Professional Documents
Culture Documents
Pole On One Side
Pole On One Side
8m high singlel arm pole on the side with 28m distance and 1m bollard for the sidewalk on both side of the road
Design Criteria:M5
Avg. Luminance (Lav) cd/m2 ≥0.5, Uniformity (U0) ≥ 0.35
Longitudinal Uniformity (Ul) ≥ 0.4, Threshold Index (Ti) ≤ 15
Walkway:P4
Avg. Illuminance (Eav) lux ≥5, (Emin) ≥ 1
Cycle track:P4
Avg. Illuminance (Eav) lux ≥5, (Emin) ≥ 1
Calculated Values:
Avg. Luminance (Lav) cd/m2 =0.65, Uniformity (U0) = 0.62
Longitudinal Uniformity (Ul) = 0.51, Threshold Index (Ti) = 7
Walkway:
Avg. Illuminance (Eav) lux = 10.05, (Emin) = 1.07
Cycle track:
Avg. Illuminance (Eav) lux = 7.24, (Emin) = 4.38
Date: 07.03.2024
Operator:
Local road lighting calculation - pole on one side
07.03.2024
Operator
Telephone
Fax
e-Mail
Table of contents
Page 2
Local road lighting calculation - pole on one side
07.03.2024
Operator
Telephone
Fax
e-Mail
Local road lighting calculation - pole on one side / Luminaire parts list
Page 3
Local road lighting calculation - pole on one side
07.03.2024
Operator
Telephone
Fax
e-Mail
Luminous emittance 1:
Luminaire classification according to CIE: 100 Due to missing symmetry properties, no UGR table can
CIE flux code: 20 50 90 100 100 be displayed for this luminaire.
Page 4
Local road lighting calculation - pole on one side
07.03.2024
Operator
Telephone
Fax
e-Mail
Luminous emittance 1:
Luminaire classification according to CIE: 100 Due to missing symmetry properties, no UGR table can
CIE flux code: 35 79 97 100 100 be displayed for this luminaire.
Page 5
Local road lighting calculation - pole on one side
07.03.2024
Operator
Telephone
Fax
e-Mail
Street Profile
Page 6
Local road lighting calculation - pole on one side
07.03.2024
Operator
Telephone
Fax
e-Mail
Page 7
Local road lighting calculation - pole on one side
07.03.2024
Operator
Telephone
Fax
e-Mail
Street 1 / 3D Rendering
Page 8
Local road lighting calculation - pole on one side
07.03.2024
Operator
Telephone
Fax
e-Mail
Grid: 10 x 6 Points
Observer Position: (-60.000 m, 1.675 m, 1.500 m)
tarmac: R3, q0: 0.070
Fulfilled/Not fulfilled:
Page 9
Local road lighting calculation - pole on one side
07.03.2024
Operator
Telephone
Fax
e-Mail
Grid: 10 x 6 Points
Observer Position: (-60.000 m, 5.025 m, 1.500 m)
tarmac: R3, q0: 0.070
Fulfilled/Not fulfilled:
Page 10