponding risk category
placed in the designated of the
folder onstructure,
Dropbox.orAfter
in the
thecase of the
reports are2022 ASCE select
downloaded the wind
you must check
mendment check”, you must click on it after checking any of the local amendments. If there is a change in the design
FALSE
FALSE
n pertaining to this section has been defined in the proposal made to the client, so the information below will present
bed in section 3,3. In the percentages column remember that 40% is destined for the schematic design, 40% for the
Notes
e names of the members of the project, then with the list to the right select the role. Remember that the project has
list.
Fill table 6,2A below and at the bottom of the table a suggestion will appear if there needs to be more than 1 revision
3
1
project
of the tasks. These work break down will be transferred to Zoho projects, not only the tasks but the estimated hours
be added to the Zoho projects, this list below is not fixed.
Table 1,1
Attendees Type of kickoff Date
2 Initiation tasks
To fill this section please create the appropriate folders and documents where the information will be saved. Remember to create the folders
instructions from the manuals, and do it before the kicoff meeting as well. It is important to have all the channels to register the information t
column by checking the boxes. If one of the boxes has not been check before the kickoff it must be explained in the notes why it hasn't been
Table 2,1
Space (Y/N) Notes Manual Link
2,1 Clockify SY FALSE https://writer.zoho.com/writer/open/mu0cxd6217e9
3 What
This section serves to clarify the scope of the project and how we are going to realize the project. This section should answer the following q
3,1 Project (inclusions)
3,1,1, · What is the type of project?
Others
3,1,2, · What is being built? (what does the client want to do? In this section describe the whole project regardless of whether
3,1,4, · What types of structures are we going to design? (for example, concrete structures, retaining walls, wood framing, c
ICF walls) In the table below fill the names of the structures and provide comments or descriptions fo
Table 3,1,1
Number Structure Comments
1
2
3
4
5
6
Others
5 · What is the lateral force-resisting system of the structure? (select the force resisting system accroding to table 12,2-1
Response specify if there is a combination of froce resisting systems sections12,2,2 12,2,3 12,2,3,1
6 · What special conditions are in the project? (big overhangs, steel elements, tall retaining walls, parapets, etc)
Response
7 · What non-structural elements require a detail/design? (for example, counter top and stools inside a pool, kiosk, decora
Response
Additional
observations
1 Based on the second question on section 3,1, What is not included in our scope?
Response
3 · What non-structural elements WILL NOT require a detail/design?
Response
Additional
obersvations
3,3 Project materials
What materials are going to be used? please specify the types of structures and the materials that will be part of those structures. The types of
section 6,1. Select the material appropiate for the structure and the fill the value solumn, the material specification will appear once the mate
Additional Notes:
4 Where
4,1 Project location
The where section describes the geographical location of the project which will influencethe design criteria for the project. For this section f
project as this information will be on the title block of the project and related folders and documents. In the client section use the dropdown m
4,1,1 Project name
4,1,2 Project
number
4,1,3 Client
4,1,4 Address THIS INFORMATION WILL BE ON THE TITLE
4,1,5 CIty
4,1,6 State
4,1,7 County
(optional)
4,1,8 ZIP code
4,1,9 EOR seal
Structure type
Design criteria Value Reference Notes
Wind speed (mph)
Wind GCPI factor
Ground snow load
(lb/sqft)
Seismic Design
Category
Soil bearing
capacity (lb/sqft)
5 When
The when section describes the delivery dates for the project. every project has a changing nature and delivery dates can vary, but as this is a
schedule
Awardedfor the project. This section includes
date 7/06/23 the awarded dates the budget hours, and the number of hours the assigned personnel can work
Notes
Budget hours 260
Daily work hours 6
Days the project 5
will be worked per
week
Number of people 1
working on the
project
Phase (Y/N) checkbox % of duration for Hours per phase Duration (weeks)
each phase
SD-Schematic 0 40.00% 104 3.47
design
DD-Design 0 40.00% 104 3.47
development
PD-Permit 0 10.00% 26 0.87
documents
Plan check co/ 0 10.00% 26 0.87
additional
comments
6 Who
This section describes the roles of the people involved in the project. To fill the table enter manually the names of the members of the projec
role. Remember that the project has only ONE responsible. the last three spaces are reserved for "others" whose role does not appear on the l
Name Role
Phase Peer review 1 Peer review 1 date Peer review 2 Peer review 2 date
Schematic set
Design
development
Permit documents
7 How
The How section will clarify the process that the team will follow to complete the project.
