The document is an order list for construction materials in May 2023. It includes over 100 items with descriptions, quantities ordered, and prices. The total order value is calculated to be 280,000. Key materials ordered include bricks, tiles, paints, pipes, electrical wires, doors and windows fittings and bathroom fixtures.
The document is an order list for construction materials in May 2023. It includes over 100 items with descriptions, quantities ordered, and prices. The total order value is calculated to be 280,000. Key materials ordered include bricks, tiles, paints, pipes, electrical wires, doors and windows fittings and bathroom fixtures.
The document is an order list for construction materials in May 2023. It includes over 100 items with descriptions, quantities ordered, and prices. The total order value is calculated to be 280,000. Key materials ordered include bricks, tiles, paints, pipes, electrical wires, doors and windows fittings and bathroom fixtures.
No SAT TOTAL TANGGAL 20 MATERIAL NAMA BARANG 2 Ampelas 10,000 mtr 0 3 Baja ringan .CNP C75 65,000 btg 0 4 bak cuci piring single ( BCP ) 110,000 bh 0 5 Bambu 12,000 btg 0 6 Bata Ringan hebel 075 586,500 kb 0 7 bak cat 6,500 bh 0 Batu belah 1,050,000 dam 0