This document summarizes the distribution board schedule for the LECC room in the PDO Mai office. It lists 12 circuits connected to the 63A TPN isolator and 63A ELCB 100mA incoming breaker fed from the SMDB panel in the clinic. It details the circuit name/load, number of points, connected load per point, and calculated circuit and diversified loads for each phase and in total. The total connected load is 14.53kW and the diversified load is 11.63kW.
This document summarizes the distribution board schedule for the LECC room in the PDO Mai office. It lists 12 circuits connected to the 63A TPN isolator and 63A ELCB 100mA incoming breaker fed from the SMDB panel in the clinic. It details the circuit name/load, number of points, connected load per point, and calculated circuit and diversified loads for each phase and in total. The total connected load is 14.53kW and the diversified load is 11.63kW.
This document summarizes the distribution board schedule for the LECC room in the PDO Mai office. It lists 12 circuits connected to the 63A TPN isolator and 63A ELCB 100mA incoming breaker fed from the SMDB panel in the clinic. It details the circuit name/load, number of points, connected load per point, and calculated circuit and diversified loads for each phase and in total. The total connected load is 14.53kW and the diversified load is 11.63kW.