QAP NO.

DVPL/CI-WG/J-2441
QUALITY ASSURANCE PLAN /24-7515C REV.0
ITEM: C.I. RISING STEM WEIR GATE . DATE :15.02.2024
OPERATION:BY ELECTRICALLY ACTUATOR THROUGH BEVEL GEAR
PAGE 1 OF 1
OPERATED DOWNWARD OPENING
PROJECT: JICA Assisted Bengaluru Water supply & Sewerage Project (Phase III) Sewerage Facilities in Bytrayanapura
DURGA VALVES PRIVATE LIMITED
Zone(Hebbal valley catchment)(Contract Package BWSSP (III) / JICA / CP-25)
ICHAPUR ROAD CANNEL SIDE REF. No. :PEEIPL / 815.127 / CP 25 / 038 DATE:09.08.2023
SANTRAGACHI CONTRACTOR: Passavant Energy & Enviroment India pvt.ltd & Pee GMBH JV
CONSULTANT:Oriental Consultants Global Co. Ltd.Japan (OC Global), NJS Engineers India Pvt. Ltd.(NJSEI), TATA
HOWRAH-711104 ( W.B ) INDIA Consulting Engineers Ltd.(TCE), In Association with Black & Veatch (BV)
CLIENT:Bangalore Water Supply and Sewerage Board.
( BILLISHIVALLI 17 MLD STP-CP 25)

SL COMPONENTS & TYPE OF QUANTUM REFERENCE ACCEPTANCE FORMAT OF AGENCY


CHARACTERISTICS CLASS
NO OPERATION CHECK OF CHECK DOCUMENTS NORMS RECORD. DVPL CLIENT T.P.I.

MATERIAL TEST
ONE PER
GATE FRAME,
a) TENSILE STRENGTH MAJOR PHYSICAL HEAT / P R R
DOOR, ETC.
MELT

CHEMICAL
CHEMICAL & TEST
b) STEM COMPOSITION & MAJOR P R R
PHYSICAL REPORT /
TENSILE STRENGTH
APPROVED APPROVED MANUFACT
ONE PER
G.A. DraWING G.A. DraWING URER TEST
CHEMICAL LOT
c) SEATING FACE MAJOR CHEMICAL CERTIFICAT P R R
COMPOSITION
E
POLYMER
d) RUBBER SEAL MAJOR P R R
IDENTIFICATION
PHYSICAL
ELECTRIC
e) PHYSICAL MAJOR 100% P DR DR
ACTUATOR
SHOP TEST

OVERALL APPROVED APPROVED


a) DIMENSION MAJOR P W W
DIMENSIONAL G.A. DraWING G.A. DraWING

MEASUREMEN
T AS PER POINT
GAP BETWEEN NO.3 OF
b) SEAT CLEARANCE MAJOR <0.10 mm P W W
SEALING FACE One per Lot ANNEXTURE
C INSPECTIO
of Similer
N REPORT
Size Gates
AS PER POINT SMOOTH
MOVEMENT OF
NO.4 OF INTERFERENC
c) MOVEMENT SHUTTER BETWEEN MAJOR VISUAL P W W
ANNEXTURE E FREE
GUIDE
C MOVEMENT

d) Coating & Painting - MAJOR DFT CHECK - RANDOM P W W


LEGEND- P- PERFORM W - WITNESS R- REVIEW TC- TEST CERTIFICATE TPI-3RD. PARTY INSPECTION ,
DR-DOCUMENT REVIEW
NOTE-
1) Please Refer Annexure "C" for further details on Shop Test
2) We reserve our rights to conduct materials testing in House or by our Approved Testing Laboratory.
3) We do not undertake to conduct additional testing other than those stated above.
4) Gates will be tested for movement with shop operating arrangement
5) Upon receipt of job actuator, test certificate will be submitted for review and dispatch clearance of actuators.
6) Gates can also be offered for inspection in painted condition to ensure faster delivery after inspection.
7) Motor / Actuator test certificate to be submitted review at the time of inspection.
8) Material test certificate carried out from government approved laboratories only.(NABL lab)
Approved By Client comments if any