Sr.No.

ACTIVITY PLAN ( Plant Readiness ) Nov-23


A READINESS ACTIVITY QUANTITY RESP. Wk-1 Wk-2
Plan
1 Plant Layout Actual
Plan
2 Floor Layout Actual
Plan
3 Floor Readiness ( Including Machine Foundation ) Actual
Plan
4 Plant Power Supply Actual
Plan
5 False ceiling Work Actual
Plan
6 Electric Wiring Actual
Plan
7 Lightening Work ( Inside & Outside ) Actual
Plan
8 LT Panel Room Actual
Plan
9 DG Platform Actual
Plan
10 Earthing Work Actual
Plan
11 Building Earthing & Lightning protection Actual
Plan
14 Reception Actual
Plan
15 Main Security Actual
Plan
16 Office Actual
Plan
17 IT Server Room Actual
Plan
18 Fire Hydrant work Actual
Plan
19 Fire Sprinkler System Actual
Plan
20 Fire NOC Actual
Plan
21 Transformer 1500 KW Actual
Plan
22 Factory Licence Actual
Plan
23 Electrical Sanctioned Load for 800 KW load Actual
Nov-23 Dec-23 Jan-24
Wk-3 Wk-4 Wk-5 Wk-6 Wk-7 Wk-8 Wk-9 Wk-10 Wk-11 Wk-12
Feb-24 Mar-24 Apr-24
Wk-13 Wk-14 Wk-15 Wk-16 Wk-13 Wk-14 Wk-15 Wk-16 Wk-13 Wk-14
Apr-24
Wk-15 Wk-16
Sr.No. ACTIVITY PLAN ( Plant Readiness )
A READINESS ACTIVITY QUANTITY
1 Plant Layout
2 Floor Layout

3 Floor Readiness ( Including Machine Foundation )

4 Plant Power Supply

5 False ceiling Work (Height Pdi, Fg area,office )

6 Partition in Ground floor and First floor


7 Guard Room (10*10)
8 Waiting room near Guard Room (10*10)
9 Temple
10 Boundary wall
11 Fire tank
11 Electric Wiring
12 Lt panel Boq finalisation
13 Lt panel vendor finalisation
14 Installation of panel
15 Lighting work of machine shop
16 Lighting lux level and quantity finalisation
17 Electrical work of office building
18 Earthing pit
19 Lighting work of outer area
20 Forging shop
21 Forging Press machine Installation
22 Foundation Civil work Forging press

23 Trimming Press procurement

24 Installation Of Trimming Press (ISGEC)


25 Graphatisation machine
26 Saw cutter machine
27 Dust collector
30 Machine Shop
31 Buffoli machine 1
32 Any Foundation for Buffoli machine
33 Installation date of machine (Buffoli )
34 Kestek machine (Rotary Transfer machine) 1
35 Installation date
36 Ultra sonic machine Finalisation 1
37 Cnc machine
38 Vmc machine
39 Fire Safety and Utility

40 Fire scheme

41 Installation of Sprinkler system


42 Installation smoke detector
43 Fire Hydrant work
44 Installation of Fire fighting system
45 Installation of Over head Tank
46 Fire Noc
47 Testing of Fire line
48 Transformer 1500 KVA
49 Factory Licence
50 Electrical Sanctioned Load for 800 KW load
51 Dg 250 Kva
52 Low compressor 1
53 receiver tank of low compressor

Pneumatic Line For Low pressure

54 High Compressor
55 Receiver tank of High compressor

56 Pneumatic Line For High pressure

57 Helium Recovery unit

Helium Recovery Pressure Line

58 Assembly line

59 Assembly line 1

60 Assembly line 2
Nov-23
Remarks Target Date Wk-1
Plan
Done Actual
Plan
Done Actual
Plan
FM2 vendor finalised by Mr Mukesh will begin with
in this week 12/11/23 Actual
Plan
Actual
Plan
visit of vendors done (Sdg
archutecture/Sakib/Sadafal ) Actual
Plan
Actual
Plan
Position Informed to civil contactor Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Shuttering work on going Actual
Plan
Actual
Plan
Done Actual
Plan
Actual
Plan
Actual
Plan
Explained to vendor Actual
Plan
400 Lux level on shop floor quantity updatecd Actual
Plan
Complete layout explained Vendor Actual
Plan
Visit of vendor done (Zeniya/Sadafal/Global) Actual
Plan
Explained to vendor Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Done Machine model final and approval note signed Actual
Plan
Actual
Plan
Done Actual
Plan
Done Actual
Plan
Approval note signed Actual
Plan
Actual
Plan
Done Actual
Plan
Actual
Plan
Actual
Plan
Done Actual
Plan
Actual
Plan
Aprroval note signed Actual
Plan
2 qty received at trial Actual
Plan
Actual
Plan
Actual
Plan
Mukesh ji will submit as position of fire line changed Actual
Plan
Done Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Approval note signed Actual
Plan
Approval note signed Actual
Plan
Vendor visit done (sadafal, Saskib quote not
received yet) Actual
Plan
Comparrison submitted Actual
Plan
Quotation submitted Actual
Plan
Vendor visit done (sadafal, Saskib quote not
received yet) Actual
Plan
Need to take unit from Klr divison
Actual
Vendor visit done (sadafal, Saskib quote not Plan
received yet) Actual
Plan
Actual
Plan
One line at Klr Actual
Plan
Actual
Nov-23 Dec-23 Jan-24
Wk-2 Wk-3 Wk-4 Wk-5 Wk-6 Wk-7 Wk-8 Wk-9 Wk-10 Wk-11
n-24 Feb-24 Mar-24 Apr-24
Wk-12 Wk-13 Wk-14 Wk-15 Wk-16 Wk-13 Wk-14 Wk-15 Wk-16 Wk-13
Apr-24
Wk-14 Wk-15 Wk-16

You might also like