Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

Struggling with your thesis? You're not alone.

Writing a thesis can be one of the most challenging


tasks in your academic journey. From conducting extensive research to organizing your findings into
a coherent argument, the process can be overwhelming.

Many students find themselves juggling various responsibilities alongside their thesis work, making it
even more difficult to dedicate the time and energy needed to produce a high-quality paper. Whether
you're balancing coursework, part-time jobs, or family commitments, finding the time to focus solely
on your thesis can feel like an impossible task.

That's where ⇒ HelpWriting.net ⇔ comes in. Our team of experienced academic writers
understands the complexities of thesis writing and is here to offer expert assistance every step of the
way. Whether you need help refining your research question, structuring your paper, or polishing
your final draft, our skilled professionals are equipped to provide the support you need to succeed.

By entrusting your thesis to ⇒ HelpWriting.net ⇔, you can alleviate the stress and pressure that
often accompanies this challenging task. Our writers will work closely with you to understand your
unique requirements and deliver a custom-written thesis that meets your exact specifications.

Don't let the difficulty of thesis writing hold you back. Order from ⇒ HelpWriting.net ⇔ today and
take the first step towards academic success.
Changes and discrepancies in no way imply that the original design contained errors or was flawed. It
is rated at 500 kW and at 0.8 power factor. There is an emergency, standby, and optional standby
branch. One is on the west side of the building adjacent to the lobby, and the other is the east side at
the back of the auditorium. Part of the main roof is also composed of 1 ?” galvanized metal deck,
but it is supported by beams and not joists. Every strobe device is rated at 75 candela luminous
intensity. This analysis is pursued as a constructability review of the demolition and to analyze
whether the existing demolition plan was the most efficient way to pursue the demolition. Each
analysis will provide insight into improving efficiency both directly and indirectly in the construction
industry through project delivery method, constructability, value engineering, and schedule
acceleration. The different CCT of the lamps provides flexibility for different functions. The original
construction is anticipated to take a total of four weeks; the new construction method will attempt to
reduce this duration to one week. A private event space occupies the entire 6th floor. It contains
material produced for a year-long Senior Thesis class. The third ATS is also for a distribution panel,
which serves the three elevator motors on the roof. There are speaker strobes in every hallway and
large spaces such as the lower lobby. The materials used will be steel for the frame (including
stringers) with precast concrete treads. The new stair design will be complex in that it will be done in
a Caesar style. There are two stairwells that exit to the outdoors. There are also extruded aluminum
louvers at parts with 1” insulated blank off panel where required. Modifications and changes related
to the original building designs and construction methodologies for this senior thesis project are
solely the interpretation of Daniel Zartman. The facade of the building does not incorporate an
excessive amount of exterior glazing which may cut down on energy loss and decrease heating and
cooling leads. Modifications and changes related to the original building designs and construction
methodologies for this senior thesis project are solely the interpretation of Josh Behun. It contains
materials produced for a year-long Senior Thesis class. The typical bay size is 21’ x 37’8”, and most
of these beams are cambered 1 ?”. This mechanical breadth will include mechanical calculations to
determine the energy usage of the chilled beam system in order for it to perform efficiently. Also
some rooms can be heated while others can be cooled. This will be done by designing a
prefabricated structural insulated panel system as an alternative facade assembly to accelerate the
schedule. This website provides a portal through which my peers, family, friends, professionals, and
potential employers may view my work over the past year. Pole mounted metal halide lighting
fixtures are used for all paved areas. There are four automatic transfer switches in the Emergency
Electrical Room. Modifications and changes related to the original building designs and construction
methodologies for this senior thesis project are solely the interpretation of Adam Love. This entire
building is equipped with upright style sprinkler heads.
The lateral system consists of hollow structural steel braced frames and Chevron frames. One is on
the west side of the building adjacent to the lobby, and the other is the east side at the back of the
auditorium. There is corrugated aluminum panel anodized with 2” rigid insulation and 3 ? “ batt
insulation. Differing assumptions, code references, requirements. Typical exterior wall construction
around the building (figure 3) consists of cast stone masonry units up to the third level with an
ornamental C15x33.9 at the third level. The Capstone project gave me the opportunity to refine both
my technical and analytical skills in a structured setting. Changes and discrepancies in no way imply
that the original design contained errors or was flawed. Changes and discrepancies in no way imply
