Item NO. ITEM OF WORKS Unt. Qty UNIT COST Total Cost WT % HOURLY Dur.

Unt. Qty UNIT COST Total Cost WT % HOURLY Dur. (dd) WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 5 WEEK 6 WEEK 7 WEEK 8 WEEK 9 WEEK 10WEEK 11WEEK 12WEEK 13WEEK 14WEEK 15WEEK 16WEEK 17WEEK 18WEEK 19WEEK 20WEEK 21WEEK 22WEEK 23WEEK 24WEEK 25WEEK 26WEEK 27WEEK 28WEEK 29WEEK 30WEEK 31WEEK 32WEEK 33WEEK 34WEEK 35WEEK 36WEEK 37WEEK 38WEEK 39WEEK 40WEEK 41WEEKWEEK
42 43
PART I FACILITIES FOR THE ENGINEERS

100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
1
2
3
4
5
6
7
8
9
PART A. OFFICES AND LABORATORY FOR THE ENGINEERS
A.1.1(3) CONSTRUCTION OF FIELD OFFICE FOR THE ENGINEERS L.S. 1.00 96,138.57 96,138.57 1.22% 32.00 4 100%
####
A.1.4(1) PROVISION OF PROGRESS PHOTOGRAPHS EACH 236.00 13.69 3,231.90 0.04% 236 ####
PART II OTHER GENERAL REQUIREMENTS
B.3 PERMITS AND CLEARANCES EACH 1.00 42,425.25 42,425.25 0.54% 6 ####
B.5 PROJECT BILLBOARD/ SIGN BOARD EACH 1.00 4,193.03 4,193.03 0.05% 4.00 1 ####
B.7(2) OCCUPATIONAL SAFETY AND HEALTH PROGRAM L.S. 1.00 125,373.52 125,373.52 1.59% 236 ####
B..9 MOBILIZATION/DEMOBILIZATION L.S. 1.00 69,378.54 69,378.54 0.88% 32.00 12 ####
PART III CIVIL, MECHANICAL, ELECTRICAL, AND SANITARY/ PLUMBING WORKS
PART A. EARTHWORKS
800(1) CLEARING AND GRUBBING SQ.M 154.00 208.07 32,042.68 0.41% 32.00 4 ####
800(3)a INDIVIDUAL REMOVAL OF TREES (UPTO 300MM DIAMETER) EACH 1.00 2,302.34 2,302.34 0.03% 2.00 1 ####
803(1)a STRUCTURE EXCAVATION (COMMON SOIL) CU.M. 185.26 203.68 37,732.41 0.48% 9.26 1 ####
804(1)a EMBANKMENT FROM STRUCTURE EXCAVATION CU.M. 158.03 232.92 36,806.86 0.47% 16.06 2 ####
804(1)b EMBANKMENT FROM BORROW CU.M. 120.10 2,334.07 280,321.89 3.55% 12.21 2 ####
804(4) GRAVEL FILL CU.M. 35.50 2,550.20 90,543.15 1.15% 29.59 4 ####
PART B.PLAIN AND REINFORECED CONCRETE WORKS
900(1)b2 STRUCTURAL CONCRETE FOR FOOTING AND SLAB ON FILL (CLASS A, CU.M. 48.16 9,257.72 445,893.35 5.65% 134.91 9 ####
900(1)b3 STRUCTURAL CONCRETE FOR FOOTING TIE BEAM (CLASS A, 28 DAYS) CU.M. 13.80 9,605.26 132,552.57 1.68% 51.11 7 ####
80%
900(1)b4 STRUCTURAL CONCRETE FOR COLUMN (CLASS A, 28 DAYS) CU.M. 16.67 12,221.02 203,773.26 2.58% 61.76 8 ####
900(1) b5 STRUCTURAL CONCRETE FOR SUSPENDED SLAB (CLASS A, 28 DAYS) CU.M. 22.14 11,418.35 252,778.98 3.21% 81.99 10 ####
900(1)b6 STRUCTURAL CONCRETE FOR GIRDERS AND BEAMS (CLASS A, 28 CU.M. 37.57 12,221.02 459,180.31 5.82% 139.16 11 ####
902(1)a REINFORCING STEEL (DEFORMED), GRADE 40 KGS. 16,298.53 68.18 1,111,181.92 14.09% 113.63 27 ####
