Material Inspection Request - MIR ‫طلب إستالم مواد‬

MIR Ser No. ‫التسلسل‬


‫ي‬ ‫ الرقم‬: WQIP-D3-MIR-MEC-0005,V0 Date ‫ التاري خ‬: 7/1/2023
Cluster ‫ القطاع‬: West south Dammam
‫ اسم ر‬:
Project Title ‫المشوع‬ Dammam Water Improvement Project- South Strategic Network and Reserviors. Project 3
Consultant ‫ اإلستشاري‬: ILF Consulting Engineers
Contractor ‫ المقاول‬: Al Yamama Company
Part A: By the Contractor: ‫ يتم إستكماله من خالل المقاول‬: )‫الجزء (أ‬
Attachments (tick as appropriate) ‫المرفقات‬
Delievery Notes Factory Acceptance Test Certificate Others (state)
‫إذن التوريد‬ ‫شهادة اختبار من المصنع‬ ‫أخرى‬
Independent Laboratory Test Certificate Certificate of Origin
‫شهادة إختبار من معمل إختبارات مستقل‬ ‫شهادة المنشأ‬
Discipline: Civil Architectural Mechanical Electrical Other (state)
‫التصنيف‬ ‫إنشائ‬
‫ي‬ ‫معماري‬ ‫ميكانيكا‬ ‫كهرباء‬ ‫أخري‬
Material Description Ductile Iron pipe DN 1000 and its Gaskets ‫وصف المواد‬
MAT Form No. : WQIP-D3-ILF-T-022 V2 : ‫رقم طلب اإلعتماد‬
Submittal Approval Date : 12/11/2022 : ‫تاري خ إعتماد الطلب‬
Manufacturer / Suppliers : Saudi Arabia Ductile Iron Pipe Co. (SADIP) : ‫المصنع‬/‫المورد‬
Origin : Saudi Arabia : ‫بلد المنشأ‬
Model No. : DI Pipe C25 : ‫رقم الموديل‬
Serial No. : 22W38,22W39,22W49,22W50 : ‫التسلسل للعنارص الموردة‬
‫ي‬ ‫الرقم‬
B.O.Q. Item : 3.1.3 : ‫رقم البند يف جدول الكميات‬
Quantity : 1104 m : ‫الكمية‬
We certify that the material mentioned above is in accordance with the Contract Specification and Approved Materials.
ً
‫نشهد بأن المواد المذكورة أعاله و فقا لمواصفات العقد و المواد المعتمدة‬
Name ‫ اإلسم‬:Amir Mohamed Signature ‫ التوقيع‬: Position ‫ الوظيفة‬: QC Engineer Date: 07/01/20223
Part B: By the Consultant: ‫ يتم إستكماله من خالل اإلستشاري‬:)‫الجزء (ب‬
Supervising Consultant's Inspection Report ‫تقرير معاينة إستشاري ر‬
‫اإلشاف‬
The reference for specifications is Contract Technical Specifications ‫المرجع يف المواصفات هو مواصفات العقد الفنية‬
Item ‫الموضوع‬ Yes ‫ نعم‬/ No ‫ال‬ Remarks ‫مالحظات‬
Physical Damage? ‫أرصار ظاهرة‬
Details Given above are correct? ‫التحقق من صحة البيانات الواردة أعاله‬
Confirm with Approval Submission? ‫مطابق العتماد المواد‬
Accessories / Spareaccording
Storage conditions Parts included?
to ‫ قطع الغيار‬/ ‫الملحقات‬
ً
manufaturer instructions ‫التخزين طبقا لتعليمات المصنع‬
Remarks ‫مالحظات‬

Name: ‫اإلسم‬ Position ‫ الوظيفة‬: Signature :‫التوقيع‬ Date: ‫التاري خ‬


Supervising Consultant Comments and Approval: ‫مالحظات واعتماد استشاري ر‬
:‫اإلشاف‬

Approved Approved with Comments Comply Comments and Resubmit Rejected


‫يعتمد‬ ‫يعتمد بمالحظات‬ ‫معالجة المالحظات و إعادة التقديم‬ ‫مرفوض‬
Name ‫ اإلسم‬: Position ‫ الوظيفة‬: RE ‫المهندس المقيم‬ Signature ‫ التوقيع‬: Date ‫ التاري خ‬:
Acceptance does not relieve the contractor from his responsibility and liability concerning compliance with the contract requirement.
‫إن هذه الم وافقة ال ت عف ي الم ق اول من مس ؤول ي ات ه ت ج اه م ط اب ق ة م تط ل ب ات ال ع ق د‬

