Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Struggling with your computer rental system thesis? You're not alone.

Writing a thesis can be a


daunting task, especially when it comes to complex topics like computer rental systems. From
extensive research to organizing your thoughts and findings into a coherent piece, the process can be
overwhelming.

One of the biggest challenges students face when writing a thesis is the sheer amount of time and
effort it requires. Balancing coursework, work commitments, and personal life while dedicating
hours to research and writing can be a Herculean task.

Moreover, delving into the intricacies of a computer rental system thesis demands a deep
understanding of both theoretical concepts and practical applications. From analyzing market trends
to evaluating the effectiveness of different rental models, there's a lot to cover.

That's where ⇒ HelpWriting.net ⇔ comes in. We understand the challenges students face when
tackling complex academic projects like a computer rental system thesis. Our team of experienced
writers specializes in various fields, including computer science and business management.

By ordering from ⇒ HelpWriting.net ⇔, you can:

1. Save Time: Our expert writers will handle the research, writing, and formatting, allowing you
to focus on other important aspects of your academic and personal life.
2. Ensure Quality: With years of experience and advanced degrees in their respective fields, our
writers guarantee top-notch quality and adherence to academic standards.
3. Receive Customized Assistance: Whether you need help with a specific chapter or the entire
thesis, we offer tailored assistance to meet your unique requirements.
4. Meet Deadlines: We understand the importance of timely submissions. Our writers are adept
at working under tight deadlines, ensuring that you never miss a due date.