903(2) FORMWORKS AND FALSEWORKS SQ.M. 575.95 499.92 287,924.94 3.65% 127.99 21 ####
PART C. FINISHING
C. 1 TERMITE CONTROL WORKS
1000(1) SOIL POISONING L 26.68 396.55 10,578.97 0.13% 4.94 1 ####
C.2 MASONRY WORKS
1046(2)a1 100MM CHB NON LOAD BEARING/LOAD BEARING (INCLUDING SQ.M. 10.57 864.90 9,141.94 0.12% 2.76 10 ####
1046 150mm. CHB NON LOAD BEARING ((INCLUDING REINFORCING STEEL) SQ.M. 234.66 1,263.92 296,593.25 3.76% 73.79 10 ####
C.3 FABRICATED MATERIALS
1010(2)b (0.90 X 2.40m) MAHOGANY PANEL DOOR WITH COMPLETE SQ.M. 10.80 8,380.98 90,514.62 1.15% 30.00 4 ####
1010(1) 50 X 150mm THK. MAHAGONY DOOR JAMB WITH FIXED CLEAR GLASS SET 5.00 1,555.83 7,779.14 0.10% 3.00 1 ####
1010(2)a (0.90 X 2.10m) HOLLOW CORE FLUSH TYPE SWING DOOR WITH SQ.M 1.89 2,668.80 5,044.03 0.06% 5.91 1 ####
1010(1) 50 X 150mm THK. MAHAGONY DOOR JAMB (D-2) SET 1.00 2,239.88 2,239.88 0.03% 3.00 1 ####
1010(2)a (0.80 X 2.10m) HOLLOW CORE FLUSH TYPE SWING DOOR WITH SQ.M 3.36 1,797.45 6,039.43 0.08% 5.91 1 ####
1010(1) 50 X 150mm THK. MAHAGONY DOOR JAMB (D-3) SET 2.00 2,198.21 4,396.43 0.06% 6.00 1 ####
60%
1010(2)a (0.70 X 2.10m) HOLLOW CORE FLUSH TYPE SWING DOOR WITH SQ.M 1.47 3,496.41 5,139.73 0.07% 4.59 1 ####
1010(1) 50 X 150mm THK. MAHAGONY DOOR JAMB (D-4) SET 1.00 2,156.21 2,156.21 0.03% 3.00 1 ####
1010(2)a (0.90 X 2.10m) HOLLOW CORE FLUSH TYPE SWING DOOR WITH SQ.M 1.89 3,195.47 6,039.43 0.08% 5.91 1 ####
1010(1) 50 x 150mm THK. MAHOGANY DOOR JAMB (D-5) SET 1.00 2,239.88 2,239.88 0.03% 3.00 1 ####
1,007.00 (1.80 X 3.0m) ALUMINUM FRAMED SLIDING GLASS DOOR WITH SQ.M 3.78 1,394.88 5,272.66 0.07% 14.54 2 ####
1,007.00 18 X 180MM THK. SLIDING GLASS DOOR JAMB (D-6) LB.FT 1.00 6,218.98 6,218.98 0.08% 3.00 1 ####
1010(2)a (0.60 X 1.20M) BAR DOOR COMPLETE WITH HARDWARE & SQ.M 1.56 2,737.89 4,271.11 0.05% 4.88 1 ####
1010(1) 50 X 100mm HOLLOW CORE FLUSH TYPE DOOR JAMB (BD-1) LB.FT 1.00 1,946.94 1,946.94 0.02% 3.00 1 ####
1005 (6) (3.6X1.7m) STEEL CASEMENT WINDOW 6MM. THK. CLEAR GLASS (W- SQ.M 24.48 4,338.73 106,212.08 1.35% 136.00 17 ####
1009 (1) (1.60X1.70m) 5MM THK. JALOUSIE WINDOWS ON 50X150MM SQ.M. 9.60 6,069.45 58,266.68 0.74% 90.67 12 ####
1009 (1)a (1.90X0.635m) JALOUSIE WINDOWS WITH CLEAR GLASS BLADES ON SQ.M. 1.14 5,771.85 6,597.22 0.08% 4.23 1 ####
1005 (6) (1.7X1.8m) STEEL CASEMENT WINDOW 6MM. THK. CLEAR GLASS (W- SQ.M. 3.06 3,772.56 11,544.03 0.15% 17.00 3 ####
1032 (1)b WHITEBOARD SET 2.00 4,873.75 9,747.50 0.12% 2.00 1 ####