All dates to be entered in format: dd/mm/yyyy


WQIP-D3-MIR-MEC-000XX.xlsx 1 of 1
Sold-to pt Sold-to party Created on Ref.doc. Item RefItm Lot# Batch/Heat Delivery Dlv.qty Description SU Name of the ship-to party
30084 AL YAMAMA COMPANY 06.11.2022 11202511 30 30 8812053230 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 21.11.2022 11202511 30 30 8812053259 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 22.11.2022 11202511 30 30 8812053264 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 30.11.2022 11202511 30 30 8812053323 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 01.12.2022 11202511 30 30 8812053326 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 01.12.2022 11202511 30 30 8812053327 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 01.12.2022 11202511 30 30 8812053328 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 01.12.2022 11202511 30 30 8812053331 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 13.12.2022 11202511 30 30 8812053397 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 14.12.2022 11202511 30 30 8812053401 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 14.12.2022 11202511 30 30 22W38, 8812053402 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
22W39
30084 AL YAMAMA COMPANY 14.12.2022 11202511 30 30 1 8812053403 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
22W49
30084 AL YAMAMA COMPANY 14.12.2022 11202511 30 30 22W50 8812053404 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 14.12.2022 11202511 30 30 8812053405 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 15.12.2022 11202511 30 30 8812053414 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 20.12.2022 11202511 30 30 8812053442 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 20.12.2022 11202511 30 30 8812053443 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 27.12.2022 11202511 30 30 8812053484 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 27.12.2022 11202511 30 30 8812053491 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 28.12.2022 11202511 30 30 8812053497 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 28.12.2022 11202511 30 30 8812053502 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 28.12.2022 11202511 30 30 8812053503 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 28.12.2022 11202511 30 30 8812053511 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
Delivery Notes
packing list
Packing list
Sold-to pt Sold-to party Created on Ref.doc. Item RefItm Delivery Dlv.qty Description SU Name of the ship-to party
30084 AL YAMAMA COMPANY 06.11.2022 11202511 30 30 8812053230 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 21.11.2022 11202511 30 30 8812053259 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 22.11.2022 11202511 30 30 8812053264 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 30.11.2022 11202511 30 30 8812053323 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 01.12.2022 11202511 30 30 8812053326 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 01.12.2022 11202511 30 30 8812053327 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 01.12.2022 11202511 30 30 8812053328 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 01.12.2022 11202511 30 30 8812053331 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 13.12.2022 11202511 30 30 8812053397 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 14.12.2022 11202511 30 30 8812053401 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 14.12.2022 11202511 30 30 8812053402 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 14.12.2022 11202511 30 30 8812053403 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 14.12.2022 11202511 30 30 8812053404 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 14.12.2022 11202511 30 30 8812053405 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 15.12.2022 11202511 30 30 8812053414 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 20.12.2022 11202511 30 30 8812053442 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 20.12.2022 11202511 30 30 8812053443 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 27.12.2022 11202511 30 30 8812053484 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 27.12.2022 11202511 30 30 8812053491 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 28.12.2022 11202511 30 30 8812053497 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 28.12.2022 11202511 30 30 8812053502 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 28.12.2022 11202511 30 30 8812053503 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
30084 AL YAMAMA COMPANY 28.12.2022 11202511 30 30 8812053511 48 D.I.PIPE STD.C25 (L=6M) DN1000 ZBCM M NWC-Dammam Strategic Water Networks
INSPECTION RELEASE
CERTIFICATE
Third Party Inspection Report
SGS Inspection Services Saudi Arabia Ltd.
Jubail Industrial City- Support Industries District
Kingdom of Saudi Arabia.
Tel : +966 13 340 0044 ext 6003, 6004

Report No: - SGS/JUB/M-23/010

INSPECTION RELEASE CERTIFICATE

Certificate Issued By: SGS Inspection Services S.A. Ltd. Certificate


SGS-JUB-M-23-010-IRC-01
P.O. Box-725, Al Jubail, KSA No:
Customer
Ref.:
11202511
SGS WO.: 50027603
Date: 01’Jan 2023

Project Name : NWC-Dammam Strategic Water Works.


Client Name/P.O. No : Al-Yamama Company /11202511
Vendor : Saudi Arabian Ductile Iron Pipe Co. Ltd. (SADIP)

This is to Certify that the items listed below have been released for shipment

NOTE: This Certificate does not relieve the Seller / Manufacturer/ fabricator of their contractual responsibilities with
regard the quality of structural items delivered. The items shall be fit for the use and purpose intended.

PIPES

Recommended By:

__________________
Name: Binu Thankachan
Title: Quality Inspector

Note: This report is issued by the Company under its General Conditions for Inspection and Testing Services (copy available upon
request). The issuance of this report does not exonerate buyers or sellers from exercising all their rights and discharging all their
liabilities under the Contract of Sale. Stipulations to the contrary are not binding on the Company. The Company’s responsibility
under this report is limited to proven negligence and will in no case be more than ten times the amount of the fees or commission.
Except by special arrangement, samples, if drawn, will not be retained by the Company for more than three months.

