KEY PLAN

NOTES:

1. BUILDING SHALL BE 3-STAR GSAS


RATED. THE SAME HAS BEEN
CONSIDERED IN DESIGN AND TO
BE FOLLOWED DURING
FCL FCL EXECUTION.

2. LAYOUTS PREPARED ON THE


BASIS OF AS-BUILT REVIT MODEL
RECEIVED; ANY DISCREPANCY
WITH ON-SITE CONDITION TO BE
IMMEDIATELY BROUGHT TO THE
ACCESS CARD NOTICE OF THE CONSULTANT
READER
GLOVE BOX HOLDER
HAND
SANITIZER
3. STRUCTURAL MODIFICATIONS ARE
NURSE CALL
MONITOR
DISPENSER SUBJECT TO APPROVAL FROM THE
STRUCTURAL CONSULTANT.

4. ALL UNUTILIZED CORE CUTOUTS


ARE TO BE APPROPRIATELY

1350
STRUCTURALLY FILLED TO

1200
RECEIVE FINISHES AS PER
WASTE
FINISHING SCHEDULE.
RECEPTACLE,
GENERAL FFL
FFL 5. DO NOT SCALE THE DRAWINGS;
FOLLOW WRITTEN DIMENSIONS IN
MM UNLESS OTHERWISE
MENTIONED. ALL THE LEVELS ARE
TYPICAL NURSE STATION SECTIONAL ELEVATION BB TYPICAL NURSE STATION SECTIONAL ELEVATION CC IN MM UNLESS OTHERWISE
3 4 SPECIFIED
1 : 20 1 : 20

6. EACH DRAWING SHALL BE READ IN


CONJUNCTION WITH ALL OTHER
DRAWINGS & THE GENERAL
STANDARD DETAILS. IN CASE OF
ANY DISCREPANCIES, BRING IT TO
THE KNOWLEDGE OF
ARCHITECT/ENGINEER .

7. DIMENSIONS SHOWN ON THESE


DRAWINGS ARE STRUCTURAL
DIMENSIONS, UNLESS NOTED
OTHERWISE.

8. FOR EXACT LOCATIONS OF


STRUCTURAL ELEMENTS SUCH AS
COLUMNS, BEAMS ETC. REFER TO
STRUCTURAL DRAWINGS.

9. ALL CUTOUTS TO BE
COORDINATED WITH SHOP
DRAWINGS

QEBLA

WASTE
WASTE RECEPTACLE,
RECEPTACLE, BIOHAZARD
GENERAL

SB
R1 DETAILED DESIGN PACKAGE AG DG UK 22.08.2019
FCL
R0 DETAILED DESIGN PACKAGE AG DG UK 11.04.2019

Job Project
No. Revision Drawn Date
Manager Director
GLOVE BOX
HOLDER Drawing Revisions
LEGEND Note: * indicates signatures on original issue of drawing or last revision of drawing

SB
THERMOSTAT GHD Global Pty Ltd
AA
SINGLE SWITCH SOCKET Conditions of Use. This document may only be used by GHD's client (and any other
GLOVE person who GHD has agreed can use this document) for the purpose for which it was
NURSE CALL
BOX DOUBLE SWITCH SOCKET prepared and must not be used by any other person or for any other purpose.
MONITOR BB
HOLDER
INDUSTRIAL SOCKET
CC SPUR SOCKET

WEATHERPROOF SOCKET
1009
NURSE STATION NETWORK POINT
8.0 m² CONSULTANCY ● DESIGN ● PROJECTS
UPS CONNECTED
P O B o x 3 0 9 1 1 7, J U M E I R A H L A K E T O W E R, D U B A I, U A E . T : + 9 7 1 4 4 2 9 8 3 4 5 F : + 9 7 1 4 4 2 9 8 3 4 4
WASTE WASTE SWITCH BOARD SB
RECEPTACLE, RECEPTACLE, ACCESS NCL
NURSE CALL LAMP
GENERAL BIOHAZARD CARD
1200

READER NURSE CALL RESET BUTTON E

NURSE CALL PULL CORD CP

O2 x 1, VAC x 1, MA4 (MEDICAL AIR) x 1, 1


x S2 (POWER POINT- DOUBLE SOCKET
GENERAL SUPPLY), 1 x S2 (POWER POINT-
BHU-01
FFL DOUBLE SOCKET UPS) , 1 NURSE CALL, 1 GHD Level 23 Al Asmakh Tower West Bay
DATA OUTLET, 1 VOICE OUTLET, 1 DIFFUSED
PO Box 14352 Doha, Qatar
LIGHT
TYPICAL NURSE STATION T 974 4428 9444 F 974 4444 6127
O2 x 1, VAC x 1, MA4 (MEDICAL AIR) x 1, 1 E dohmail@ghd.com W www.ghd.com
1 x S2 (POWER POINT- DOUBLE SOCKET
1 : 20 GENERAL SUPPLY), 1 x S2 (POWER POINT-
BHU-02
DOUBLE SOCKET UPS) , 1 NURSE CALL, 1
TYPICAL NURSE STATION SECTIONAL ELEVATION AA DATA OUTLET, 1 VOICE OUTLET Client
2 O2 x 2, VAC x 2, MA4 (MEDICAL AIR) x 2, 2
1 : 20
x S2 (POWER POINT- DOUBLE SOCKET
BHU-03 GENERAL SUPPLY), 2 x S2 (POWER POINT-
DOUBLE SOCKET UPS) , 1 NURSE CALL, 1
Project THE DIABETES HOSPITAL
DATA OUTLET, 1 VOICE OUTLET (LUSAIL)
O2 x 2, VAC x 2, MA4 (MEDICAL AIR) x 2, 2
CEILING Title
x S2 (POWER POINT- DOUBLE SOCKET
SUSPENDENT
GENERAL SUPPLY), 2 x S2 (POWER POINT-
BEAN
DOUBLE SOCKET UPS) , 1 NURSE CALL, 1
PENDANT- 03
DATA OUTLET, 1 VOICE OUTLET TYPICAL NURSE STATION DETAILS
ANAESTHESIA SIDE PENDANT - 2 x 02, 2 x
N20, 2 x MA4, 1 x SA7, 2 x VAC, 1 x AGSS, Scale
5 x S2 (POWER POINT- DOUBLE SOCKET
1: 20 DO NOT SCALE
MULTI- UPS), 1 NURSE CALL, 2 DATA OUTLET, 1 Drawn Designer
AG DG
MOVEMENT VOICE OUTLET
PENDANT SURGICAL SIDE PENDANT - 2 x 02, 2 x N20, Drafting Design
2 x MA4, 1 x SA7, 2 x VAC, 1 x AGSS), 5 x Check Check
S2 (POWER POINT- DOUBLE SOCKET UPS), Approved
1 NURSE CALL, 2 DATA OUTLET, 1 VOICE (Project Director)
OUTLET)
Date
O2 x 2, N2O x 1, MA4 (MEDICAL AIR) x 1,
RETRACTABLE SA7 x 1, VAC x 2, AGSS x 1, 3 x S2 (POWER This Drawing must not be used for Construction unless signed as Approved
PENDANT POINT- DOUBLE SOCKET GENERAL Original Size
(FOR Drawing No.
SUPPLY), 3 x S2 (POWER POINT- DOUBLE
PREOCEDURE SOCKET UPS), 1 NURSE CALL, 2 DATA A0
ROOM) OUTLET, 1 VOICE OUTLET) LD-1009 Rev. R1