FCSM Tutorial 3

Case

1. Strongest: ‘No switching during manual advance’ ‘Application specific contracts’ ‘Improved
quality’ ‘Improved reliability’ ‘Contamination’
Weakest: ‘Quiet during manual advance’ ‘Consistent contact force’ ‘Easy Assembly’

2. AUTOMATE BUILD FROM ONE DIRECTION, BUILD MOTOR INTO TIMER, REDESIGN USING DFA

3. Turning Torgue

4. ?

Problem 4:8

A. 5x5x8=200 5x2x1=10 5x3x4=60, so peak demands exceeds staff capacity


B. 1: Have more staff available on peak moments
2: Have an easier registration system, so people won’t make mistakes.
3: Have more staff available, so people who fall behind the urgent cases can still be treaded.