SPL – 6 RAILINGS L.S. 1.00 109,354.22 109,354.22 1.39% 12.00 2 ####
C.4 FINISHING WORKS
1027(1) CEMENT PLASTER FINISH WITH 19MM THICK & 1:3 MORTAR MIXTURE SQ.M. 768.88 233.02 179,166.82 2.27% 107.91 14 ####
1021(1)a CEMENT FLOOR FINISH (PLAIN) SQ.M. 237.88 81.22 19,321.56 0.25% 39.98 5 ####
1003(1)a1 FASCIA BOARD(19mm, Fiber Cement Board) L.S. 28.68 276.75 7,937.21 0.10% 4.38 1 40%
####
1018(1) GLAZED TILES AND TRIMS SQ.M. 36.22 2,027.95 73,444.10 0.93% 26.53 4 ####
1018(2) UNGLAZED TILES/ GRANITE TILES/ SYNTHETIC GRANITE TILES SQ.M. 8.57 5,273.38 45,166.52 0.57% 18.57 3 ####
C. 5 CARPENTRY WORKS
1,003.00 CARPENTRY OF CEILING WITH INSULATION SQ.M. 162.40 0.00 268,168.00 3.40% 130.65 17 ####
C.6 PAINTING WORKS
1032(1)a PAINTING WORKS (MASONRY PAINTING) SQ.M. 1,065.15 328.25 376,662.61 4.78% 507.21 64 ####
1032(1)b PAINTING WORKS (WOOD PAINTING) SQ.M. 61.81 361.24 20,289.89 0.26% 32.70 5 ####
1032(1)c PAINTING WORKS (STEEL) SQ.M. 63.13 0.00 22,804.00 0.29% 31.56 4 ####
C.7 ROOF FRAMING AND ROOFING WORKS
1,014.00 PREPAINTED METAL SHEETS (CORRUGATE, SHORT SPAN/LONG SPAN) SQ.M. 165.00 106.29 112,814.13 1.43% 79.48 10 ####
1047(2)b STRUCTURAL STEEL ROOF TRUSS KGS. 3,780.73 93.28 401,836.19 5.10% 44.48 6 ####
1047(2)c STRUCTURAL STEEL PURLINS KGS. 476.66 106.90 44,464.22 0.56% 5.27 1 ####
1047(6) METAL STRUCTURE ACCESSORIES(STEEL PLATES) KGS. 113.04 75.25 12,083.61 0.15% 8.70 2 ####
1047(7)b METAL STRUCTURE ACCESSORIES(SAGRODS) KGS. 106.18 75.25 7,990.44 0.10% 8.17 2 ####
1047(4) METAL STRUCTURE ACCESSORIES(CROSSBRACING) KGS. 209.15 313.60 15,738.52 0.20% 16.09 3 ####
1047(3)c METAL STRUCTURE ACCESSORIES(TURNBUCKLE) Ea 12.00 190,623.93 3,763.14 0.05% 1.80 1 ####
1047(10) METAL STRUCTURE ACCESSORIES(FIRE ESCAPE) L.S 1.00 294.49 190,623.93 2.42% 100.00 13 ####
20%
1013(2)a1 FABRICATED METAL ROOFING ACCESSORY (RIDGE/HIP ROLLS, Ga. 26) M. 51.20 0.00 15,078.12 0.19% 5.12 1 ####
C.8 PLUMBING/SANITARY WORKS
1001(8)a SEWER LINE WORKS (50MM DIA - 100MM DIA SANITARY PVC PIPE, L.S. 1.00 105,081.56 29,705.63 0.38% 20.00 3 ####
1001(9) STORM DRAINAGE AND DOWNSPOUT L.S. 1.00 169,744.29 105,081.56 1.33% 35.00 5 ####
1002(4) PLUMBING FIXTURES L.S. 1.00 72,099.99 169,744.29 2.15% 130.00 17 ####
1001(11) SEPTIC VAULT ( CONCRETE / CHB) L.S 1.00 1,015.38 72,099.99 0.91% 25.00 4 ####
1001(5)b CATCH BASIN (CHB) EA 3.00 0.00 3,046.13 0.04% 5.00 1 ####
PART D. ELECTRICAL WORKS
1100(1) CONDUIT, BOXES, AND FITTINGS (CONDUIT WORKS/ CONDUIT L.S 1.00 75,311.84 38,008.23 0.48% 30.00 4 ####