Schematic design
Design
Development
Permit Set
Calculations
Milestone Task Description
Schematic design
Design
Development
Permit Set
TEMPLATE
ckoff meeting (client kickoff, SY kickoff, for example) the same
ckoff meetings. The template will be filled in the zoho workdrive
he kickoff meting attendees with information on the date and type
n 3 to 7 the project is described using the questions WHAT,
ortance of each one.
ent in the list of the platform where the meeting is taking place and ORDEN DEL FORMATO
the type of kickoff (with the client, with SY, etc), and finally the
track of the people that have crucial information about the project.
KICKOFF ATENDEED
INITIATION TASKS
WHAT
WHERE
WHEN
WHO
HOW
AGREGAR "CONCRETE"
CAMBIAR LAS INSTRUCCIONES PARA QUE ELLOS INGRESEN LA ESTRUC
REVISAR LA NUMERACION
REVISAR EL FORMATO DE JUSTIFICADO DE TEXTOS Y NUMERACION
ORGANIZAR DE OTRA MANERA LA CASILLA DE LA RESPUESTA PARA QU
m accroding to table 12,2-1 from the ASCE, note the R value and
ctions12,2,2 12,2,3 12,2,3,1 12,2,3,3)
lls, parapets, etc)
ACTUALIZAR NUMERACION
e right to know how to use the checkbox and when to provide notes.
nformation is needed but has not been provided. At the end of the
u will find as well a section for additional notes, this reffers to any
tes
e project. For this section fill in the general information about the
section use the dropdown menu to select the correct client. For the
WILL BE ON THE TITLE BLOCK
TC hazards tools. To correctly use the tool enter the project address
values
nloadedand
andselect theinwind
placed speed according
the designated folder to
onthe corresponding
Dropbox. After the
e is a checkbox under the “Amendment check”, you must click on
Amendment check
FALSE
FALSE
FALSE
FALSE
FALSE
Number of days to start the Submittal date CAMBIAR ESTA SECCION PARA QUE SOLO SE COLOQUE LA INFORMACIO
next phase (DD/MM/YY)
- 1/07/23 HACER EL DOCUMENTO DE LA PROPUESTA PARA SABER COMO ALIMEN
1 26/07/23
1 2/08/23
1 9/08/23
the members of the project, then with the list to the right select the
ole does not appear on the list.
s will be used (specify the client) para los Others poner una seccion de specify
ks. These work break down will be transferred to Zoho projects, not EXPLICAR QUE EN EL ZOHO PROJECTS VAN A APARECER MAS TAREAS A
Estimated hours
Estimated hours
COLOR LEGEND
N DEL FORMATO
OFF ATENDEED
ATION TASKS
GAR "CONCRETE"
BIAR LAS INSTRUCCIONES PARA QUE ELLOS INGRESEN LA ESTRUCTURA Y ABAJO EN MATERIALES QUE SE LLENE EL NOMBRE AU
SAR LA NUMERACION
SAR EL FORMATO DE JUSTIFICADO DE TEXTOS Y NUMERACION
NIZAR DE OTRA MANERA LA CASILLA DE LA RESPUESTA PARA QUE SEA MAS CLARO
SAR NUMERACION EN LAS DESCRIPCIONES
ALIZAR NUMERACION
r concrete details en una numeracion aparte
r un campo de others
FORMACION DE ESTA SECCION DEBE COINCIDIR CON LA PROPUESTA DE SCOPE QUE SE PASA AL CLIENTE
BIAR ESTA SECCION PARA QUE SOLO SE COLOQUE LA INFORMACION QUE VIENE DE LA PROPUESTA
UMERACION
PUESTA PARA QUE SEA MAS CLARO
ON LA PROPUESTA DE SCOPE QUE SE PASA AL CLIENTE