3PK-PR-03 Requirement of Stocking New Technical Material

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 7

Effective date:

04 Equipment Management 04/10/2016


Doc. Type: Work
Version N°: 1.0.0.0 Status: Production Page 1 of 7
Instruction

3PK-PR-03 Requirement of Stocking New Technical Material

“3PK-PR-03 REQUIREMENT OF STOCKING NEW


TECHNICAL MATERIAL”

CONFIDENTIALITY NOTICE
This document is strictly confidential. Information contained in this document may not be reproduced
or disclosed to any person without the written permission of Philip Morris International.

Quality Management Operations System


Effective date:
04 Equipment Management 04/10/2016
Doc. Type: Work
Version N°: 1.0.0.0 Status: Production Page 2 of 7
Instruction

3PK-PR-03 Requirement of Stocking New Technical Material

Table of Contents
1 Purpose................................................................................................................................................
2 Scope/Applicability...............................................................................................................................
3 Definitions and Acronyms....................................................................................................................
4 Key Requirements................................................................................................................................
4.1 Principle.................................................................................................................................4
4.1.1 MRP Type for new technical materials...........................................................................4
4.1.2 Action that must be performed in the event of aberration...........................................5
5 Reference Documents..........................................................................................................................
6 Revision History....................................................................................................................................
7 Approval History...................................................................................................................................
Appendix A : “New Technical Materials Performance Analysis Corrective Action Request (CAR)”................
Effective date:
04 Equipment Management 04/10/2016
Doc. Type: Work
Version N°: 1.0.0.0 Status: Production Page 3 of 7
Instruction

3PK-PR-03 Requirement of Stocking New Technical Material

1 Purpose
This Work Instruction defines / describes mandatory actions to ensure that the availability of New
Technical Materials stored in inventory matches with mandatory business requirements.

This Work Instruction addresses the requirements of PMI QS in order to establish procurement
control and defines:

How to request a stock of new technical materials How to maintain stock of new technical materials
& Must be categorized & Must be performed

- Category consumable technical materials - For category consumable, maintain initial stock
determined based on the recommended ROP
from manufacturing center
- For category non consumable, maintain initial
stock done by reservation/consumption
- Category non consumable technical materials commitment. Commitment must be in the
form of ( date, month, year)
- For category electronic, maintain initial stock
determined based on quantity usage in one
machine

- Category Electronic Technical Materials

2 Scope/Applicability
This Work Instruction applies to the following:

Products & Technical Materials


Services

Processes 04 Equipment Management

Functions & Operations


Business units

Table 1: Scope/Applicability

3 Definitions and Acronyms


See PMI Operations Glossary
Effective date:
04 Equipment Management 04/10/2016
Doc. Type: Work
Version N°: 1.0.0.0 Status: Production Page 4 of 7
Instruction

3PK-PR-03 Requirement of Stocking New Technical Material

4 Key Requirements
4.1 Principle
All inventory of new Technical Materials registered in SAP P1 must be segmented into 3 categories
according to frequency of usage in which category consumable technical materials with stock
condition should always be available. As for the category of non-consumable technical materials,
Manufacturing compulsory booked and consumed in accordance with a predetermined plan.
Whereas for category electronic with stock condition should always be available. Valid justification
must be provided and corrective action must be performed by manufacturing if the evaluation
results are not meeting with minimum requirements stated in Current Document-work instruction

See appendix A: New Technical Materials Performance Analysis Corrective Action Request (CAR)

4.1.1 MRP Type for new technical materials


Consumable, non-consumable and electronic technical materials must be given a certain MRP type
in SAP P1

Category Description MRP Reorder Point


Type

Technical materials used to support the


Consumable production process. Materials with a
technical relatively short technical lifetime, used-up V1 >0
materials and replaced during the production process,
which are not part of the finished product

Non consumable
Technical materials besides consumable
technical PD 0
category / except consumable
materials

A technical material for which we do not


anticipate actual usages, but that will be held
in stock because it needs to be available at 1 or maximum = quantity
Electronic V1
all times to secure the continuation and usage in one machine
safety of production process, in case of
emergencies
Effective date:
04 Equipment Management 04/10/2016
Doc. Type: Work
Version N°: 1.0.0.0 Status: Production Page 5 of 7
Instruction

3PK-PR-03 Requirement of Stocking New Technical Material

4.1.2 Action that must be performed in the event of aberration

Category Aberration Responsible Action must be performed

Consumable Modified specification of Provide recommendation for disposal of


technical technical materials and technical materials by issuing from inventory
Manufacturing
materials machine condition and charged to cost center of requestor’s
department

Non Reservation/consumption Manufacturing, When it passed the time planning, predefined


consumable commitment is not used automated technical materials will be issued
technical Factory from inventory and charged to cost center of
in accordance with a
materials predetermined plan Logistic requestor’s department

Quantity stock exceeds Manufacturing, When it passed the quantity usage in one
machine, automated technical material will be
Electronic than quantity usage in Factory issued from inventory and charged to cost
one machine center of requestor’s department
Logistic

5 Reference Documents
 Q1468 PMI Technical Materials Management
 Q1468.002 Technical Materials Management MRP
 Q168.003 Technical Materials Performance Analysis

6 Revision History
Version N° Author Effective Date Description of Change

(dd/mm/yyyy) (including reason for change)


1.0 Adil Sunil 22/01/2015 Original Document
2.0 Muhammad Umer 04/10/2016 Conversion to new Template
Table 9: Revision history

7 Approval History
Written By Approved By

Name: Muhammad Umer Salman Anwer Ali Khan


Effective date:
04 Equipment Management 04/10/2016
Doc. Type: Work
Version N°: 1.0.0.0 Status: Production Page 6 of 7
Instruction

3PK-PR-03 Requirement of Stocking New Technical Material

Position: TMM Specialist Manager Supply Chain

Department: Supply Chain Supply Chain


Effective date:
04 Equipment Management 04/10/2016
Doc. Type: Work
Version N°: 1.0.0.0 Status: Production Page 7 of 7
Instruction

3PK-PR-03 Requirement of Stocking New Technical Material

Appendix A : “New Technical Materials Performance Analysis


Corrective Action Request (CAR)”
Minimum requirements for
Accountability Chapter Importance Explanation
QS Document …..

Manufacturing Center must


establish planning new
Company unable to
technical materials based on
evaluate current
category frequency of usage
inventory, create
into 2 category according to
uncertainty of
Work instruction:
availability stock,
4. Key Elements & overstock
1. Consumable Technical MC Medium
Responsibility conditions ,increase
Materials
value provision and
2. Non consumable Technical the increased risk of
Materials disposal of parts in
bulk
3. Electronic Technical
Materials

Manufacturing Center must


ensure valid justification and
performs corrective action in
New technical materials if the Company unable to
4. Key Elements &
evaluation results are not MC Medium anticipate condition
Responsibility
meeting with minimum of inventory
requirement stated in Work

Instruction

Rating HIGH
Manufacturing
MC Rating MEDIUM
Center
Rating LOW