Atr Skardu Ops

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

ATR – SKARDU OPERATION

Last Updated: 13th April 2017

ROUTE OVERVIEW

For routing up till Bunji and general northern areas procedures, see Gilgit Operations:
http://www.theairlinepilots.com/forumarchive/airfield-area-procedures/gilgit/gilgit-ops.pdf

AIRPORT INFO
 Tower 119.7

 Runway 14 / 32, Length 12000 feet, Width 98 feet. Both sides available for takeoff and landing.

 Night Time Limitation: Airborne Time + Time to CP + Time to Land Back at Sunset Time e.g. If
after airborne time to CP is 20 minutes and time from CP to land back is 25 minutes (due
headwinds) then airborne time should be 45 minutes (20+25) before sunset time. Note: Sunset
time in mountains is earlier than in plain areas.
ROUTE DETAILS
Disclaimer: "ATR Skardu Operation" are personal notes of the undersigned for training only. These notes do not sanction any pilot to violate
his/her Company's Standard Operating Procedures, Aircraft Manuals or Manufacturer's Recommendations.

You might also like