1101(3) WIRES AND WIRING DEVICES L.S 1.00 15,744.33 75,311.84 0.96% 60.00 8 ####
1102(1) PANEL BOARD WITH MAIN BREAKER/BRANCHES, 3 WIRES, 1 L.S 1.00 54,479.57 15,744.33 0.20% 20.00 3 ####
1103(1) LIGHTING FIXTURE AND LAMPS L.S 1.00 0.00 54,479.57 0.69% 50.00 7 ####
PART E. MECHANICAL WORKS
1200 (13) a AIR CONDITIONING ( PACKAGE / SPLIT TYPE ACU) L.S 2.00 631,535.52 181,159.98 2.30% 20.00 3 ####
1202(1) AUTOMATIC WATER SPRINKLER SYSEM L.S 1.00 175,345.68 631,535.52 8.01% 80.00 10 ####
1106(1) CCTV SYSTEM L.S 1.00 36,013.15 175,345.68 2.22% 20.00 3 ####
1208(1) FIRE ALARM SYSTEM L.S 1.00 0.00 36,013.15 0.46% 40.00 5 ####
GRAND TOTAL 7,885,738.72 100.00% 0%

Daily Physical Accomplishment


Daily Cumulative Physical Accomplishment
Weekly Physical Accomplishment 0.54% 0.44% 1.44% 0.96% 2.82% 5.08% 4.51% 3.72% 3.39% 4.01% 1.53% 2.05% 1.28% 0.80% 5.47% 6.17% 1.38% 4.85% 5.39% 0.87% 0.90% 2.37% 6.14% 7.24% 4.62% 2.18% 2.64% 4.73% 2.09% 1.69% 0.99% 0.49% 0.49% 0.49% 0.49% 0.49% 0.49% 0.49% 0.49% 0.49% 1.30% 1.84% 0.15%
Weekly Cumulative Physical Accomplishment 0.54% 0.98% 2.42% 3.38% 6.21% 11.29% 15.80% 19.52% 22.91% 26.92% 28.45% 30.51% 31.79% 32.59% 38.06% 44.23% 45.61% 50.46% 55.85% 56.72% 57.62% 59.99% 66.13% 73.37% 77.99% 80.17% 82.81% 87.54% 89.63% 91.32% 92.31% 92.80% 93.29% 93.78% 94.26% 94.75% 95.24% 95.73% 96.22% 96.71% 98.01% 99.85% 100.00%
Weekly Financial Accomplishment 42,425.25 34,689.27 113,914.23 75,613.03 222,754.77 400,846.48 355,601.82 293,532.03 266,976.58 316,497.54 120,816.74 162,039.36 100,835.30 63,179.38 431,436.88 486,531.22 108,668.27 382,797.05 424,659.00 68,924.65 70,958.10 186,710.75 484,105.69 571,248.20 364,232.23 171,899.99 208,234.52 372,949.74 164,537.12 133,313.45 78,191.31 38,581.75 38,581.75 38,581.75 38,581.75 38,581.75 38,581.75 38,581.75 38,581.75 38,581.75 102,830.56 144,989.38 11,563.09
Weekly Cumulative Financial Accomplishment 42,425.25 77,114.52 191,028.75 266,641.78 489,396.55 890,243.03 1,245,844.84 1,539,376.88 1,806,353.46 2,122,851.00 2,243,667.74 2,405,707.09 2,506,542.39 2,569,721.77 3,001,158.65 3,487,689.87 3,596,358.15 3,979,155.19 4,403,814.19 4,472,738.85 4,543,696.95 4,730,407.70 5,214,513.39 5,785,761.59 6,149,993.82 6,321,893.81 6,530,128.34 6,903,078.08 7,067,615.20 7,200,928.64 7,279,119.95 7,317,701.70 7,356,283.45 7,394,865.20 7,433,446.95 7,472,028.70 7,510,610.45 7,549,192.20 7,587,773.95 7,626,355.69 7,729,186.25 7,874,175.63 7,885,738.72