Professional Documents
Culture Documents
House 2: COLUMN (3, B) Offset by 30Mm To Right Side of Grid B
House 2: COLUMN (3, B) Offset by 30Mm To Right Side of Grid B
OFFSET BY
30MM TO RIGHT SIDE
TO OUTDOOR UNIT
OF GRID B
AT TERRACE LVL
BEDROOM 3
4' X 4.3M
13'1" X 14'2"
AC
BATHROOM
1.65 X 3.73M
5'6" X 12'3"
WALK IN
4.2 X 1.7 M
13'11" X 5'6"
+6750
SF FINISH LEVEL LIFT
76 75 74
73
PASSAGE 77
BEDROOM 2 1.5 M
4.2 X 6.0M 5'0" 72
13'11" X 19'8" 78
71
79
70
80
69
81
68
82
67
83
66
84
TO FF 65
TO TERRACE
63 64
BATHROOM
1.80 X 3.6 M
5'11" X 11'11"
BATHROOM BEDROOM 1
1.80 X 3.60M 3.58 X 6M
AC
PROJECT
ELECTRICAL CONSULTANT
HOUSE 2
Ist Floor Avalan`s Building,Behind Bus Stand, Kondotty
Malappuram dist ,Kerala Tel: +91 4832713248
mail@elmeksolutions.com, www.elmeksolutions.com
TITLE
ARCHITECT