(A) Introduction: - An Ultrasound Technology based Compressed Air, Natural Gas & Steam
leak Audit was undertaken on 10th July 2023 at GRP Pvt. Ltd.
GRP Pvt. Ltd. is a leading manufacturing company of recycling rubber and reusing rubber for
new manufacturing in India. The brief details of the exercise are as follows: -
• HT yard, LT room
Objective: - The main objectives of this exercise was to detect all minor and major leaks in
Compressed Air, Steam System & Electrical HT & LT to find energy losses due to these so that a
strategic action plancan be initiated to enhance plant’s Pneumatic System Hygiene, operational
availability, and overall productivity.
High Voltage Electrical Asset were also inspected to detect presence of any Partial Discharge
(PD) related problems.
(B) Expected benefits: - All the leaking points were identified and documented. Plugging
these leaks will result in monetary savings, operational excellence, and improvement in plant
hygiene. Rectification of PD related problems will improve the reliability of High Voltage Electrical
assets resulting in safe operation and seamless production.
Page 2 of 3
(2) Executive Summary: -
(A) Jobs Undertaken: Leak detection using Ultrasound Technology for Energy Saving by finding
leaks in Compressed Air Systems, Steam line & Partial Discharge detection in HT & LT system.
These defect, being very small in intensity but large in numbers,could not be traced normally in noisy
and activity laden shop floors.
(B) Results of Inspection: A total of 22 leakages were found in compressed air system accounting
for about 62.53 Ltrs/Min loss of air and about 272.07 Ltrs/Min in Steam system. Expected
monitory savings post rectification of these leaks is about ₹ 3,55,720 per annum. A detailed
report indicating location, picture and extent of leaks is attached at Appendix A of this report. As a
general industry standard, an annual saving between 20% to 30% can be achieved by a complete
rectification of identified leaks. Savings will result from lesser running hours of compressors for
catering same requirement of shop floor, thus reducing overall Compressor’s power consumption
and allied maintenance work.
The Leak detection audit brought forward a new avenue for energy saving by rectifying the identified
leaks. This will also prolong the life of Compressors by reducing their running hours, and thus MTBF
and overall maintenance.
It is highly recommended that such audit be conducted on at least half-yearly basis to bring about a
positive change in maintenance and production activities thus raising overall reliability, reducing
maintenance cost, and enhancing profitability of the firm.
Page 3 of 3
Report | 11 Jul 2023
GRP CHINCHOLI
created by:
Ajay R. Yelve
SONAPHONE Serial:
10488
Leak Expert:
V1.6.3
number of measurements:
22
first - last measurement:
10 Jul 2023 - 10 Jul 2023
address: comment:
Mahadyuta Technical Solutions
Navi Mumbai, Cont.: 9961854160
SUMMARY
11 Jul 2023
GRP CHINCHOLI
2|15
Class 1: ≤ 1 l/min
GRP CHINCHOLI
3|15
Potential savings
Savings
The process of estimating the amount of leakage in a compressed air system is part of DIN EN
ISO 11011. This process provides data for energy management systems in accordance with DIN
EN ISO 50001. In this report, the total loss is indicated in l/min and can be used to estimate the
financial losses associated with the leakage, if data on the energy costs incurred when
generating 1m³ of compressed air is available.
Disclaimer: SONOTEC has developed a process for classifying and estimating the total leakage losses of a system to the best of its knowledge and ability, based on flow
acoustics methods. SONOTEC shall in no way be held liable for the results generated through the application of this process, nor for any decisions made on the basis of such
results. All actions taken by the end user based on the results are the sole responsibility of the end user, who accepts full liability for any such actions.
OVERVIEW
11 Jul 2023
GRP CHINCHOLI
4|15
1 10488-076 12.08 78 7.0 Air High Ajay 10 Jul 2023 …/…/…/… To be repaired
2 10488-073 11.10 68 7.0 Air High Ajay 10 Jul 2023 …/…/…/… To be repaired
3 10488-074 10.39 62 7.0 Air High Ajay 10 Jul 2023 …/…/…/… To be repaired
4 10488-072 10.35 61 7.0 Air High Ajay 10 Jul 2023 …/…/…/… To be repaired
5 10488-075 9.82 57 7.0 Air High Ajay 10 Jul 2023 …/…/…/… To be repaired
6 10488-077 8.79 48 7.0 Air Low Ajay 10 Jul 2023 …/…/…/… Not repaired
7 10488-078 0.00 49 20.0 STEAM High Ajay 10 Jul 2023 …/…/…/… To be repaired
8 10488-079 0.00 79 17.0 STEAM High Ajay 10 Jul 2023 …/…/…/… To be repaired
9 10488-080 0.00 84 17.0 STEAM High Ajay 10 Jul 2023 …/…/…/… To be repaired
10 10488-081 0.00 68 17.0 STEAM Low Ajay 10 Jul 2023 …/…/…/… Not repaired
11 10488-082 0.00 52 17.0 STEAM Low Ajay 10 Jul 2023 …/…/…/… Not repaired
12 10488-083 0.00 58 17.0 STEAM High Ajay 10 Jul 2023 …/…/…/… To be repaired
13 10488-084 0.00 68 17.0 STEAM High Ajay 10 Jul 2023 …/…/…/… To be repaired
14 10488-085 0.00 69 17.0 STEAM High Ajay 10 Jul 2023 …/…/…/… To be repaired
15 10488-086 0.00 71 17.0 STEAM High Ajay 10 Jul 2023 …/…/…/… To be repaired
16 10488-087 0.00 90 17.0 STEAM High Ajay 10 Jul 2023 …/…/…/… To be repaired
17 10488-088 0.00 52 17.0 Unkno… High Ajay 10 Jul 2023 …/…/…/… Not repaired
18 10488-089 0.00 40 17.0 Unkno… High Ajay 10 Jul 2023 …/…/…/… To be repaired
19 10488-090 0.00 54 17.0 Unkno… High Ajay 10 Jul 2023 …/…/…/… To be repaired
20 10488-091 0.00 50 17.0 Unkno… High Ajay 10 Jul 2023 …/…/…/… To be repaired
21 10488-092 0.00 35 17.0 Unkno… High Ajay 10 Jul 2023 …/…/…/… To be repaired
22 10488-093 0.00 36 17.0 Unkno… High Ajay 10 Jul 2023 …/…/…/… To be repaired
DETAILS
11 Jul 2023
GRP CHINCHOLI
5|15
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
System: BT plant
Location: BT plant steam main
line input
Gas: Steam
Remark: Steam leak detected at
flange near valve.
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]
Loss Leq p
Rating ID Gas Priority Tester Date
[l/min] [dB] [bar g]