Download as pdf or txt
Download as pdf or txt
You are on page 1of 11

CHECKLIST

DIVER : RAUL ENRIQUE COS RAZO


CURP: CORR731207HDFSZL08
ADDRESS: LAGNA VIESCA 40,
LAGUNA I y II, PUNTA TIBURON,
ALVARADO VERACRUZ,5264
ALLERGIES: WALNUTS, HAM,
CHOCOLATE.
EMERGENCIES TELEPHONES:
MARIAINE CABRERA GARCIA
2292136029 WIFE
RUBICELIA GARCIA TENORIO
222528133 MOTHER IN LAW
RAUL ENRIQUE COS VERGARA
5553430162 FATHER
BLOOD TYPE : O NEGATIVE
LIFE INSURANCE DAN: 1825660

NUMBER OF IMSS: 90937326792


CHECKLIST
CHECKLIST

Inicio:________.
Final: ________.
MOD_________.

Inicio:________.
Final: ________.
MOD_________.

Inicio:________.
Final: ________.
MOD_________.

Inicio:________.
Final: ________.
MOD_________.
CHECKLIST

Inicio:________.
Final: ________.
MOD_________.

Inicio:________.
Final: ________.
MOD_________.

Offboard________.

Minivolts __________.
Minivolts __________.

Minivolts __________.
Minivolts __________.

Date:________.
Hrs:_________.
Date:________.
Hrs:_________.
Date:________.
Hrs:_________.
S PREDIVE
S SITE ANALYSIS.- SEA, CAVE, DEPTH, TIME,
RUN TIME, EXT RANGE, GASES, BATTERIES
RUN TIME. PLAN IN TABLE.- DEPTH, STOP
TIME, PO2.
T PLAN IN TABLE.- DEPTH, STOP TIME, PO2.
S EMERGENCIES.- LOST DIVER,
COMMUNICATION CHANNEL, HYPERBARIC
CHAMBER, AMBULANCE, EMERGENCIES,
DOCTOR READY, FIRST AID, FIRST AID KIT,
OXYGEN, COMMUNICATION HOME,
ALLERGIES AND BLOOD TYPE.
S EQUIPMENT ANALYSIS.- WETSUIT, DRY,
UDER, GLOVES, BOOTS, VEST,
REGULATORS, GAS ANALYSIS. COMPUTER
SETUP GASES.
S BATTERIES.- LAMPS, PRIMARY,
SECONDARY, COMPUTER BATTERIES, DPV
BATTERIES, CCR BATTERIES, CAMERA
BATTERIES.
S POUCH, EMERGENCY REEL, MASK, KNIFE,
MOUTHPIECE, BUOY, MIRROR, YELLOW
GAS, BONGIE,
T CHECK EQUIPMENT BUDDY.- LAMPS,
PRIMARY, SECONDARY, COMPUTER
BATTERIES, DPV BATTERIES, CCR
BATTERIES, CAMERA BATTERIES,
PRESSURE GAUGES, REGULATORS.
GASES, CYLINDERS, EMERGENCY REEL,
MASK, KNIFE, MOUTHPIECE, BUOY,
MIRROR, YELLOW, BONGIE, TABLES,
COMPUTER BACK. WRITTEN PLANS
T SELF CHECK AND BUDY CHECK.- NO
BUBBLES, LEVEL, COMMUNICATION,
MELTIES, GAS CHECK, RUN TIME, PO2 MAX.
T COMMUNICATION.- PRECHECK, PREDIVE,
CLEANLINESS, GRADES, DIRECTION, TIME
AND DEPTH, ROUTE, SIGNS.
A AIR.- GAS, TYPE, MOD, EIR, PO2, TAGS,
TANK PLACE, VOLUME, RUN TIME.
R COMPASS AND ROUTE.- INDICATE ROUTE,
TIME, COMPASS, DEGREES. DEPTH.
E EMERGENCIES.- LOST DIVER, PLAN TO
EMERGE, DUCK UNDERWATER, BUOY,
BOAT CALL, SURFACE DUCK, SATELLITE
PHONE.

IN WATER.- REGULATORS AND TOTAL


CLEANING, TEST BATTERIES, TEST CCR,
TEST DPV.
AT 6 METERS.- REGULATORS, LONG HOSE,
SHORT HOSES, PRESSURIZED TANKS, CCR
HUD OR ODA READY, ADV OPEN CHECK,
DIVE SURFACE TEST, NO BUBBLES.
SIDEMOUNT
DIVESOFTLIBERTY ASSEMBLY CHECKLIST Re s u l t

1 DIL cylinder analyzed – fitted on left side Gas:

2 O2 cylinder analyzed – fitted on right Gas:


side
3 Water trap installed on the bottom of
the scrubber canister
4 Scrubber filled – residual time is
sufficient for planned dive (note dived
hours)
5 Scrubber (filled with Sofnolime 797) is
installed inside the canister
6 Head O-ring clean, well lubed and not
damaged
7 Safety plugs (jumpers) connected to
batteries
8 Head fits easily to canister – no visible
gap between head and the canister
9 Oxygen sensors calibrated

1 Short head connection hoses between


0 head and counter lungs connected
1 Oxygen supply hose connected to head
1
1 Locks on the head and scrubber are
2 secured with spikes on the frame
1 Bolt snap on the head strap is in correct
3 position
1 Head strap and scrubber can strap
4 tightened
1 Scrubber handle fitted
5
1 HUD and Handset cables routed through
6 the center of the rig
1 Counterlungs connected to short
7 connection hoses
1 Counterlungs attached to the frame
8 with all Velcro straps
1 OPV connected on the right side and
9 locked
2 Directional flow test OK
0
2 Corrugated hoses well connected to
1 counterlungs
2 ADV connected to LP DIL
2
2 DIL MAV connected to LP DIL (black
3 hose to left black MAV)
2 O2 MAV connected to oxygen (green
4 hose to right green MAV)

Checked by: Date: Signature:


SIDEMOUNT
Re s u l t
DIVESOFTLIBERTY ASSEMBLY CHECKLIST

LP and HP system check for leaks

Pre-dive check done with no failure

Oxygen tank OPENED Press.:

Diluent tank OPENED Press.:

ADV, O2 and diluent buttons are feeding


and do not leak
HUD connected to DSV

Bailout tank analyzed and assembled Gas:

Bailout tank gas and pressure Press.:

Diving light canister and dry suit supply


fitted (if needed)

Cell
Cell
Cell volta
volt
voltage ge
age
AIR calcu
on
lated
O2
to O2
(by
(mV
cali
on
brat
air x
ion)
4.76)

Sen mV mV
sor
1

Sen mV mV
sor
2

Sen mV mV
sor
3

Sen mV mV
sor
4
ALGORITMO GAS 1 MOD
CNS GAS 2 MOD
OTU´S GAS 3 MOD
DECOZONE GAS 4 MOD

TIME RUN TIME


No. DEPTH TIME RUN TIME GAS PO2 EAD MOD
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
ALGORITMO GAS 1 MOD
CNS GAS 2 MOD
OTU´S GAS 3 MOD
DECOZONE GAS 4 MOD

TIME RUN TIME


No. DEPTH TIME RUN TIME GAS PO2 EAD MOD
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

You might also like