Arch Girder - Repair Calculation Sheet
Arch Girder - Repair Calculation Sheet
TEAM LEADER:
PREPARED BY:
REV NO.: 04
DATE: 02-2023
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Table of Contents
1. BUILDING DESCRIPTION ....................................................................................... 3
2. DESIGN CRITERIA.................................................................................................... 3
Page 2 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
1. BUILDING DESCRIPTION
2. DESIGN CRITERIA
2.1 APPLICABLE CODES AND STANDARD
The following local Egyptian codes shall be used throughout the design of
the buildings of the project:
- The Egyptian Code for Assessment of Loads on Buildings and Structures,
No. 201-2011.
- The Egyptian Code for Design and Construction of Concrete Structures,
No. 203-2017.
- The Egyptian Code of Practice for Steel Construction and Bridges, no.
205-2004.
- The Egyptian Code for Soil Mechanics, Design and Construction of
Foundation, No. 202-2001.
• Steel Reinforcement
- Normal Mild Steel “R” (st. 24/35)
- Ultimate tensile strength = 3500 kg/cm2
- Yield stress = 2400 kg/cm2
- Minimum percentage of elongation = 20%
- High Tensile Steel “Y” (St.40/60)
- Ultimate tensile strength = 6000 kg/cm2
- Yield stress = 4000 kg/cm2
- Minimum percentage of elongation = 12%
The following minimum concrete cover shall be provided for reinforcement:
- Concrete cast against and permanently exposed to earth = 50 mm
- Concrete exposed to earth or weather = 50 mm
- Concrete not exposed to weather or in contact with ground:
- Beams and Slabs = 25 mm
- walls and columns = 30 mm
• Structural Steel
- Structural steel grade shall be ST 37 and ST 52 according to the Egyptian
Standards ES 260, with the following tensile stresses:
- Allowable tensile stress of steel grade ST 37 = 4.00 ton/cm2
- Allowable tensile stress of steel grade ST 52 =2.00 ton/cm2
- All bolts material shall be steel 52 conforming to Egyptian Standard No.
260
- High strength bolts grade (10.9) or (8.8) can be used.
- Ordinary bolts conform to ST52 can be used.
- Anchor bolts are to conform to Steel 37.
• Prestressing Cables
- Allowable Yield stress of steel grade = 17000 ton/cm2
- Allowable Ultimate stress of steel grade =19000 ton/cm2
Page 4 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
2.3 LOADS
The following loads were considered in the design review process based on
the Design drawings, Code requirements, and assumptions.
Dead loads include weight of the structure itself including weight of all walls,
permanent partitions, floors, roofs and finishes, services, glazing and all other permanent
construction. The basic weights of various materials being considered in the design
review are as follows:
Page 6 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 7 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 8 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
U1 = 1.4 D + 1.6 L
U2 = 1.5 (D + L)
U3= 1.4 D + 1.6 (E+L)
U4 =0.8 (1.4 D + 1.6 L + 1.6 WX)
U5 = 0.8 (1.4 D + 1.6 L - 1.6 WX)
U6 = 0.8 (1.4 D + 1.6 L + 1.6 WY)
U7 = 0.8 (1.4 D + 1.6 L - 1.6 WY)
U8= 1.12 D + α L + 1.0 SX
U9= 1.12 D + α L - 1.0 SX
U10= 1.12 D + α L + 1.0 SY
U11= 1.12 D + α L - 1.0 SY
U12 = 0.9 D
U13 = 0.9 D + 1.6 E
U14 = 0.9 D + 1.3 WX
U15 = 0.9 D - 1.3 WX
U16 = 0.9 D + 1.3 WY
U17 = 0.9 D - 1.3 WY
U18 = 0.9 D + SX
U19 = 0.9 D - SX
U20 = 0.9 D + SY
U21 = 0.9 D - SY
U22 = 0.8 (1.4 D +1.6 L+1.6 T)
U23 = 1.4 D +1.4 T
U24 = 1.4 D +1.6 L + 1.6 K
U25 = Envelope of (U1 TO U23)
Page 9 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
S1 = 1.0 D + 1.0 L
S2 = 1.0 D + 1.0 L + 1.0 WX
S3 = 1.0 D + 1.0 L + 1.0 WY
S4 = 1.0 D + 1.0 L - 1.0 WX
S5 = 1.0 D + 1.0 L - 1.0 WY
S10 = 1.0 D + α L/1.2 + SX/1.4
S11 = 1.0 D+ α L/1.2 + SY/1.4
S12 = 1.0 D+ α L/1.2 - SX/1.4
S13 = 1.0 D + α L/1.2 - SY/1.4
S14 = 0.9 D
S15 = 0.9 D + 1.0 WX
S16 = 0.9 D + 1.0 WY
S17 = 0.9 D - 1.0 WX
S18 = 0.9 D - 1.0 WY
S19 = 0.9 D + SX/1.4
S20 = 0.9 D + SY/1.4
S21 = 0.9 D - SX/1.4
S22 = 0.9 D - SY/1.4
S23 = 1.0 D+1.0 T
S24= 1.0 D+1.0L+1.0 T
S25 = Envelope of (S1 TO S20)
Where:
D= Dead Load
L= Live Load
W= Wind Load
E= Earth Pressure or Liquid Pressure
S= Seismic load
T= Temperature load
K= Dynamic Loads
α= 0.25
- For floor in public assembly
- For live load in excess of (500 kg/m2)
- For garage live loads.
α = 0.5 - for other live loads
Page 10 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
4. DESIGN SOFTWARE
The following software was used in the structural design of this project:
- CSI SAP 2000 V.24.0.0
- Design Spread sheets
- MS Excel
5. METHODOLOGY:
5.2 RESULTS: -
Maximum straining actions for all elements are obtained and used for design.
Page 11 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
6. STRUCTURAL SYSTEM
The structural system is an Arch Girders Reinforced Concrete Frame. The
vertical loads shall be carried out by Pre-Cast Concrete Slab Carried by the Reinforced
Concrete Secondary Arch Girder Carried by Reinforced Concrete Main Arch Girder resisted on a
Reinforced Concrete Columns.
Page 12 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
7. INPUT DATA
LAYOUT
Page 13 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 14 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 15 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 16 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 17 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
3D MODEL
(CSI SAP 2000 V. 24.0.0)
Page 18 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 19 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
2D MODEL
(CSI SAP 2000 V. 24.0.0)
Page 20 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 21 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 22 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 23 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 24 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 25 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 26 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
8. ASSIGNED LOADS
Page 27 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 28 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 29 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 30 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 31 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
9. ANALYSIS RESULTS
REACTIONS
(CSI SAP 2000 V. 24.0.0)
Page 32 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 33 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
STRAINNING ACTION
(CSI SAP 2000 V. 24.0.0)
Page 34 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 35 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
10. DESIGN
Check of Columns
Page 36 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 37 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 38 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 39 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 40 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 41 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 42 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 43 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 44 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 45 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 46 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 47 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 48 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 49 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 50 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 51 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 52 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 53 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 54 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 55 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 56 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 57 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 58 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 59 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 60 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 61 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 62 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 63 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 64 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 65 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 66 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 67 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 68 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 69 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 70 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 71 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 72 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 73 of 74
Calculation Sheet for
SHIBIN EL-KOM SPINNING FACTORY
Page 74 of 74