TR0587 Connectors and Couplings Hazard Analysis
TR0587 Connectors and Couplings Hazard Analysis
Manufacturer: STATS UK Ltd Pressure Equipment: 2", 3", 4" & 8" Connectors and Couplings
Project No: J06834 ESR Report No: TR0587
Client: Petrofac PED Class: CAT III, MODULE G
STATS-GRP-PRO-F-001.18
ESR SUMMARY FOR CE MARKING OF PRESSURE EQUIPMENT
(PED)
Materials
4.3 Materials documentation Materials certification 3.1
STATS-GRP-PRO-F-001.18
Connectors and Couplings PED Hazard Assessment
Manufacturer: STATS UK Ltd Pressure Equipment: 2", 3", 4" & 8" Connectors and Couplings
Project No: J06834 ESR Report No: TR0587
Client: Petrofac PED Class: CAT III, MODULE G
Risk # Potential Hazards Possible Failure Mode Potential Impact Probability Risk Rating Manage-ability Risk Mitigation Plans
1=Minor 1=Rare High (9-16)
2=Moderate 2=Unlikely Moderate (5-8)
3=Major 3=Possible Low (1-4)
4=Severe 4=Probable None
Locks retaining failure or disengage from the 1.Overloading 1. QC Inspection of all components
lock segments causing locks to become 2. Material defect 2. Factory acceptance tests.
3 2 2 4
misaligned or fall off, preventing the couplers 3. Metal fatique. 3. Pre-deployment checks
or connectors to be set. 4. Incorrect assembly 4. Proper packaging and restraining of plug train
STATS-GRP-PRO-F-001.18
Connectors and Couplings PED Hazard Assessment
Manufacturer: STATS UK Ltd Pressure Equipment: 2", 3", 4" & 8" Connectors and Couplings
Project No: J06834 ESR Report No: TR0587
Client: Petrofac PED Class: CAT III, MODULE G
Risk # Potential Hazards Possible Failure Mode Potential Impact Probability Risk Rating Manage-ability Risk Mitigation Plans
1=Minor 1=Rare High (9-16)
2=Moderate 2=Unlikely Moderate (5-8)
3=Major 3=Possible Low (1-4)
4=Severe 4=Probable None
1. Design and manufacture of component in accordance
with recognised standards for material selection,
1.Overloading 2. QC Inspection of all components and dry fitting.
2. Material defect 3. Components coated with xylan for corrossion
Anti-extrusion ring structural damange and/or 3. Metal fatique. prevention.
5 misalignment leading to failure to support and 4. Out of tolerance due to 2 3 6 Moderate 4. Factory acceptance test
compress the seals, seals damage incorrect machining 5. Strenght test of the whole assembly.
5.Incorrect assembly
6. Corrossion
STATS-GRP-PRO-F-001.18
STATS - Risk Metrics
Q: What is a project risk?
A: Project risk is defined by PMI as 'an uncertain event or condition that, if it occurs, has a positive or negative effect on a project's objectives'.
The project team does not deem this risk likely to The project team have no ability to prevent (Impact x Colour
< 1% Rare 1 None
occur under current circumstances this risk (it is externally driven) probability)
The project team think there is a small chance of The project team have some ability to
< 10% Unlikely 2 Low 1 to 4
this risk occurring prevent this risk Low
This risk is deemed as more likely to occur than not This risk is entirely within project team
> 50% Probable 4 High 9 to 16
to occur under current circumstances control and can be mitigated
High
A significant impact on
A major impact which
the business strategy Long term damage to
<15% <15% with proper management 3
and likely need to re- reputation
can be endured
engineer