PAMIX SDN BHD

(Company No]261 69 4-H)


A-9,2t*o &
3no Floor, PusatKomersial Kuantan Perdana,
Jalan Tun Ismail,25000 Kuantan, Pahang Darul Makmur.
Tei:09-517281A / / / 2820
2813 2819 Fax:09-517'2821

Our Reference : PSB/KN/OCTl20l001 Date : 27'r' October 2A20

En. Syamsul Bin Sanr"rsi


No. 10, Lorong lM 519
Indera Mahkota 5
25200, Kuantan
Pahang Darul Makmur

Sir.

BTINGALOW LOT PROJECT IN INDERA MAHKOTA 5

- Concrete Crack

Refer to the above matter, rve acknowledged your complaint regarding first floor's corcrete slab crack and
have attended the cornplaint on last Saturday. 24't' Octob er 2A20.

Based on our site investigation, cracks formation is identified as shrinkage crack and not structural

crack. Normally. shrinkage crack happens due to hot weather, concrete compaction. non-curing and relative
humidity ol ambient air.

Following that. rebound hammer test has been conducted accordinglv to obtain in-situ concrete
compressive strength. Enclosed together with this letter is our rebound hammer test report of 19 days age

concrete arrd tlris report reflected our concrete has passed its Grade 30 compressive strength of aged 28 days.

Hence. structural rvise, the slab structure is safe and sound. Our responsibiliq, as ready mix concrete

supplier is to ensure our concrete strength complied with its specification and any works at site is beyond our
control.

Therefore, our suggestion to avoid this *,ater leaking from happening again is to apply cement
rendering of thickness l0 mm or putting a layer of plastic slreet before installing parquet floor as your
finishing product.

Hence, we hope this matter can be resolved amicabiy and we will strive tu(her to ot'fer our senice and
product to our best ability.

Regards,
PAl[IX

btp

Senior QA/QC Executive


PAMIX SDN. BHD.
FACTUAL TEST REPORT

IEST REPORTNO. PSB/RHT/OCT2O-01 PAGE: 1of 3


1'his report is NOT a Qualitl, Assurance Certificate NOR an Approved Pennit. The CopFight of this Confidenlial TEST REPORT is ox,ned by Parnix Sdn. Bhd.
Ihis TEST REPORT cannot be reproduced, except ir full without the uritlen approval ofPamix Sdn. Bhd. This TEST REPORT shall not be used for publication
rr advertisement bv anv means or fonns rvithout u'ritten permission of Pamix Sdn. Bhd.

1. Date of Reporl 26th October 2020

2. Test Requested Detemination Of Compressive Strength Of Concrete


Using Schmidt Hammer Method

3. Tested For SYAN'ISUL BIN SANUSI


No 10, Lorong IM 5/9
Indera Mahkota 5
25200 Kuantan
Pahang

4. Project Bungalorv Lot in Indera Mahkota 5

5. Date of Testing 24th October 2020

6. Method of Testing BS EN 12501-2:2001


"Non-destructive Testing - Detemination of Rebound Number"

7. Hammer Tlpe NL 4021Xi001

8. Test Witnessed By a) En Syamsul Bin Sanusi


b) Nur Faqihah

9. Results Please refer to the following page

for and on behalf of PAMIX SDN. BIID.

Senior QAiQC Executive


EST REPORT NO. PSB/RIIT/OCT2O-O1A

ithout u'ritten pennission of Pamix Sdn. Bhd.

Client C/S Syamsul Bin Sanusi Date Tcst 24th October 2020
Project Lot Banglo, No. 10, Lorong IN4 l5/9 Tcsted B,v N4ohd Faisal Bin Ali
Structure Floor Slab
I st Grade 30N
Hammer Type NL 402rX/001

TEST DATE TEST REBOUND HA}IIIERVALL;E READING OBTAINED WITII THE CONCRETE HAM}IER RN AFTER
LOCATION
NO. CAST POST. I ) ., I 5 6 7 8 9 l0 1l 12 AVG CORRECTION
1 33.3 .)J.-l J J 35.3 -) l_ l ll_1 35.3 37.3 J I.J 3 1.3 33.3 J I.J 33.1
2
Floor Slab 05'r 0 20
35.3 31.3 3 35.3 11_ I 3 7.3 11- 1 35.3 33.3 i-1--1 35.3 33.3 34.0
I st
3 vt 29.3 JJ,.] J JJ.J JJ.J JI..J 3 1.3 29.3 31.3 31.3 29.3 J I.J 31.3
I 13.3 JJ.J -1 3 35 "3 JJ.J 35.3 J -J.-1 31.3 33.3 33.3 J -1. -l 33.3 JJ.J

Remarks PositionoftestH=00; VJ :-900; \, 1 :+900

l-t Sl * Average Rebound


LOCATION
NO. Reading

1 JJ- I

2 1 st Floor 34.0
3 Slab J I -J
4 JJ.J

Remarks :
a) * Repoted to nearest whole number.
b) *+ Reported to nealest 0.5N,'rnm2, base on local correlation rvith cube samples.

Result : Pass
Conclusion : Based on the results, rebound hammer test result cornplied to Grade 30 compressive strength
\\,ithout s,ritten pennission of Palrix Sdn. Bhd.

Client : C/S S.vamsul Bin Sanusi Date Test : 21rh October 2020
Project : Lot Banglo, No. 10, Lorong I\4 15/9 Tested By : Mohd Faisal Bin Ali
Structure : 1st Floor Beam Crade : 30N
Hammer Type : NL 4021X/001

TEST DATE TEST REBOUND I{A}INTER VALUE READING OBTAINED WITH THE CONCRETE HANTI\,IER RN AI-TER
LOCATION
NO. CAST POST. 1 7 J 4 5 6 7 8 9 10 l1 t2 AVG CORRECTION
1 H 36 31 1L )/ 31 ).!. i0 32 30 t1- 36 il s:. /
2 lst Floor Beam 05i I 0/20 H 30 32 30 30 32 30 3l 30 1l 1 -1, 30 30 30.8 30.8
3 H 30 )1, 38 30 38 32 38 30 30 5L 32 30 )/- / 32"1

Remarks PositionoftestH:00; \,1 :-900; Vl :+900

lESl * Average Rebound


LOCATION
NO. Reading

1 -tz. /
1st Floor
2 30.8
Beam
J 32.7

Remarks :

a) + Reponed to nearest whole number.

b) +* Reporled to nearest 0.5Nimm:. base on local correlation u,ith cube samples.

Result : Pass
Conclusion : Based on the results, rebound hammer test result complied to Grade 30 compressive strength