TPGI Plan

Technical Conditions 1. Approved EPC Contract


Precedent: 2. Project Implementation Plan/Strategy
Technical Advisor Activity Scope of Work Deliverables Prospect TAs

1. Water Infrastructures 1. Prepare site visit assessment documents, if applicable EDCOP


1. Perform site visit to TPGI Branch reveiweing specific activity, if applicable
1.1 Rehabilitation and Expansion of Transmission
and Distribution Lines 2. Review of PEDs from TPGI CEST, INC.
2-3.Detailed Technical Assessment Report on PEDs
1 1.2 Installation of New Water Service Connection 3. Conduct technical assessment and provide recommendations AECOM
and Meter Replacement Program
1.3 Site Development, Pump Houses and Water 9.Review of construction drawings (DED) and deliverables (except for 1.2) 9. In-depth technical assessment report for construction
Tanks provided by contractor and provided recommendations to improve drawings (DED) and deliverables submittals (except for
submittals 1.2)

1. Prepare site visit assessment documents, if applicable Watcon Inc.


1. Perform site visit to TPGI Branch reveiweing specific activity, if applicable
2. Review of PEDs from TPGI Manila Water Infratech Solutions
2-3.Detailed Technical Assessment Report on PEDs
3. Conduct technical assessment and provide recommendations Waymaker Technologies Corporation
4. Formulate BOQ template for said activities 4.Formulation of BOQ template
5. Draft construction methodology for said activity 5. General Construction Methodology Manual
6. Prepare TOR to be provided to contractors 6. Prepare for TOR
1. Water Extraction Project and 7. Review technical qualifications and proposals of contractor 7-8.Technical assessment report including
1 2. Electromechanical Equipment recommendations
8. Provide recommendations for specialty works and EPC terms

9. In-depth technical assessment report for construction


9.Review of construction drawings (DED) and deliverables provided by drawings (DED) and deliverables submittals
contractor and provided recommendations to improve submittals
10. Technical supervision to said activity ensuring adherence to agreed 10. Comprehensive project oversight report for said
plans activity
11. Consolidate all technical specifications to said activity 11. Comprehensive final report incorporating all technical
specification required for operations

1. Perform site visit to TPGI Branch reveiweing specific activity, if applicable 1. Prepare site visit assessment documents, if applicable
2. Review of PEDs from TPGI
2-3.Detailed Technical Assessment Report on PEDs
3. Conduct technical assessment and provide recommendations
4. Formulate BOQ template for said activities 4.Formulation of BOQ template
5. Draft construction methodology for said activity 5. General Construction Methodology Manual
6. Prepare TOR to be provided to contractors 6. Prepare for TOR
7. Review technical qualifications and proposals of contractor 7-8.Technical assessment report including
1 Water Treatment Plant recommendations
8. Provide recommendations for specialty works and EPC terms

9. In-depth technical assessment report for construction


9.Review of construction drawings (DED) and deliverables provided by drawings (DED) and deliverables submittals
contractor and provided recommendations to improve submittals
10. Technical supervision to said activity ensuring adherence to agreed 10. Comprehensive project oversight report for said
plans activity
11. Consolidate all technical specifications to said activity 11. Comprehensive final report incorporating all technical
specification required for operations

1. Perform site visit to TPGI Branch reveiweing specific activity, if applicable 1. Prepare site visit assessment documents, if applicable
2. Review of PEDs from TPGI
2-3.Detailed Technical Assessment Report on PEDs
3. Conduct technical assessment and provide recommendations
4. Formulate BOQ template for said activities 4.Formulation of BOQ template
5. Draft construction methodology for said activity 5. General Construction Methodology Manual
6. Prepare TOR to be provided to contractors 6. Prepare for TOR
7. Review technical qualifications and proposals of contractor 7-8.Technical assessment report including
1 Septage Treatment Plant recommendations
8. Provide recommendations for specialty works and EPC terms

9. In-depth technical assessment report for construction


9.Review of construction drawings (DED) and deliverables provided by drawings (DED) and deliverables submittals
contractor and provided recommendations to improve submittals
10. Technical supervision to said activity ensuring adherence to agreed 10. Comprehensive project oversight report for said
plans activity

11. Consolidate all technical specifications to said activity 11. Comprehensive final report incorporating all technical
specification required for operations