DAILY PRE-SHIFT MEETING

Client: AKAKUS Location: NC115 – M20


…………………… :Date
..……………………… :Time: …………………….….. Shift
:Topics of meeting

- It is not allowed for anyone to operate the heavy lifting equipment (Forklift/Crane) except the
certified operator, in case work is requested so, you have to get signed permission from TP/HSE for the
assigned work mission only.

- Rig floor should be organized and tidy all time, remove all un-needed equipment from work place,
keep only tools and equipment you need for the current job.

- Safety equipment must be cleaned and stored back after use, found one face shield is broken at the
mud system area, and the other one is gone!

S.N Name Position Signature


1 DRILLER
2 ASSIST DRILLER
3 DERRICK MAN
4 FLOOR MAN
5 FLOOR MAN
6 FLOOR MAN
7 FLOOR MAN
8 ROUSTABOUT
9 ROUSTABOUT
10 ROUSTABOUT
11 ROUSTABOUT
12 .ASSIST MECH
13 .ASSIST ELECT
14
15

Rig TP HSE Officer


.……………………………………
…………………………………