PROCEDURE Revision : 0
Page : 1/2
1. PURPOSE
This procedure covers incoming material control and testing activities for the production.
3. REFERENCE CODE
Quality Manual
4. METHOD
4.1. General
• The necessary controls and tests are carried out as specified in the control plan to verify that
the conditions specified for the product have been met.
• Controls and tests to verify that the requirements for each product are fulfilled are detailed in
the control plans.
• It is a principle that the incoming materials are not used or not processed until they are
checked.
• Incoming material control is the first operation of the control plan and is performed as
specified in the project control plan and related specifications.
• The technical acceptance of the materials to be used in production shall be performed by the
authorized quality control personnel.
• The incoming materials are taken to the defined control area in the factory.
• If the materials have not been checked yet, the Control Waiting Label is attach on the
materials.
• The Incoming Material Quality Control Label is attached, indicating that the materials are
checked and the result of the inspection (acceptance, rejection, conditional acceptance).
Acceptance of the material: The material meets all of the required requirements; is checked out.
INCOMING MATERIAL CONTROL Date : 15.05.2018
PROCEDURE Revision : 0
Page : 2/2
Rejection of material: The material does not meet the requirements; the supplier is informed and
materials are returned to the supplier.