BUILDING WORKS AGREEMENT

This agreement (“Agreement”) is made on ... 3rd February 2024.. by and between

(1) Furnitech Kenya Limited, a company organised and existing under the laws of
Kenya, having its registered office at Imani Plaza, Lumumba Drive, Roysambu -
Nairobi (hereinafter referred to as “FKL”
and
(2) ....BABA TAIRON.... (client) Individual organised and existing under the laws of
Kenya, having its registered Home at ….KAMULU.

also herein referred to as individually as “Party” and together as “Parties”

Whereas FKL wishes to acquire the execution of Building works defined below.

FKL and …. BABA TAIRON… respectively agree to the following:-

SCOPE OF WORKS: …

1)Supply and install gypsum ceilings complete with cornices, wiring & electrical lighting.

2) Supply and fix 3D signages on the side of the shop with colour & lighting

3) Supply and fix open shelve cabinet with wall mirrors plus a designated cashier counter.

4) Design MDF boards as per sample provided & clad them on the exterior wall, with a white

percept glass & lighting.

5) Supply and fix aluminium sliding door.

LOCATION: …… KAMULU

CONTRACT SUM: … 410,000

CONTRACT PERIOD: … Open…

TERMS: …. The contractor(fkl) to supply all materials as and when required; The Contractor
to stick to architectural and structural designs and meet all regulatory requirements. …

PAYMENT TERMS
ALL PAYMENT TO BE MADE WHILE WORK ON PROGRESS I.E FROM 30% AND SHOULD BE
MADE ON CASH OR MPESA ON NUMBER PROVIDED (0721661079)

FKL & Baba Tairon have executed this Agreement at the day and year indicated above.

www.fkl.co.ke 1
FKL CLIENT

………………………………………….
Name: FRED LAVATE Name: BABA TAIRON

Title: DIRECTOR Title: OWNER

Date: 3RD FEBRUARY 2024 Date: 3RD FEBRUARY 2024

www.fkl.co.ke 2