© SGS Société Générale de Surveillance SA – 2021 – All rights reserved - SGS is a registered trademark of SGS
Société Générale de Surveillance SA
Page 1 of 1
INSPECTION REPORT
Inspection Report No.:S SGS-JUB-M-23-010
SGS Inspection Services Saudi Arabia Ltd.
SGS Job No.: 50027601
P.O. Box 725, Jubail - 31951
Date: 01/01/2023
Kingdom of Saudi Arabia
Tel: +966 13 340 0044 Fax: +966 13 342 0212

Client/Project: NWC-Dammam Strategic Water Works.


Customer 11202511
Manufacturer Order
Ref.:
Customer/Contractor: Al-Yamama Company
Saudi Arabian Ductile Iron
Manufacturer:
Pipe Co. Ltd. (SADIP)
Address: Dammam Country Dammam 2nd industrial City,
KSA

Place of Inspection: Saudi Arabian Ductile


Executing SGS data: SGS – Jubail
Iron Pipe Co. Ltd.
SGS office: SGS Inspection Services Saudi Arabia Ltd. Dammam 2nd Indtl. City
,KSA

Inspection Details:

Inspection Date: • 01/Jan/2023

Witness, In-Process and Final Inspection for the production of Ductile Iron
Pipes DN 1000 C25 ZBCM. as per the ITP for the listed Quantity in section 1
Inspection scope: -Material/Equipment detailed.

Items:
Personnel on Site: • Binu Thankachan - Inspector- SGS
• Mr. Abdullah Abdulaziz Abu Madayni – QA/QC Manager – SADIP
• Mr. Noor Mohammed Abdul Rauf - Quality Control Crew Leader - SADIP

Inspection result: Satisfactory


During inspection visit at Saudi Arabian Ductile Iron Pipe Co. Ltd. (SADIP) the
following activity have been covered as per the approved ITP for Infrashore
PO.Order No. 1202511.

Visual,Dimension,Wall thickness,Straightness,Ovality inspection was carried out


as per the ITP percentage coverage requirements and found meeting within the
tolerance specified as per the BSEN 545, ISO 2531 and Project specification and
found satisfactory.
Remarks:
Randomly witnessed the perodic mechanical testing conducted by the
manufacturer, reviewed the mechanical test (Tensil,Elongation and Hardness)
reports and found them meeting within the reuirments of BSEN 545, ISO 2531,
Project specification and found satisfactory.

Randomly verified the surface cleanleness and appearnces prior to application of


the Zinc, Bitumin coating and internal mortor lining as per the ITP requirements
and found satisfactory.

© SGS Société Générale de Surveillance SA – 2021 – All rights reserved - SGS is a registered trademark
of SGS Société Générale de Surveillance SA
Page 1 of 7
INSPECTION REPORT
Inspection Report No.:S SGS-JUB-M-23-010
SGS Inspection Services Saudi Arabia Ltd.
SGS Job No.: 50027601
P.O. Box 725, Jubail - 31951
Date: 01/01/2023
Kingdom of Saudi Arabia
Tel: +966 13 340 0044 Fax: +966 13 342 0212

Randomly inspected the Bitumen coating visual inspection, coating thickness,


appearances, hardness, Adhesion testing, curing, cement lining thickness,
mortor lining visual appearances etc., the results are satisfied with the ITP and
PO requirements.

Reviewed Hydrostatic Test reports as per BSEN 545, ISO 2531,Project


specification and found to be satisfactory.

The test results (Final Dimension, Mechanical testing, Pressure, Zinc coating,
Bitumen coating, internal cement mortor lining,Bore Dia after lining are in
compliance as per standards to which the materials have been manufactured.

Inspector: Binu Thankachan Date: 01.01.2023


1. Material/Equipment detailed
Goods presented for inspection:

PIPE

AS PER ITP
0020 Dimensional

Visual
External dia
Wall Thickness
Straightness Satisfactory
Length
Ovality

© SGS Société Générale de Surveillance SA – 2021 – All rights reserved - SGS is a registered trademark
of SGS Société Générale de Surveillance SA
Page 2 of 7
INSPECTION REPORT
Inspection Report No.:S SGS-JUB-M-23-010
SGS Inspection Services Saudi Arabia Ltd.
SGS Job No.: 50027601
P.O. Box 725, Jubail - 31951
Date: 01/01/2023
Kingdom of Saudi Arabia
Tel: +966 13 340 0044 Fax: +966 13 342 0212

0030 Mechanical Tests (Witness of Mechanical test during Process)

Tensile Strength
Elongation Satisfactory
Brinell Hardness

Hydrostatic Pressure Test Reviewed Documents


Zinc Aluminum Alloy
Zinc Mass check
Apprearance
Bitumen coating Thickness Satisfactory
Marking

Final Inspection & Testing / Documentation Reviews:


- Reviewed the spectrometer chemical analysis reports of all the
Production batches found satisfactory.

