Professional Documents
Culture Documents
Chapter 10
Chapter 10
Chapter 10
Engine Propeller
Matching
PROPELLER
HULL
ENGINE
Propeller Load Characteristic
Speed, Vs
Resistance, R
1
HULL
R Ct SVs2
2
Ct : Resistance Coefficient
Thrust, T : sea water density
T = R / (1-t)
S : wetted surface area
(required) T = 0.5 Ct S Vs2 / (1-t) Vs : ship speed
Propeller Load Characteristic
Advance Va = Vs (1-w)
velocity, Va
Thrust, T
(produced) T = kT n2 D4
Propeller Load Characteristic
Va = Vs (1-w)
Thrust, T Thrust, T
(produced) (required)
T = 0.5 Ct S Vs2 / (1-t)
T = kT n2 D4 T = 0.5 Ct S Va2 / (1-t)(1-w)2
KT = (0.5 Ct S / (1-t)(1-w)2D2) (Va/ nD)2
KT = J2 Propeller load characteristic
0, 70
0, 65
0, 60 Kt
0, 55
T = kT n2 D4
10Kq
0, 50
0, 45 E fficiency
0, 40
0, 35
Prop load char. Q = kq n2 D5
0, 30
0, 25
0, 20 Kq
0, 15 Kt
0, 10
0, 05
0, 00
0,00 0,05 0,10 0,15 0,20 0,25 0,30 0,35 0,40 0,45 0,50 0,55 0,60 0,65 0,70 0,75 0,80 0,85 0,90 0,95 1,00
J
n = Va / JD
Propeller Curve
EHP : Effective Horse Power
THP : Thrust Horse Power
DHP : Delivered Horse Power
SHP : Shaft Horse Power
BHP : Brake Horse Power
Vs
T : Thrust
14000
12000
10000
8000
BHP
f{n3}
6000
4000
2000
0
40 50 60 70 80 90 100 110 120 130
N