RISK ASSESSEMENT PLAN FOR BOOSTER PUMP TESTING & COMMISSIONING

PROJECT : THE VALLEY PAVILION PROPOSED B+G+R FLOORS COMMERCIAL BUILDING PLOT NO: 9150409, AL YUFRAH 1, DUBAI, U.A.E
MEP CONTRACTOR : DOVE
CLIENT : EMAAR PROPERTIES PJSC MAIN CONTRACTOR : AL RAKHA GENERAL CONTRACTING LLC DATE : 05/03/2024
CONTRACTING LLC
RISK RATING
S.NO TASK STEP HAZARD CONTROL MEASURES RESPONSIBLE PERSON
Probability Severity Risk
1) Inspection of Lifting gears prior to use.
2) Materials should be properly loaded,
Supported and Protected.
Materials fall off while lifting 3) Operation Supported by rigger.
Material receiving, Handling and Site Manager, Site Supervisor and Stor
1 Equipment(Fork lift, teehandler 4)Lifting permit required. 2% 4% 8%
Storage Keeper
or Mobile crane). 5)Certified crane operator and Equipment,
Flag men/ Banks Men.
6)Lifitng area to be cordoned off.
1) Safe means of access to be provided.
Fall from height falling materials 2) Use of Full body harness above 1.8 Meters.
2 Installation/Erection/Work 3) Adequte protection and guarding on edges. 2% 5% 10% Site Supervisor and Foreman
Slip/Trip
4)Task Instruction.
1) Use proper technical team
2) Tank overflow to be connected nearest drain
Splash of water or Jet waters and point
3 Water Overflow and spillage 1% 3% 3% Foreman and Operatives
overflow 3) water accumulation drum for collecting the
spillage water
4)Task instruction
1) Certified Welders,
2) Dry chemical Powder Extinghuser in
location.
Bus Fire, Eye injury, Respiratory 3)Appropirate use of Fire blankets.
4 Welding and Grinding disorders, Electric shock, UV 4)Adhequte ventilation shoud be provided. 2% 5% 10% Supervisor, Foreman and Operatives
Radiation Appropirate PPE : Face shield, Sleeves,
Welding gloves,Safety shoes, Ear plugs
5)Welding cables shall be fully inspected.
6)Use socket
1) Inspect to conect materials
Scaffolding cables. and scafolding
Improper usage of tag. Secure ladder firmly in position. Do not
Rectificartion of any leakage HP Ladder/Scaffold, Falling from carry tools in pocket. While using ladders. Saftety Supervisor, Site Supervisor and
5 1% 3% 3%
pipes, Fittings and valves height, Tools falling down, 2)Use safety harness if required; Wear proper Operatives
Property Damge, Persnol injury PPE

Improper usage of 1) Secure ladder and ensure scaffolding is


Ladder/Scaffold, Falling from certified for use.
Drilling, Threading, Grooving and 2)Barricade and isolate the area.
6 height, Tools falling down, 1% 3% 3% Operatives
Fixing supports 3)Use proper Pipes & fittings
Breaking drill bit, Threded dye
breaken, Persnol injury 4)Make centre punch before drilling hole.
Equipments to be installaed at 1) Secure ladder and ensure scaffolding is
elevated level, falling from certified to use
Installation and fixing of Gauges, Project Engineer, QA/QC Engineers, Forman,
7 height, sharp edges of cable an 2) Only experienced personnel shall be 2% 3% 6%
Valves and accessories Workers
cause cut, failing tools from engaged for work.
height 3) tool box talk to be conducted.

AL RAKHA GENERAL CONTRACTING LLC RISK ASSESSEMENT PLAN DOVE CONTRACTING LLC
1) Where ever possible adequate shelter or
Heat stress- Heat exhaustion/ shade be made available.
8 Working in Hot Climate 2% 2% 4% All
Heat stroke 2) Sufficient cool drinking water be available.
3) First aid box be available on site.
Sharp tools and waste materials 1) Use of Gloves. Collect and dispose waste in
9 House keeping lying on the floor bins kept for the purpose, 1% 4% 4% House keeping Department
persnol injury 2) Keep the floor clean

Signature Date

Reviewed By : Bibin Varghese Project Engineer

Verfied By : Moahmed Mukthar Technical Engineer

Approved By : Mohamed Ashoush Senior Mechanical Engineer

AL RAKHA GENERAL CONTRACTING LLC RISK ASSESSEMENT PLAN DOVE CONTRACTING LLC