- Witness was carried out during process Pipe dimension checked


of offered pipe and verified the external diameter (DE), Pipe wall
thickness (e), Length, straightness & out of roundness/ Ovality,
found within the acceptable limits and meeting the standard
Requirements as per BS EN 545:2006

- Witness was carried quantity during thickness check of inside


Satisfactory
cement (SRC) mortar lining, outside Bitumen coating
thickness & Internal surface of socket coated with a final
finishing layer of Coating, found acceptable as
per applicable requirements BS EN 545:2006

- Witness was during internal bore diameter checking for


pipes, found acceptable as per applicable
requirements of specification EN 545:2006
- The pipe was visually inspected for lining appearance, crack width, radial
displacement, bubbles and cavities – all pipes cement mortar lining were
found satisfactory

Calibration List of equipment’s:

- Calibration of Test and measuring instruments were verified, found to be Satisfactory


current and acceptable.

Conclusion:
The Above-mentioned pipes is inspected as per BSEN 545, ISO 2531, Project
specification and found to be satisfactory.
inspection was carried out as per ITP and SGS scope of inspection found confirming
to the applicable specification and Purchase order requirements.

© SGS Société Générale de Surveillance SA – 2021 – All rights reserved - SGS is a registered trademark
of SGS Société Générale de Surveillance SA
Page 3 of 7
INSPECTION REPORT
Inspection Report No.:S SGS-JUB-M-23-010
SGS Inspection Services Saudi Arabia Ltd.
SGS Job No.: 50027601
P.O. Box 725, Jubail - 31951
Date: 01/01/2023
Kingdom of Saudi Arabia
Tel: +966 13 340 0044 Fax: +966 13 342 0212

Supplier Certificates review and found satisfactory Satisfactory

2. Used documents & standards


The following documents were considered during inspection:

• ITP
• ISO 2531
• BS EN 545.
• ISO 4179,2531
• Manufacturer pipe system Catalog

3. Status of equipment / tool calibration


The following test equipment was used and verified with valid calibration:
Testing equipment Calibration status
Measuring tape Calibrated
Ultrasonic Thickness Gauge Calibrated
Holiday Meter (Elcometer) Calibrated
Circumeter Calibrated
Yield and Tensile Machine Calibrated
Hardness tester Calibrated
Coating Thickness Gauge Calibrated
4. Inspection / test required
The following scope of inspection was requested by the client:

• As mentioned in para-Inspection Scope

5. Activities performed
The following inspection activities were performed during inspection with following result:
As Mentioned in para-1

6. Documentation review
The following documents were reviewed during inspection:
• ITP-
• Mechanical test reports .
• Hydrotest Reports
• Coating and Lining Reports.
• Zinc/Zinc- coating Mass Report.
• Dimensional Reports

7. Deviations / Non-Conformities
The following non-conformance/deviation was found during inspection:
- None

© SGS Société Générale de Surveillance SA – 2021 – All rights reserved - SGS is a registered trademark
of SGS Société Générale de Surveillance SA
Page 4 of 7
INSPECTION REPORT
Inspection Report No.:S SGS-JUB-M-23-010
SGS Inspection Services Saudi Arabia Ltd.
SGS Job No.: 50027601
P.O. Box 725, Jubail - 31951
Date: 01/01/2023
Kingdom of Saudi Arabia
Tel: +966 13 340 0044 Fax: +966 13 342 0212

8. Conclusion

The test results (Final Dimension, Mechanical testing, Pressure testing,Zinc coating, Bitumen coating,
internal cement mortor lining) are in compliance with latest technical standards to which the materials have
been manufactured.

The Pipes and Fittings produced for the Order 11202511 are in accordance with the Manufacturer Catalog
and ISO 2531 requirements.

9. Attachments
• Attachment-01 Inspection Test Reports.
• Attachment-02 Callibration Certificates.
• Attachment-03 Inspection Release Certificate

10. Pictures

CALIBRATION DETAILS OF TESTING


THICKNESS Visual
EQUIPMENTS CEMENT

Dimension Check DFT MARKING

© SGS Société Générale de Surveillance SA – 2021 – All rights reserved - SGS is a registered trademark
of SGS Société Générale de Surveillance SA
Page 5 of 7
INSPECTION REPORT
Inspection Report No.:S SGS-JUB-M-23-010
SGS Inspection Services Saudi Arabia Ltd.
SGS Job No.: 50027601
P.O. Box 725, Jubail - 31951
Date: 01/01/2023
Kingdom of Saudi Arabia
Tel: +966 13 340 0044 Fax: +966 13 342 0212

Straigthness Check ZINC COATING MECHANICAL TEST

DFT Dimension Check DIMENSIONAL CHECK

Marking MECHANICAL TEST Marking

© SGS Société Générale de Surveillance SA – 2021 – All rights reserved - SGS is a registered trademark
of SGS Société Générale de Surveillance SA
Page 6 of 7
INSPECTION REPORT
Inspection Report No.:S SGS-JUB-M-23-010
SGS Inspection Services Saudi Arabia Ltd.
SGS Job No.: 50027601
P.O. Box 725, Jubail - 31951
Date: 01/01/2023
Kingdom of Saudi Arabia
Tel: +966 13 340 0044 Fax: +966 13 342 0212

Thickness Visual MARKING

EXPENDITURE REPORT
VISIT DATE Description TOTAL hours
Witness and Inspection for the production of Ductile Iron
01 Jan 2023 10
Pipes Timing includes travel and reporting

Inspector: Binu Thankachan Date: 01 Jan 2023

End of Report.

