Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Project TAIFA INDUSTRIAL PARK ,SU Date : 29 Juli 2020

Location : SUB GRADE JALAN Done by : -


Koordinat X= 809567 M Remarks : NO.01
Y= 9278948 M

Maximum Dry Density 500


95 % MDD
Optimum Moisture Content 500

No. Of Blows / Layer


400
Wt.Mould + Sample
Wt.Mould 400
Wt Sample
Volume of Sample
Water Content
300
Dry Density
(Lbs)

300
Load (Lbs)

Penetration Dial Reading Load


Load

(Inch) mm (Inch)
0.000 0.000 0.0000 0 0.00 200
0.2500 0.3180 0.0125 8 89.12 200
0.5000 0.6350 0.0250 12 133.68
1.0000 1.2700 0.0500 24 267.36
1.5000 1.9050 0.0750 29 323.06
2.0000 2.5400 0.1000 34 378.76 100
100
3.0000 3.8100 0.1500 42 467.88
4.0000 5.0800 0.2000 48 534.72
6.0000 7.6200 0.3000
8.0000 10.1600 0.4000
0
10.0000 12.7000 0.500 0.000.501.001.502.002.503.003.504.004.505.00
Penetration (Inch)
CBR Value
0,1 " 0.2"
12.63 11.88
Subang,19 Augustus 2020
Juangan lupa angka kalibrasi Proving Ring
Kalibrasi 11.14
Untuk yg 10000 lbs Kalibrasinya: 49.45
Untuk yg 2000 lbs Kalibrasinya: 11.14

You might also like