Make sure all the goods are unloaded, not missing… The biggest and heaviest package is the
gantry box which is the most important component in CT, all the goods should be good
protected and stored in good condition (Do not store in the open air, avoid rain), and don't
open the packages of the machine.
Unboxing steps
1. Use unboxing tool as shown in Figure 1, or a screwdriver to open the buckle.
Open the waterproof layer.
3. Disassemble the covers on the left and right sides of the gantry and the connecting pieces.
Note that you need to take pictures to record the original state.
4. Install the transportation wheels (dolly) onto the gantry step by step. As shown in the figure.
Unboxing tools (in the tools bag) or using screw driver.
Take photos!
DO NOT MISSING
There are cables inside. DO NOT damage the cables inside when installing the
screws.
The PDU box
Decrease height of gantry on both sides to keep level. Don't tilt the gantry.
Decrease the height during transportation, to ensure the gantry will not fall down.
Push the dolly handle in red circle. Do not push the cover and parts on the gantry.
Ensure the height of door is higher than 2.1 m.
Remove the table covers
And you need to remove four screws(maybe the cover will be too close to
unscrew,so you need to remove the buttom covers of the table )
You also can use another way
Loosen the two screws on the side of the iron block and use a groud cattle and lift
the table
When moving the patient bed, it may remove the patient bed cover if using long
dolly. And need to protect components and circuit boards inside the patient bed.
See the picture package.
And then lift the table with a forklift