that the original design contained errors or was flawed. Changes and discrepancies in no way imply
that the original design contained errors or was flawed. Many spaces have two different fixtures with
two different CCT’s. In addition, using a metal structure for the stair will have significant schedule
and construction cost benefits. There are also extruded aluminum louvers at parts with 1” insulated
blank off panel where required. The largest footings are underneath the lobby and exhibition space
because this is where the building rises the highest. All emergency lighting is connected to the
emergency power panels. L.E.D. type exit signs connected to the emergency power system aid in
egress. AE 570 discussed the analysis of production systems and the application of production
management tools such as the Toyota Lean Principles. The different CCT of the lamps provides
flexibility for different functions. It is rated at 500 kW and at 0.8 power factor. There is an
emergency, standby, and optional standby branch. The building will feature a large atrium and
exposed structural steel trusses, which support a continuous sloped skylight. There is a fire pump
room on the first floor that houses the two pumps and other components of the fire protection
system. Changes and discrepancies in no way imply that the original design contained errors or was
flawed. The interior is comprised of mostly stainless steel. The facade of the building does not
incorporate an excessive amount of exterior glazing which may cut down on energy loss and
decrease heating and cooling leads. The energy usage of both systems will be used to analyze the
cost of performance for the owner. Sprinkler locations are done according to NFPA requirements.
Changes and discrepancies in no way imply that the original design contained errors or was flawed.
The objective of this analysis is to develop a decision tree that can be used by owners and developers
who desire to implement progressive projects delivery methods on publicly funded project in the state
of Pennsylvania. A change order has since removed the column extending from the second landing to
the roof. The building has a lot of computer and lab equipment, which would be very expensive to
replace. The generator serves emergency lighting, exit signs, fire alarm panel, public address system,
automatic temperature control system, security system, hot water system pumps, and kitchen
refrigeration equipment. Changes and discrepancies in no way imply that the original design
contained errors or was flawed.
In addition, using a metal structure for the stair will have significant schedule and construction cost
benefits. AE 572 discussed the methods employed by owners and developers throughout the process
of project development. Changes and discrepencies in no way imply that the original design
contained errors or was flawed. There are also extruded aluminum louvers at parts with 1” insulated
blank off panel where required. Differing assumptions, code references, requirements, and
methodologies have been incorporated into this thesis project; therefore, investigation results may
vary from the original design. Wood-Ridge, NJ 07075 Phone: (201) 939-9150 Fax: (201) 939-4745.
The four pipe system does not have to be changed to heating or cooling for when the seasons
change. It contains material produced for a year-long Senior Thesis class. Differing assumptions,
code references, requirements, and methodologies have been incorporated into this thesis project;
therefore, investigation results may vary from the original design. The auditorium roof is 1 ?”
galvanized metal deck supported by long span 36LH10 joists. There is a fire pump room on the first
floor that houses the two pumps and other components of the fire protection system. Hard courts for
basketball and tennis will also be provided. One alternative that is being studied is placing temporary
or permanent beams to brace the columns in the mezzanine’s perimeter. Changes and discrepancies in
no way imply that the original design contained errors or was flawed. For emergency there is a
packaged diesel generator set with weatherproof and sound attenuating enclosure and sub-base day
tank. Senior thesis also gave me the opportunity to further research areas of interest while forcing me
to reinforce areas where I was lacking. The Equitable Resources Building is 6 stories above grade
totaling 180,000 square feet which includes 150,000 square feet of office space on floors 2 to 5 and
30,000 square feet of retail space on the ground level. Changes and discrepancies in no way imply
that the original design contained errors or was. The objective of this analysis is to develop a
decision tree that can be used by owners and developers who desire to implement progressive
projects delivery methods on publicly funded project in the state of Pennsylvania. This was a great
learning experience for him and a great supplement to his education. Further complicating matters,
the atrium is also designed to be passively heated and cooled. Modifications and changes related to
the original building designs and construction methodologies for this senior thesis project are solely
the interpretation of Stephan Northrop. There is also a central staircase inside the circular core walls.
Each analysis will provide insight into improving efficiency both directly and indirectly in the
construction industry through project delivery method, constructability, value engineering, and
schedule acceleration. Part of the main roof is also composed of 1 ?” galvanized metal deck, but it is
supported by beams and not joists. Differing assumptions, code references, requirements, and