“This document is issued by the Company under its General Conditions of Service accessible at http://www.sgs.com/terms_and_conditions.htm. Attention
is drawn to the limitation of liability, indemnification and jurisdiction issues defined therein.

Any holder of this document is advised that information contained hereon reflects the Company’s findings at the time of its intervention only and within the limits of
Client’s instructions, if any. The Company’s sole responsibility is to its client and this document does not exonerate parties to a transaction from exercising all their
rights and obligations under the transaction documents. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful,
and offenders may be prosecuted to the fullest extent of the law.

The issuance of this report does not exonerate the buyers or sellers from exercising all their rights and discharging all their liabilities under the Contract of Sale.
Stipulations to the contrary are not binding on the Company. The Company’s responsibility under this report is limited to proven negligence and will in no case be more
than ten times the amount of the fees or commission. The SGS stamp and signature are for test observation purposes only and is subject to the provisions of the SGS
General Conditions of Services (particularly article 2(d)) available at http://www.sgs.com/terms_and_conditions.htm. The company is neither an insurer nor a
guarantor and disclaims all liabilities in such capacities.”
“In accordance with Client’s instructions, the Company’s involvement has been limited to witnessing/observing a third party’s intervention(s) at the third party’s
laboratory/test house or other facilities and installations used for the intervention(s). The Company’s sole responsibility was to be present at the time of the third
party’s intervention(s) to forward the results, or confirm the occurrence, of the intervention(s). The Company is not responsible for the condition or calibration of
apparatus, instruments and measuring devices used, the analysis methods applied, the qualifications, actions or omissions of the third party’s personnel or the analysis
results.”

© SGS Société Générale de Surveillance SA – 2021 – All rights reserved - SGS is a registered trademark
of SGS Société Générale de Surveillance SA
Page 7 of 7
Factory Test
SAUDI ARABIAN DUCTILE IRON PIPE CO. LTD. Document Ref QF 23

QUALITY CONTROL Date 28-09-2022

DN100-300 : 60Bars C25 - 25Bars


Requirement K9 DN350-600 : 45Bars Requirement C Class C30 : 30 Bars
DN700-1000 : 35Bars C40 : 40Bars

Standard : ISO2531/BSEN545/SASO1020/SASO1019

FINISHING LINE #1 FINISHING LINE #2 FINISHING LINE #3

Size Pressure Duration Size Pressure Duration Size Pressure Duration


Sr# Sr# Sr# Remarks
Class Bar sec Class Bar sec Class Bar sec
1 1000 C25 25 15 OK
2 1000 C25 25 15 OK
3 1000 C25 25 15 OK
4 1000 C25 25 15 OK
5 1000 C25 25 15 OK
6 1000 C25 25 15 OK
7 1000 C25 25 15 OK
8 1000 C25 25 15 OK

Quality Control QA-QC Manager


SAUDI ARABIAN DUCTILE IRON PIPE CO. LTD. Document Ref QF 23

QUALITY CONTROL Date 28-09-2022

DN100-300 : 60Bars C25 - 25Bars


Requirement K9 DN350-600 : 45Bars Requirement C Class C30 : 30 Bars
DN700-1000 : 35Bars C40 : 40Bars

Standard : ISO2531/BSEN545/SASO1020/SASO1019

FINISHING LINE #1 FINISHING LINE #2 FINISHING LINE #3

Size Pressure Duration Size Pressure Duration Size Pressure Duration


Sr# Sr# Sr# Remarks
Class Bar sec Class Bar sec Class Bar sec
1 1000 C25 25 15 OK
2 1000 C25 25 15 OK
3 1000 C25 25 15 OK
4 1000 C25 25 15 OK
5 1000 C25 25 15 OK
6 1000 C25 25 15 OK
7 1000 C25 25 15 OK
8 1000 C25 25 15 OK

Quality Control QA-QC Manager


SAUDI ARABIAN DUCTILE IRON PIPE CO. LTD. Document Ref QF 23

QUALITY CONTROL Date 28-09-2022

DN100-300 : 60Bars C25 - 25Bars


Requirement K9 DN350-600 : 45Bars Requirement C Class C30 : 30 Bars
DN700-1000 : 35Bars C40 : 40Bars

