Copy of Production (01 09 17 To 09 09 17)
Copy of Production (01 09 17 To 09 09 17)
Date 1 2 4 5 6 7 8
Plan 200 220 250 200 200 200 220
Achived 200 220 250 218 160 200 225
Eff % 100.0 100.0 100.0 109.0 80.0 100.0 102.3
DELIVERY
120.0
109.0
100.0 100.0 100.0 100.0
100.0
80.0
80.0
Efficiency %
GRINDING MACHINE
60.0
40.0
20.0
0.0 BKD
1 2 4 5 6 7
120.0
109.0
100.0 100.0 100.0 100.0
100.0
80.0
80.0
Efficiency %
GRINDING MACHINE
60.0
40.0
20.0
BKD
0.0
1 2 4 5 6 7
Date
CNC MACHINING (01/09/17 To 09/09/17)
Date 1 2 4 5 6 7 8
Plan 180 189 145 180 180 140 110
Achived 176 165 85 152 110 124 104
Eff % 97.8 87.3 58.6 84.4 61.1 88.6 94.5
CNC MACHINING
120.0
97.8
100.0
87.3
84.4
80.0
Efficiency %
60.0 58.6
SETTING
CHANGE
40.0 D 868 TO
B90
120.0
97.8
100.0
87.3
84.4
80.0
Efficiency %
60.0 58.6
SETTING
CHANGE
40.0 D 868 TO
Date B90
20.0
0.0
1 2 4 5
FINIAL GRINDING (01/09/17 To 09/09/17)
Date 1 2 4 5 6 7 8
Plan 220 220 220 220 220 220 220
Achived 203 266 147 108 206 198 175
Eff % 92.3 120.9 66.8 49.1 93.6 90.0 79.5
FINIAL GRINDING
140.0
120.9
120.0
100.0
92.3
80.0
Efficiency %
66.8
60.0 SETTING
SHANGE 49.1
868 TO
B90
40.0
140.0
120.9
120.0
100.0
92.3
80.0
Efficiency %
66.8
60.0 SETTING
SHANGE 49.1
868 TO
B90
40.0
6 HRS
MAINT
(MECH)
20.0
0.0
1 2 4 5
DRILLING (01/09/17 To 09/09/17)
Date 1 2 4 5 6 7 8 9
Plan 220 220 220 220 220 220 220 220
Achived 198 185 85 191 135 178 175 90
Eff % 90.0 84.1 38.6 86.8 61.4 80.9 79.5 40.9
80.0
60.0
Efficiency %
38.6
40.0
WANT
OF
MAT
100.0
90.0
86.8
84.1
80.0
60.0
Efficiency %
38.6
40.0
WANT
OF
MAT
20.0
0.0
1 2 4 5
Date