methodologies have been incorporated into this thesis project; therefore, investigation results may
vary from the original design. It is illuminated by fluorescent recessed fixtures. This mechanical
breadth will include mechanical calculations to determine the energy usage of the chilled beam
system in order for it to perform efficiently. Differing assumptions, code references, requirements,
and methodologies have been incorporated into this thesis project; therefore, investigation results
may vary from the original design. As previously mentioned, the current atrium stair is designed to
be constructed of cast-in-place concrete.
The new duct bank runs to a manhole near the generator. All emergency lighting is connected to the
emergency power panels. L.E.D. type exit signs connected to the emergency power system aid in
egress. This website is dedicated to the research and analysis conducted via guidelines provided by
the Department of Architectural Engineering. Modifications and changes related to the original
building designs and. Modifications and changes related to the original building designs and
construction methodologies for this senior thesis project are solely the interpretation of Josh Behun.
The third ATS is also for a distribution panel, which serves the three elevator motors on the roof. The
purpose of this thesis project is strictly educational and is not intended to critique the work
performed by the project team in any way. For an explanation of this capstone design course and its
requirements. The previous design that will no longer be pursued includes precast concrete panels.
The addition of solar panels on the roof will drastically affect both the structural system, introducing
a substantial load on the roof, and the electrical system, implementing a new energy source into the
existing electrical power source. (Click on image at right). This deck is covered with 3 ?” lightweight
concrete topping. Fixtures are switched so that the inner and outer lamps may be energized
independently. Its purpose, in addition to providing central storage of individual assignments, is to
foster communication and collaboration between student, faculty consultant, course instructors, and
industry consultants. The majority of the roof system is 3 ?” normal weight concrete over 2”
composite metal galvanized deck. There is potential savings in downsizing the main distribution or in
the number of supporting panels. This website is dedicated to the research and analysis conducted via
guidelines provided by the Department of Architectural Engineering. In the Fall of 2008, I
participated in a sustainability class entitled AE 597D - Sustainable Building Methods. Fiber optic
cabling was run between hub rooms to provide a building wide network. Changes and discrepancies
in no way imply that the original design contained errors or was flawed. With all of the the water
pumps, heat pumps, and active chilled beams the building’s main distribution will have to be
adjusted and new panels and wiring put in place to power this replacement mechanical equipment.
This website is dedicated to the research and analysis conducted via guidelines provided by the
Department of Architectural Engineering. Wood-Ridge, NJ 07075 Phone: (201) 939-9150 Fax: (201)
939-4745. The lateral system consists of hollow structural steel braced frames and Chevron frames.
The fan powered box then serve ceiling mounted diffusers. During regular school hours, the center
supports the academic curriculum. The auditorium walls are composed of 4” face brick in a stack
bond with 2” semi rigid insulation and 8” CMU backup wall. Modifications and changes related to
the original building designs and. The facade of the building does not incorporate an excessive
amount of exterior glazing which may cut down on energy loss and decrease heating and cooling
leads. AE 598D provided a basic understanding of the legal doctrines, contractual relations, and
construction contracts.
Fixtures are switched so that the inner and outer lamps may be energized independently. The
auditorium walls are composed of 4” face brick in a stack bond with 2” semi rigid insulation and 8”
CMU backup wall. The typical bay size is 21’ x 37’8”, and most of these beams are cambered 1 ?”.
The energy usage of both systems will be used to analyze the cost of performance for the owner. The
building will feature a large atrium and exposed structural steel trusses, which support a continuous
sloped skylight. This analysis also includes a structural breadth that focuses on the type of connection
that will be used on the prefabricated curtain wall system. These units incorporate demand-based
ventilation controls. This website is dedicated to the research and analysis conducted via guidelines
provided by the Department of Architectural Engineering. The Capstone project gave me the
opportunity to refine both my technical and analytical skills in a structured setting. This analysis is
pursued as a constructability review of the demolition and to analyze whether the existing
demolition plan was the most efficient way to pursue the demolition. Changes and discrepancies in
no way imply that the original design contained errors or was flawed. The data wiring consists of
augmented category 6 data conductors installed from each data outlet in the building to a patch
panel located in designated rooms. The augmented category 6 structured cabling system enables 10-
gigabit-per-second Ethernet transmission over a full 100 meters. Differing code references,
assumptions, requirements. Spray on fire proofing is also used where required by code for the