Don't let the challenges of writing a thesis overwhelm you. Order from ⇒ HelpWriting.net ⇔
today and take the first step towards academic success.
It clarifies the communications between links(nodes) which helps the project to work according to
the design given to it. The main objective was to predict the performance indices. The performance
index with highest value indicates the severity of that particular line outage and also indicates that it
has got maximum chances of making system parameters to operate beyond the operating limits. Not
like Boolean logic and classic logic which assumes that entire fact is either true or false, but fuzzy
logic allows Boolean logic to tackle with vague and imprecise expressions of human understanding.
The main objective of the project is to develop a portal for management of seminars which will he
hosted on our institution server. The use of AC power flows is it gives information of power flows in
terms of MW and MVAR, line over loadings and voltage limit violation with accurate values.
Cascading Style Sheets (CSS) is a style sheet language used for describing the presentation of a
document written in a markup Page 25. People anciently used pen and paper for writing documents.
GIFs Highlight your latest work via email or social media with custom GIFs. We would be glad to
hear to concerns and suggestions and be part of your learning. These indices were calculated for
various test bus systems using the NR method, since the for the contingency ranking, Overall
Performance Index (OPI) is calculated which is the summation of two severity indices namely Active
power performance index and Voltage performance index using Newton-Raphson load flow method.
Name Notation Role Process Transforms incoming data flow to output data flow DataStore
Repositories of data in the system. OUTPUT: User is prompted to view previous seminars. In this
Project, SQL Server 2005 (Express) is used for database operations and integrated with the Microsoft
visual studio 2008.Here SQL Server Management Studio Express is the GUI tool. 4.2 CODING The
goal of the coding phase is to translate the design of the system into code in a given programming
language. Prior to the design of website for management of seminars “System Development Life
Cycle “is analyzed and described. Page 10. Contingency selection or contingency screening is a
process in which probable and potential critical contingencies are identified for which it requires
consideration of each line or generator outage. The BPA provides estimation to calculate the weight
space which are computed by the steepest descent method. My thanks are extended to my colleagues
in power control and drives, who built an academic and friendly research environment that made my
study at NIT, Rourkela most fruitful and enjoyable. The essential software or hardware elements, or
nodes, in the system are represented by the three-dimensional boxes known as nodes. It is well
known that earthquake data are both positive and negative. And the training mode or process is
continued till the error is small, which is the difference between desired and actual output. Using a
descriptive correlational design from August to October 2011, the study will survey first to fourth
year high school students ages 12 to 16 at Ramon Magsaysay National High School about their
video game usage and physiological habits. MTECH THESIS IN COMPUTER SCIENCE We offer
MTech Thesis In CSE: Networks: We provide network related projects for M.Tech students. We
ensure wireless Adhoc network, mobile communication, satellite communication, wireless
communication and vehicular Adhoc networks are play a vital role in network domain. Aggregation
means accumulation of the subsequent of all rules. Step 8: Computation of overall performance index
is done by adding PIP and PIV for each line outage of the system. After obtaining the performance
indices, the contingency ranking is done with the overall performance index which is the summation
of these two performance indices. Based on architecture, activation functions and learning process
and training process, there are various neural network topologies. In these last few years, a lot of
work has been done in this part which consists of selection of the potential contingencies cases by
using ranking methods or screening methods. The proposed approach for contingency ranking has
considered only PIP and PIV. 3.4 ALGORITHM FOR CONTINGENCY ANALYSIS USING
NEWTON RAPHSON METHOD: The algorithm for contingency analysis using Newton Raphson
load flow solution is as follows: Step 1: Read the given system’s line data and bus data. That is,
program text should be ordered as a particular sequence of statements, and during execution, the
statements are executed in the sequentially order in the program.
Fullscreen Sharing Deliver a distraction-free reading experience with a simple link. This aspect plays
an important role in point of view its operations and planning. Basically at what time, which
department, which speaker, contact details etc. Based on architecture of neural networks, various
types of networks are: 1) Feed Forward Network Topology. 2) Feedback Network topology. 3)
Recurrent network topology. 4) Competitive network topology. This is referred to as self organizing
network as it has the ability to self train and learn the network. The purpose of the deployment
diagram is to design the needed components (software and hardware) of the system. It contains
information about network capabilities, server specifications, hardware requirements, and other
aspects of the planned system’s deployment. The one with higher overall performance index is
ranked first and is arranged in descending order quantifying the severity of contingency. 3.2
ALGORITHM FOR N R METHOD: The procedure for N R load flow method is described as
follows: 1. Nodes and their relationships are depicted in deployment diagrams. The Deployment
Model shows how components will be distributed across the system architecture in detail. UML
Deployment Diagram for Car Rental System A car rental system’s goals are to increase transaction
security, lower costs, make it more accessible to clients, minimize administrative tasks, and improve
data analysis while also producing overall reports for system transparency. The various designs of
this system are shown as following: 1. Upload Read for free FAQ and support Language (EN) Sign
in Skip carousel Carousel Previous Carousel Next What is Scribd. Shows the relationships between
the software and hardware components in the car rental system. A new project is born and will be
maintained in order for the project to survive in the long run. We make you satisfy by giving
discounts either for small business or large business.MSR Computer Solutions provides Best
Computer Rental Services in Hyderabad. And for the administrator, he will be given the universal
power to manage the activities or functions displayed in the portal. 2.4. Environmental
Characteristics: This section of the SRS Document describes the properties of the environment with
which the system will interact. Critical contingencies must be identified firstly and fast to ensure
secure, reliable and continuous operation. They are: (i)Low voltage, below 0.9pu of the voltage (LV),
(ii) Normal voltage, 0.9-1.02pu of the voltage (NV) and (iii) over voltage, above 1.02pu of the
voltage (OV). The documentation of the system is also one of the main activities in the system
development life cycle. The purpose of the conceptual design phase is to build a conceptual model
based upon the previously identified requirements, but closer to the final physical model. The back
propagation algorithm (BPA) is used for the purpose of training of the network. Power system
security assessment helps in monitoring and in giving up to date analysis regarding currents, bus
voltages, power flows, status of circuit breaker, etc. Similarly the membership functions for the
output of these quantities have also been described using Fuzzy set notation and is divided into four
categories for the evaluation of the severity of a post-contingent quantity. For contingency screening
several methods have been developed. The severity of contingencies is found by index calculation
for this process. 3) Contingency evaluation: it is the third step and the most important one as it
involves necessary control action and necessary security actions which are needed in order to
mitigate the effects of most severe contingencies in a power system. It is less costly and risky than
parallel run approach. This process comprises of creating contingencies lists. 2) Contingency
selection: it is the second step and it is the process which involves selection of severe contingencies
from the list that may lead to bus voltage and power limit violations. By varying the values of
learning rate 1 and momentum factor ?, optimization of the network has been done. It not only
provides the system condition, operability and planning but also prevents failure of operation of
power system during any failure of equipment. Many data mining applications are created for
attaining useful information, features, patterns and structures from data base.
Anciently, there used to be manual systems. There used to be many problems with these systems. The
users had to keep in mind, every bit of a thing. The goal of structured programming is to organize the
control flow in a program. In order to make the contingency analysis easier, it comprises of three
basic steps. Data Flow Diagram: Data Flow diagram is a graphical representation of flow of data
throughout the information system. While, in testing mode the data which has not been used in
training process is used. Add more pieces to the diagram, such as components or artifacts, if needed.
It not only provides the system condition, operability and planning but also prevents failure of
operation of power system during any failure of equipment. Name: Car Rental System Deployment
Diagram Abstract: The car rental system deployment diagram represents the physical structure of the
project. The researchers gathered all the requirements needed by the user. Accordingly, those data
may actually be in uncertain form and corresponding methodologies need to be developed.
OUTPUT: User is prompted to view previous seminars. Check out our Related and Recommended
Articles for more Learning and Information. LOAD BUSES: The magnitude of bus voltage and the
phase angle of the bus voltage are unknown. The most severe contingent is chosen from the
contingency list and the corresponding power flows and line flows are analyzed for the considered
power system. SQL Server Express is a cost free and easy-to-use database product that is based on
SQL Server 2005 technology. And for the administrator, he will be given the universal power to
manage the activities or functions displayed in the portal. 2.4. Environmental Characteristics: This
section of the SRS Document describes the properties of the environment with which the system will
interact. By giving passwords and verification code many software and user identities can be
preserved. There are various activation functions, some of them have been discussed below. It was an
invaluable learning experience for me to be one of his students. It is also not always possible to get
the solutions for these problems by classical methods. Knowledge of human experts forms the base
of the accuracy of fuzzy logic systems (FIS). A message or other sort of communication between
nodes is indicated by a line called a relation or association. The scope of study in the thesis or
research paper is contains the explanation of what information or subject is being analyzed.
Fuzzification interface: here in this process converts crisp inputs values to linguistic values. The
Mamdani method implication is the most commonly used for processing of mapping specific input
variable to specific output variable. 3. Defuzzification: It is here in this process that conversion of
input variable i.e., conditional fuzzy control actions to a crisp values or to the non-fuzzy control
action is done. Each test case is independent from the others: substitutes like method stubs, mock
objects can be used to assist testing a module in isolation. It is known that interval and fuzzy
computations are themselves very complex to handle. In this chapter fuzzy logic system which is
based on certain rules is used for power system contingency ranking, but before that a small
description, overview of fuzzy logic system is mentioned in next Section 4.2. 4.2 FUZZY LOGIC
SYSTEM (FLS): A Fuzzy logic system (FLS) system defines the controlling action of a process by
the use of simple If-Then rules. After processing through all phases of the system development life
cycle, the portal is developed. NR formulation is also required for the system with large angles
across line and with control device which influences reactive and real power.

You might also like