Standard : ISO2531/BSEN545/SASO1020/SASO1019

FINISHING LINE #1 FINISHING LINE #2 FINISHING LINE #3

Size Pressure Duration Size Pressure Duration Size Pressure Duration


Sr# Sr# Sr# Remarks
Class Bar sec Class Bar sec Class Bar sec
1 1000 C25 25 15 OK
2 1000 C25 25 15 OK
3 1000 C25 25 15 OK
4 1000 C25 25 15 OK
5 1000 C25 25 15 OK
6 1000 C25 25 15 OK
7 1000 C25 25 15 OK
8 1000 C25 25 15 OK

Quality Control QA-QC Manager


SAUDI ARABIAN DUCTILE IRON PIPE CO. LTD. Document Ref QF 23

QUALITY CONTROL Date 29-09-2022

DN100-300 : 60Bars C25 - 25Bars


Requirement K9 DN350-600 : 45Bars Requirement C Class C30 : 30 Bars
DN700-1000 : 35Bars C40 : 40Bars

Standard : ISO2531/BSEN545/SASO1020/SASO1019

FINISHING LINE #1 FINISHING LINE #2 FINISHING LINE #3

Size Pressure Duration Size Pressure Duration Size Pressure Duration


Sr# Sr# Sr# Remarks
Class Bar sec Class Bar sec Class Bar sec
1 1000 C25 25 15 OK
2 1000 C25 25 15 OK
3 1000 C25 25 15 OK
4 1000 C25 25 15 OK
5 1000 C25 25 15 OK
6 1000 C25 25 15 OK
7 1000 C25 25 15 OK
8 1000 C25 25 15 OK
9 1000 C25 25 15 OK
10 1000 C25 25 15 OK
11 1000 C25 25 15 OK
12 1000 C25 25 15 OK
13 1000 C25 25 15 OK
14 1000 C25 25 15 OK
15 1000 C25 25 15 OK
16 1000 C25 25 15 OK
17 1000 C25 25 15 OK
18 1000 C25 25 15 OK
19 1000 C25 25 15 OK
20 1000 C25 25 15 OK
21 1000 C25 25 15 OK
22 1000 C25 25 15 OK
23 1000 C25 25 15 OK

Quality Control QA-QC Manager


SAUDI ARABIAN DUCTILE IRON PIPE CO. LTD. Document Ref QF 23

QUALITY CONTROL Date 29-09-2022

DN100-300 : 60Bars C25 - 25Bars


Requirement K9 DN350-600 : 45Bars Requirement C Class C30 : 30 Bars
DN700-1000 : 35Bars C40 : 40Bars

Standard : ISO2531/BSEN545/SASO1020/SASO1019

FINISHING LINE #1 FINISHING LINE #2 FINISHING LINE #3

Size Pressure Duration Size Pressure Duration Size Pressure Duration


Sr# Sr# Sr# Remarks
Class Bar sec Class Bar sec Class Bar sec
24 1000 C25 25 15 OK
25 1000 C25 25 15 OK
26 1000 C25 25 15 OK
27 1000 C25 25 15 OK
28 1000 C25 25 15 OK
29 1000 C25 25 15 OK
30 1000 C25 25 15 OK
31 1000 C25 25 15 OK
32 1000 C25 25 15 OK

Quality Control QA-QC Manager


SAUDI ARABIAN DUCTILE IRON PIPE CO. LTD. Document Ref QF 23

QUALITY CONTROL Date 01-10-2022

DN100-300 : 60Bars C25 - 25Bars


Requirement K9 DN350-600 : 45Bars Requirement C Class C30 : 30 Bars
DN700-1000 : 35Bars C40 : 40Bars

Standard : ISO2531/BSEN545/SASO1020/SASO1019

FINISHING LINE #1 FINISHING LINE #2 FINISHING LINE #3

Size Pressure Duration Size Pressure Duration Size Pressure Duration


Sr# Sr# Sr# Remarks
Class Bar sec Class Bar sec Class Bar sec
1 1000 C25 25 15 OK
2 1000 C25 25 15 OK
3 1000 C25 25 15 OK
4 1000 C25 25 15 OK
5 1000 C25 25 15 OK
6 1000 C25 25 15 OK
7 1000 C25 25 15 OK
8 1000 C25 25 15 OK

Quality Control QA-QC Manager


SAUDI ARABIAN DUCTILE IRON PIPE CO. LTD. Document Ref QF 23

QUALITY CONTROL Date 02-10-2022

DN100-300 : 60Bars C25 - 25Bars


Requirement K9 DN350-600 : 45Bars Requirement C Class C30 : 30 Bars
DN700-1000 : 35Bars C40 : 40Bars

