dsineDN DU ROM Extended DN2 Product Manual 1.0

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

1. CONTENTS 2.

MOUNTING OF MECHANISM BLOCK

ROTARY OPERATING
MECHANISM FOR

DN2 MCCB
HANDLE
MECHANISM ASSEMBLY ENSURE “OFF”
BLOCK
1 STATE OFBREAKER
3
ENSURE MECHANISM
IS PROPERLY
Door mounting EXTENSION
SHAFT
ENGAGED WITH THE 4
version KNOB OF BREAKER
UNSCREW THE TWO SCREWS SCREW THE MECHANISM BLOCK
2 WITH THE BREAKER

3. UNIVERSALITY - FOR VARIOUS MOUNTING POSITIONS 4. MOUNTING OF HANDLE ASSEMBLY

PLACE THE HANDLE IN THE


9 PUNCHED DOOR
(REF. MOUNTING DIMS. FOR DETAILS)

5 CUT THE SHAFT TO THE


REQUIRED LENGTH = L
(REF. MOUNTING DIMS. FOR DETAILS)

10 SCREW FROM THE BACK

6
INSERT THE SHAFT IN THE
SQUARE COUPLING SLOT

ENSURE “OFF” POSITION


! OF HANDLE

ENSURE THAT PIN IS VERTICAL FOR


7 ! ANY MCCB MOUNTING POSITION

AFTER INSERTING THE SQUARE SHAFT,


8 TIGHTEN THE SCREW TO HOLD THE SHAFT

5. OPERATION

SWITCHING “ON” SWITCHING “OFF” RESETTING


ROTATE CLOCKWISE ROTATE ANTICLOCKWISE ROTATE ANTICLOCKWISE BEYOND “OFF”
6. MOUNTING DIMENSIONS

VERTICAL & HORIZONTAL REFERENCES


WITH RESPECT TO MCCB MOUNTING PANEL CUT DETAILS
275mm AS VIEWED FROM THE FRONT

Shaft length as supplied


L
Ø51
L2

L3
45°
L1 Ø76
N
L= Length of Shaft required for
Panel Depth L1

Ø4
2 HOLES
L

Cut the shaft to the


required length REFERENCES AS PER MCCB MOUNTING

Min. Panel depth L2 L3


L1(mm)

202 L=L1-152 (+1 mm) 27 84 FOR MOUNTING HANDLE ASSEMBLY

7. PAD LOCKING - WITHOUT DOOR INTERLOCK 8. PAD LOCKING - WITH DOOR INTERLOCK UNIQUE OPTIONAL
IN “OFF” STATE ONLY IN “OFF” STATE ONLY

PRESS THE TAG

A B
PRESS THE
B A TAG
PUT THE LOCK KEEP THIS LEVER
THROUGH HOLES PRESSED

C
RECOMMENDED LOCK WITH Ø 5.....7 mm PUT THE LOCK
MAX. 3 PAD LOCKS PANEL DOOR OPENING THROUGH HOLES PANEL DOOR OPENING
POSSIBLE NOT POSSIBLE
9. INTERLOCKING / DEFEAT 10. AUTO RESTORATION
DOOR INTERLOCKING IN ‘ON’ POSITION ONLY IN “ON” STATE ONLY

SP31027

JUST PUSH L&T Electrical & Automation, Electrical Standard Products


TO CLOSE rd
L&T Business Park, TC-2, Tower B, 3 Floor,
INSERT DIA. 2 MM TOOL IN THE HOLE Gate No.5, Saki Vihar Road, Powai,
SHOWN AND PUSH IT TO DEFEAT THE Mumbai - 400 072, INDIA. www.Lntebg.com
PANEL DOOR OPENING DOOR INTERLOCKING PANEL DOOR OPENING
NOT POSSIBLE POSSIBLE

You might also like