3PK-PR-03 Requirement of Stocking New Technical Material
3PK-PR-03 Requirement of Stocking New Technical Material
3PK-PR-03 Requirement of Stocking New Technical Material
CONFIDENTIALITY NOTICE
This document is strictly confidential. Information contained in this document may not be reproduced
or disclosed to any person without the written permission of Philip Morris International.
Table of Contents
1 Purpose................................................................................................................................................
2 Scope/Applicability...............................................................................................................................
3 Definitions and Acronyms....................................................................................................................
4 Key Requirements................................................................................................................................
4.1 Principle.................................................................................................................................4
4.1.1 MRP Type for new technical materials...........................................................................4
4.1.2 Action that must be performed in the event of aberration...........................................5
5 Reference Documents..........................................................................................................................
6 Revision History....................................................................................................................................
7 Approval History...................................................................................................................................
Appendix A : “New Technical Materials Performance Analysis Corrective Action Request (CAR)”................
Effective date:
04 Equipment Management 04/10/2016
Doc. Type: Work
Version N°: 1.0.0.0 Status: Production Page 3 of 7
Instruction
1 Purpose
This Work Instruction defines / describes mandatory actions to ensure that the availability of New
Technical Materials stored in inventory matches with mandatory business requirements.
This Work Instruction addresses the requirements of PMI QS in order to establish procurement
control and defines:
How to request a stock of new technical materials How to maintain stock of new technical materials
& Must be categorized & Must be performed
- Category consumable technical materials - For category consumable, maintain initial stock
determined based on the recommended ROP
from manufacturing center
- For category non consumable, maintain initial
stock done by reservation/consumption
- Category non consumable technical materials commitment. Commitment must be in the
form of ( date, month, year)
- For category electronic, maintain initial stock
determined based on quantity usage in one
machine
2 Scope/Applicability
This Work Instruction applies to the following:
Table 1: Scope/Applicability
4 Key Requirements
4.1 Principle
All inventory of new Technical Materials registered in SAP P1 must be segmented into 3 categories
according to frequency of usage in which category consumable technical materials with stock
condition should always be available. As for the category of non-consumable technical materials,
Manufacturing compulsory booked and consumed in accordance with a predetermined plan.
Whereas for category electronic with stock condition should always be available. Valid justification
must be provided and corrective action must be performed by manufacturing if the evaluation
results are not meeting with minimum requirements stated in Current Document-work instruction
See appendix A: New Technical Materials Performance Analysis Corrective Action Request (CAR)
Non consumable
Technical materials besides consumable
technical PD 0
category / except consumable
materials
Quantity stock exceeds Manufacturing, When it passed the quantity usage in one
machine, automated technical material will be
Electronic than quantity usage in Factory issued from inventory and charged to cost
one machine center of requestor’s department
Logistic
5 Reference Documents
Q1468 PMI Technical Materials Management
Q1468.002 Technical Materials Management MRP
Q168.003 Technical Materials Performance Analysis
6 Revision History
Version N° Author Effective Date Description of Change
7 Approval History
Written By Approved By
Instruction
Rating HIGH
Manufacturing
MC Rating MEDIUM
Center
Rating LOW