Standard : ISO2531/BSEN545/SASO1020/SASO1019

FINISHING LINE #1 FINISHING LINE #2 FINISHING LINE #3

Size Pressure Duration Size Pressure Duration Size Pressure Duration


Sr# Sr# Sr# Remarks
Class Bar sec Class Bar sec Class Bar sec
1 1000 C25 25 15 OK
2 1000 C25 25 15 OK
3 1000 C25 25 15 OK
4 1000 C25 25 15 OK
5 1000 C25 25 15 OK
6 1000 C25 25 15 OK
7 1000 C25 25 15 OK
8 1000 C25 25 15 OK
9 1000 C25 25 15 OK
10 1000 C25 25 15 OK
11 1000 C25 25 15 OK
12 1000 C25 25 15 OK
13 1000 C25 25 15 OK
14 1000 C25 25 15 OK
15 1000 C25 25 15 OK
16 1000 C25 25 15 OK
17 1000 C25 25 15 OK
18 1000 C25 25 15 OK
19 1000 C25 25 15 OK
20 1000 C25 25 15 OK
21 1000 C25 25 15 OK
22 1000 C25 25 15 OK
23 1000 C25 25 15 OK

Quality Control QA-QC Manager


SAUDI ARABIAN DUCTILE IRON PIPE CO. LTD. Document Ref QF 23

QUALITY CONTROL Date 02-10-2022

DN100-300 : 60Bars C25 - 25Bars


Requirement K9 DN350-600 : 45Bars Requirement C Class C30 : 30 Bars
DN700-1000 : 35Bars C40 : 40Bars

Standard : ISO2531/BSEN545/SASO1020/SASO1019

FINISHING LINE #1 FINISHING LINE #2 FINISHING LINE #3

Size Pressure Duration Size Pressure Duration Size Pressure Duration


Sr# Sr# Sr# Remarks
Class Bar sec Class Bar sec Class Bar sec
24 1000 C25 25 15 OK
25 1000 C25 25 15 OK
26 1000 C25 25 15 OK
27 1000 C25 25 15 OK
28 1000 C25 25 15 OK
29 1000 C25 25 15 OK
30 1000 C25 25 15 OK
31 1000 C25 25 15 OK
32 1000 C25 25 15 OK
33 1000 C25 25 15 OK
34 1000 C25 25 15 OK
35 1000 C25 25 15 OK
36 1000 C25 25 15 OK
37 1000 C25 25 15 OK
38 1000 C25 25 15 OK
39 1000 C25 25 15 OK
40 1000 C25 25 15 OK

Quality Control QA-QC Manager


SAUDI ARABIAN DUCTILE IRON PIPE CO. LTD. Document Ref QF 23

QUALITY CONTROL Date 02-10-2022

DN100-300 : 60Bars C25 - 25Bars


Requirement K9 DN350-600 : 45Bars Requirement C Class C30 : 30 Bars
DN700-1000 : 35Bars C40 : 40Bars

Standard : ISO2531/BSEN545/SASO1020/SASO1019

FINISHING LINE #1 FINISHING LINE #2 FINISHING LINE #3

Size Pressure Duration Size Pressure Duration Size Pressure Duration


Sr# Sr# Sr# Remarks
Class Bar sec Class Bar sec Class Bar sec
1 1000 C25 25 15 OK
2 1000 C25 25 15 OK
3 1000 C25 25 15 OK
4 1000 C25 25 15 OK
5 1000 C25 25 15 OK
6 1000 C25 25 15 OK
7 1000 C25 25 15 OK
8 1000 C25 25 15 OK

Quality Control QA-QC Manager


SAUDI ARABIAN DUCTILE IRON PIPE CO. LTD. Document Ref QF 23

QUALITY CONTROL Date 03-10-2022

DN100-300 : 60Bars C25 - 25Bars


Requirement K9 DN350-600 : 45Bars Requirement C Class C30 : 30 Bars
DN700-1000 : 35Bars C40 : 40Bars

Standard : ISO2531/BSEN545/SASO1020/SASO1019

FINISHING LINE #1 FINISHING LINE #2 FINISHING LINE #3

Size Pressure Duration Size Pressure Duration Size Pressure Duration


Sr# Sr# Sr# Remarks
Class Bar sec Class Bar sec Class Bar sec
1 1000 C25 25 15 OK
2 1000 C25 25 15 OK
3 1000 C25 25 15 OK
4 1000 C25 25 15 OK
5 1000 C25 25 15 OK
6 1000 C25 25 15 OK
7 1000 C25 25 15 OK
8 1000 C25 25 15 OK
9 1000 C25 25 15 OK
10 1000 C25 25 15 OK
11 1000 C25 25 15 OK
12 1000 C25 25 15 OK
13 1000 C25 25 15 OK
14 1000 C25 25 15 OK
15 1000 C25 25 15 OK
16 1000 C25 25 15 OK

