BUILDING PROCESS
Construction & Building systems
Spring Semester 2017

Dr. Mohamed Meselhy


Fayoum University , Faculty Of Engineering , Architecture Department.
BUILDING PROCESS

1- Choice of Building site:

2- Soil Investigation

3- Site work:
BUILDING PROCESS
Site work:
- Establishing a point of known level on the site, this
point will be a datum for all construction work.
- We will call it Ordnance Bench Mark (OBM), this
point should be fixed and permanent point.
- Referring to OBM an instrument called Total
Station can be used to find levels and building
borders by finding coordinates.
BUILDING PROCESS

1- Excavation & Leveling (soil investigation- Gasat)


BUILDING PROCESS

Excavation
BUILDING PROCESS

Excavation (must be inclined to prevent the sand from sliding


down the construction area )
BUILDING PROCESS

Excavation (special considerations for areas with


underground water)
BUILDING PROCESS

Ground Water level (must be sucked up mechanically


to lower the GWL under the foundation level)
BUILDING PROCESS
2-Foundations
Foundation types:
The foundation types can be defined according to:
1- Type of the building.
2- Nature of loading and forces.
3- Site condition (soil investigation).
And can be classified to:
• Shallow foundation.
• Deep foundation.
BUILDING PROCESS
Shallow foundation:
•Would be constructed near the
ground level (mostly foundation level
of -1 m to -1.5m ) where the load Isolated

bearing capacity of near soil layer is


acceptable.
1- Isolated footing.
2- Continuous - strip footing.
3- Raft footing.

‫لبشة‬
Raft Continuous - strip
BUILDING PROCESS

Isolated- Pad foundations Strip foundations


BUILDING PROCESS
Deep foundation:
Used to reach the solid level for foundation.

a- Piles (timber- steel – R.C – precast –end bearing - friction ).


b- Wells or Short-bored piles (or so called Alexandrian
wells).
BUILDING PROCESS
a- Pile foundations
•Pile foundations are the part of a structure used to carry
and transfer the load of the structure to the bearing
ground located at some depth below ground surface.
•The main components of the foundation are the pile cap
and the piles.
•Piles are long members which transfer the load to
deeper soil or rock of high bearing capacity avoiding
shallow soil of low bearing capacity.
•The main types of materials used for piles are Wood,
steel and concrete.
BUILDING PROCESS
Pile foundation:
BUILDING PROCESS

Friction
BUILDING PROCESS
BUILDING PROCESS

Settlement reducing piles


FORCES &FOUNDATIONS
b-Wells or Short-bored piles (or so called Alexandrian
wells):

•They consist of a series of short concret piles cast in holes bored


in the ground and spanned (typically 2.5m) with light ground
beams (usually RC) FOR LOAD bearing walls.
•Advantages:

•Speed of construction and Reduced quantities of waste soil.

•The construction of this foundation provides an Economical


Solution for building on shrinkable clay
BUILDING PROCESS
Design steps

1- Excavation & Leveling (soil investigation- Gasat)


BUILDING PROCESS

2- Prepare Concrete –a- In site


(sand, gravel, cements and water)
BUILDING PROCESS

Concrete (sand, gravel, cements and water)


In site
BUILDING PROCESS

Concrete (sand, gravel, cements and water)


In site
BUILDING PROCESS

Prepare Concrete
b- by Pumps
BUILDING PROCESS

Prepare Concrete
b- by Pumps
BUILDING PROCESS

3- Foundation (Isolated footings)


BUILDING PROCESS

Footing (Raft foundation)


BUILDING PROCESS

Footing (Raft foundation)


BUILDING PROCESS

Footing (Curved Raft foundation)


BUILDING PROCESS

Footing (Piles)
BUILDING PROCESS

Foundation (semels)
BUILDING PROCESS

4- Isolation from under ground water


BUILDING PROCESS

Isolation (footings)
BUILDING PROCESS

Isolation (column)
BUILDING PROCESS

5- Column - skeleton
BUILDING PROCESS

Skeleton.
BUILDING PROCESS

Skeleton.
BUILDING PROCESS

Skeleton (slab).
BUILDING PROCESS

Skeleton (shear wall).


BUILDING PROCESS

Roof Finishing (ducts and utilities).


BUILDING PROCESS
Assignment # 1 &2:
Description:
Build a model for a given chalet scale 1:10
Materials:
Wooden box 70x50x30cm … filled with sand (10cm height)
Sand + Cement + Water
Plastic cover (minimum width 90cm and 2 m long) 25cmSand

Container (for mixing concrete components)


Cleaning towels
Gloves
Metal Ruler 30cm

Rigid plate (for soil compaction)


Carton + Cutter (for concrete framings)
Bricks (free to choose the material) 50cm
70cm

Electric wires
Pipes
Digital Camera (to document construction stages)
BUILDING PROCESS
Organization: 25cm
Group work: 5-7 students Sand

Work place: each group will work on a row of


benches
Storing: at the last row of benches in the lecture hall
30cm
Cleanliness: Keep workplace clean and after the lab
get rid of the plastic covers and all wasting materials.
(Cleanliness will be taken in consideration while
70cm
grading) 50cm

Due date:
Phase one: (Foundation and Skeleton) … Next week-
3h lab
Phase two: (Columns, Walls and Roofing) …
Phase three: (Finishing + report) …
Photo documentation:
After finishing all phases each group will submit a
CD with all photos of their model construction
phases. Each phase will be in a separate folder.
BUILDING PROCESS
25c
Draw chalet scale 1:10 m
San
d

4 meter 30c
m

50c 70c
m m

30 cm

6 meter

80 cm
Plan
Foundation
HANK YOU