Two reasons:
1. Insufficient information
2. Incorrect DESIGN
Design
Primary compliance
• Purpose Group
• Fire Appliance
Accessway
• Compartmentation
• 6th Schedule
calculation
• Active Systems
• Exit Capacity
Calculation
• Storey, horizontal
and Final Exits
• Travel distance
• Ventilation of
protected shaft
• Active systems
• Fire Fighting
Access Lobby
• Surface Finishes
• Single Stair :
details of
compliance
Required portion of
building fronting the Required portion of
Access Way building fronting the
Access Way
ACCESS ROAD
ACCESS OPENING • minimum width 4.5m
• Located fronting • Gradient <= 1: 8.3
Access Way • Minimum overhead
• (suggested) width >= Edge of Access Way
clearance 4.5m
required exit width • Minimum 2m
• Maximum 10m
Fire Fighting Shaft
Fire Fighting Access Lobby
Firemen’s Lift
Fire Fighting Staircase
Risers (fire mains)
Hydrant
Emergency Power
Fire Pumps
Generators
Maximum 91.5m
Hydrant to Hydrant
Breeching
Inlets
Maximum 30m
Hydrant Hydrant to Breeching Inlet
FIRE FIGHTING SHAFTS : LOCATION
Route distance
F WR
L W
R
Risers
All parts of floor within
45m from a landing valve
FIRE FIGHTING SHAFTS : LOCATION check with ROUTE DISTANCE
Is
Is
FIRE
FIRE LIFT YES YES
MAINS FINISH
START within
within
61m
61m
?
?
NO NO
Add install
Fire Fighting FIRE MAINS
Access Lobby in secondary
protected stair
within 45m
Information
• Site plan
• Fire Appliance Access Level
• Floor plans
• Building Sections
• Calculations and tabulations
Building Access Way Kehendak-
Volume kehendak BOMBA
calculation Hydrants
6th Schedule
calculation
Project Title
Fire Fighting
Lift Lobby
Fire Command
Access Road Centre
Breeching Inlet
Fire Pump
SITE PLAN Room
Fire Fighting Access to
Lift Lobby Fire Pump
Room
Fire Command Breeching Inlet
Centre
BI
Final Exits
Access Way
H Hydrants
H
Access Road
K K
HR
WR
Exit Routes and
K
HR
Travel Distances
Active Systems EXITS
• Sprinklers (area) (storey, horizontal,
• Hose reels final)
• Dry/wet risers
• Manual alarm EXITS
• Mechanical (Occupant Load and
ventilation (area) Exit Capacity)
KELUAR signs
• At exit
• Directional
FLOOR PLAN
Compartmentation (volume) Protected lobby
and Smoke lobby
Separation Walls (method of protection)
(material and thickness)
Active Systems
• Sprinklers (area)
K K
• Hose reels
• Dry/wet risers
K • Manual alarm
• Mechanical
HR
K HR ventilation (area)
Fire Command
Centre
Upper ground floor
Fire Appliance
Access Level
FCC