Quality Control QA-QC Manager


SAUDI ARABIAN DUCTILE IRON PIPE CO. LTD. Document Ref QF 23

QUALITY CONTROL Date 06-12-2022

DN100-300 : 60Bars C25 - 25Bars


Requirement K9 DN350-600 : 45Bars Requirement C Class C30 : 30 Bars
DN700-1000 : 35Bars C40 : 40Bars

Standard : ISO2531/BSEN545/SASO1020/SASO1019

FINISHING LINE #1 FINISHING LINE #2 FINISHING LINE #3

Size Pressure Duration Size Pressure Duration Size Pressure Duration


Sr# Sr# Sr# Remarks
Class Bar sec Class Bar sec Class Bar sec
1 1000 C25 25 15 OK
2 1000 C25 25 15 OK
3 1000 C25 25 15 OK
4 1000 C25 25 15 OK
5 1000 C25 25 15 OK
6 1000 C25 25 15 OK
7 1000 C25 25 15 OK
8 1000 C25 25 15 OK

Quality Control QA-QC Manager


SAUDI ARABIAN DUCTILE IRON PIPE CO. LTD. Document Ref QF 23

QUALITY CONTROL Date 08-12-2022

DN100-300 : 60Bars C25 - 25Bars


Requirement K9 DN350-600 : 45Bars Requirement C Class C30 : 30 Bars
DN700-1000 : 35Bars C40 : 40Bars

Standard : ISO2531/BSEN545/SASO1020/SASO1019

FINISHING LINE #1 FINISHING LINE #2 FINISHING LINE #3

Size Pressure Duration Size Pressure Duration Size Pressure Duration


Sr# Sr# Sr# Remarks
Class Bar sec Class Bar sec Class Bar sec
1 1000 C25 25 15 OK
2 1000 C25 25 15 OK
3 1000 C25 25 15 OK
4 1000 C25 25 15 OK
5 1000 C25 25 15 OK
6 1000 C25 25 15 OK
7 1000 C25 25 15 OK
8 1000 C25 25 15 OK

Quality Control QA-QC Manager


SAUDI ARABIAN DUCTILE IRON PIPE CO. LTD. Document Ref QF 23

QUALITY CONTROL Date 02-10-2022

DN100-300 : 60Bars C25 - 25Bars


Requirement K9 DN350-600 : 45Bars Requirement C Class C30 : 30 Bars
DN700-1000 : 35Bars C40 : 40Bars

Standard : ISO2531/BSEN545/SASO1020/SASO1019

FINISHING LINE #1 FINISHING LINE #2 FINISHING LINE #3

Size Pressure Duration Size Pressure Duration Size Pressure Duration


Sr# Sr# Sr# Remarks
Class Bar sec Class Bar sec Class Bar sec
1 1000 C25 25 15 OK
2 1000 C25 25 15 OK
3 1000 C25 25 15 OK
4 1000 C25 25 15 OK
5 1000 C25 25 15 OK
6 1000 C25 25 15 OK
7 1000 C25 25 15 OK
8 1000 C25 25 15 OK
9 1000 C25 25 15 OK
10 1000 C25 25 15 OK
11 1000 C25 25 15 OK
12 1000 C25 25 15 OK
13 1000 C25 25 15 OK
14 1000 C25 25 15 OK
15 1000 C25 25 15 OK
16 1000 C25 25 15 OK
17 1000 C25 25 15 OK
18 1000 C25 25 15 OK
19 1000 C25 25 15 OK
20 1000 C25 25 15 OK
21 1000 C25 25 15 OK
22 1000 C25 25 15 OK
23 1000 C25 25 15 OK

Quality Control QA-QC Manager


SAUDI ARABIAN DUCTILE IRON PIPE CO. LTD. Document Ref QF 23

QUALITY CONTROL Date 02-10-2022

DN100-300 : 60Bars C25 - 25Bars


Requirement K9 DN350-600 : 45Bars Requirement C Class C30 : 30 Bars
DN700-1000 : 35Bars C40 : 40Bars

Standard : ISO2531/BSEN545/SASO1020/SASO1019

FINISHING LINE #1 FINISHING LINE #2 FINISHING LINE #3

Size Pressure Duration Size Pressure Duration Size Pressure Duration


Sr# Sr# Sr# Remarks
Class Bar sec Class Bar sec Class Bar sec
24 1000 C25 25 15 OK
25 1000 C25 25 15 OK
26 1000 C25 25 15 OK
27 1000 C25 25 15 OK
28 1000 C25 25 15 OK
29 1000 C25 25 15 OK
30 1000 C25 25 15 OK
31 1000 C25 25 15 OK
32 1000 C25 25 15 OK
33 1000 C25 25 15 OK
34 1000 C25 25 15 OK
35 1000 C25 25 15 OK
36 1000 C25 25 15 OK
37 1000 C25 25 15 OK
38 1000 C25 25 15 OK
39 1000 C25 25 15 OK
40 1000 C25 25 15 OK

Quality Control QA-QC Manager