structural steel members. Sprinkler locations are done according to NFPA requirements. The
elevators themselves are located in the circular core walls near the middle of the building. Differing
assumptions, code references, requirements, and methodologies have been incorporated into this
thesis project; therefore, investigation results may vary from the original design. In addition, the
course information covered will also provide a greater understanding of the benefits associated with
using more progressive project delivery methods such as Design-Build. This construction method is
significantly more expensive than other alternatives and is highly labor intensive. Changes and
discrepancies in no way imply that the original design contained errors or was flawed. Fiber optic
cabling was run between hub rooms to provide a building wide network. Differing assumptions,
code reference, requirements, and methodologies have been incorporated into this thesis project;
therefore, investigation results may vary from the original design. The analysis will compare the
prefabricated system to the existing curtain wall system to determine whether prefabrication can
have a progressive effect on the project. Only the roof and some nonbearing exterior walls require 1
hour fire rating. These courses will aid in understanding the fundamental reasons why Pennsylvania’s
Department of General Services restricts the use of progressive delivery methods on publicly funded
projects. Differing assumptions, code references, requirements, and methodologies have been
incorporated into this thesis project; therefore, investigation results may vary from the original
design. AE 572 discussed the methods employed by owners and developers throughout the process
of project development. The design of this building also includes a sublevel of parking, which
accommodates 80 vehicles. There are four construction topics that will be focused on in the spring
and two breadth topics in other areas in Architectural Engineering. The fire command center is
located on the second floor.
Changes and discrepencies in no way imply that the original design contained errors or was flawed.
Modifications and changes related to the original building designs and construction methodologies
for this senior thesis project are solely the interpretation of Paul Stewart. There is corrugated
aluminum panel anodized with 2” rigid insulation and 3 ? “ batt insulation. Changes and
discrepancies in no way imply that the original design contained errors or was flawed. He has been a
member of the Penn State Racquetball Team for 2 years and has enjoyed playing ice hockey since
2nd grade. Similar calculation will be conducted on the pre-existing VAV system. Breadth 3 will
design and size both systems to be placed in the above ceiling plenum. AE 598D provided a basic
understanding of the legal doctrines, contractual relations, and construction contracts. Modifications
and changes related to the original building designs and construction methodologies for this senior
thesis project are solely the interpretation of Stephan Northrop. It contains material produced for a
year-long Senior Thesis class. There are low voltage control panels on every floor’s electrical room.
The current design specifies the use of a raised access floor system in the mixed use portion of the
building. Differing assumptions, code references, requirements, and methodologies have been
incorporated into this thesis project; therefore, investigation results may vary from the original
design. Many fixtures are equipped with dimming ballast for flexibility. These courses will aid in
understanding the fundamental reasons why Pennsylvania’s Department of General Services restricts
the use of progressive delivery methods on publicly funded projects. In the Fall of 2008, I
participated in a sustainability class entitled AE 597D - Sustainable Building Methods. Since MADC
was recently suspended, I believe that research on the economy’s effect on the industry would be
quite beneficial to the owner and industry professionals for current and future times. The elevator
machine room is on the roof and contains these motors. Changes and discrepancies in no way imply
that the original design contained errors or was flawed. Therefore, the breadth would be to calculate
the appropriate size of the steel beams that would brace the columns. The building will feature a
large atrium and exposed structural steel trusses, which support a continuous sloped skylight. This
entire building is equipped with upright style sprinkler heads. The addition of solar panels on the roof
will drastically affect both the structural system, introducing a substantial load on the roof, and the
electrical system, implementing a new energy source into the existing electrical power source. (Click
on image at right). Differing assumptions, code references, requirements, and methodologies have
been incorporated into this thesis project; therefore, investigation results may vary from the original
design. The auditorium walls are composed of 4” face brick in a stack bond with 2” semi rigid
insulation and 8” CMU backup wall. Also some rooms can be heated while others can be cooled.
Changes and discrepancies in no way imply that the original design contained errors or was flawed.
The general contractor is Terminal Construction Company, who has performed construction services
for the university in the past. Also on the ground level is the main lobby, which opens on the north
face of the building and provides access to all four of the building's stairwells and elevators.

You might also like