PT PLN (Persero)
PLN PUSAT MANAJEMEN PROYEK
PLN
‘COMMENT
No.
1
Review by:
Approved by
CCROUT DATE
REVIEW FOR APPROVAL OF DRAWINGS / DOCUMENTS 2019
DRAWINGS / DOCUMENT NUMBER
DRAWINGS / DOCUMENTS TITLE
REV. CONTRACTOR REV. STATUS
FIELD INSPECTION AND TEST PLAN FOR INSTRUMENT |
IKCPO-YYB-G-05-067 0 A CLOCK SYSTEM
KALSELTENG 2 CFSPP (2X100 MW)
~ ~~ COMMENT
PLN COMMENTS CONTRACTOR RESPONSE
aus : - No.
Approved
Date: 2 San: [yo
-\- 2019 Us
mq Date 27 hy Ee ae /___| Response by: Date: Sign:CONTRACTOR DOCUMENT REVIEW a“
= | wech
toe [LJ pare 5 [eect
|__|) commana 2 fisc —
AC] approveo ‘SUPORT
8] AppRovED AS NOTE CONTRACTOR
CD) Nor approved RECORD
1] INFORMATION 2 | workine pocumeNT
Muneorracren PROD 2
BY DATE s
Los [DATE
out | comma no.
T
0 | pec2720%6 issued For Approval (GAGE CONSORTIUM PUSMANPRO
DESCRIPTION PREPARED & CHECKED APPROVED,
PT. PLN ( PERSERO )
Jl. Trunojoyo Blok M 1/135. Kebayoran Banu Jakarta 12610
Phone : 462.21-7261875 7261122 7262234 Fax : +62-21-7221830
e-mail : webmaster@pln.coid
Contract Agreement No. 1594 PJ/DAN.02.01/D1R/2016
PROUECT
KALSELTENG 2 CFSPP(2x100MW)
PT. PLN ( PERSERO ) PUSAT MANAJEMEN PROYEK
oj 4/4) 8] 8] -[o[o/- | -]o/5/-|y¥]¥[B]- [ole [7] - [o]6|- folo
PIN
DOC.No.
‘CONTRACTOR
‘CONSORTIUM OF
PT TRUBA JAYA ENGINEERING- HYUNDAI ENGINEERING CO. LTO.~ ITOCHU CORPORATION
Trubi AHyunoal FTOGWS
‘SUB CONT WENDOR REV,
DOC. NO.
prepared [__OATE | nme
ceecKe0 8Y | peozr 2018
pare _ FIELD INSPECTION AND TEST PLANS FOR INSTRUMENT CLOCK |
anac
= SYSTEM
consormum | f=
= —_L |
APPROVED DATE CONTRACTOR DOCUMENT NUMBER REV.
SEEROTED.—}— OME ij. |
PLN IKCPO-YYB-G-05-067 0PROVEC
KALSELTENG 2 CFSPP(2x100MW)
CONTRACTOR DOG. NO.
IKCPO-YYB-G-05-067
CONTRACTOR TITLE
RON
FIELD INSPECTION AND TEST PLANS FOR
INSTRUMENT CLOCK SYSTEM
TABLE OF CONTENT
COVER
TABLE OF CONTENT
INSPECTION AND TEST PLANS FOR CLOCK SYSTEM
ATTACHMENT (Inspection & Test Report Form)
= Clock system
TSSUED DATE
2018
REVISION
°
Page
non- Porn pene) FIELD INSPECTION AND TEST PLANS FOR INSTRUMENT CLOCK eosraay | JFj2F a vunwn) 07%
SYSTEM
laisares? [coast eno vaonecsor ma
[CFS cax300 mW) [Rev Ro @
Tecan aN in P= W = Ws, a Wes = aan
Tonka eH
cre he pet cy
esta cps | parce Cater Been ‘Remark
mm feat pews | SURO] Tapeaan [Emme] SB To,
sae | "se [te cnn | Cerner
PnePanaTion “|
“LA pocument Review
TEC Drawing Tein Saccaion -
aa See Dest Ve 9
td, see won Pres sate ejn le
des, udesond&ingemeted recone | topeat pecan, | wat
accor Jnnss8eerom.o2010I aovebroning, vena] econ
LA.2 Material Receiving Report & Mil / Test 26 ‘Speesfiestion Report 7 .
east coft Venton
als song ne tT
reese an Treated
‘xECUTION
2a clocksysrE
244 Sec nepacton ‘uaanet Comat | yyaye pace Tp ww
“= lhoasst omnozovou| Moma racers | inspection | cae
12016, Approved Oromngy | A9™0¥8S Drawing vend] PE
24.4.2 Cabletest roe, Mans Tstaion ‘Speccaton ” w | aw
22 setting RealTime cst
2121 by GPSie elewea Nt Osc Cone sane se
Oe Inosseuryoanceouom| ,wrmane momen’. | tepection | See w
"36, proved Drawing! | AHS awe, repo
BL22 Maralyn an ough OS 28S eo | oiten » lw bw
2.3, RealTime Gack
224 wokstion wo fow | ow
232 Daroued onl sem wow tow
eee oa ‘Aopiicable procedure,
ccna hoasor ryt oer spec | rapecon bw
233_hepwnrae cm su gona [PSE rn] Tae” | te “
Proc na ston
234 Toineter 8 ches meter wtw tw
23.5 rooney contol ten » De} wrien (ese) FIELD INSPECTION AND TEST PLANS FOR INSTRUMENT CLOCK enmca| JFGEH auvunond
ev ‘SYSTEM
JRALSELTENG 2 |Conractor Dac. No, IKCPO-Y YEG O-67 [Sub
forse caso 0) [fe °
Ta Ry LT FSR RW = WR aE R= OS
Seve
Tren ce! ction
Testa eosenon ot sopatebooret roc On
"0 eit some Femy | nian] pecen Temas] SP Tomas oma) |"
‘imide | eae | ost
3 [oocumenrarion
{BAA escumins dsr requed a per contract sac
so) manda: ta eet 8 As Bak ring ten el we
acum Cont
“submitted to Company for review & approval JNOISA.PI/DANOZOL/DI) _Appicable procedure, Inspection
Company f mS R/2016, Approved Approved Drawing, vendor | Report, KR | Site
32 loepecion pr Hani Ws TP aay de Drowiy/ Fre Manual | Spectro | Con > twle
‘ve nepecton eet te nr ad sed
3 AE NER or ey deren crac ey coe > tw le
sea aneuretesPROJECT CONTRACTOR DOO. NO,
KALSELTENG 2 CFSPP(2x100MW) IKCPO-YYB-G-05-067
CONTRACTOR | TE ISSUED DATE
Truke FIELD INSPECTION AND TEST PLANS FOR Bec27 2018
abvunoa! INSTRUMENT CLOCK SYSTEM REVISION
°
roGws
ATTACHMENTPLN
KALSELTENG 2 CFSPP (2x10 MW) Tobe /TOCHS
\
Date:
Date: Date:
UPP KALBAGTENG
CLOCK SYSTEM Poe. no Page:
Rev.no
INSTRUMENT
Description: Date Report nos
Location / Area: Other:
Equipment /System no.
Sub System:
orawing No. system
No cueck rrems aco | wo | NA ReMaxs
1 check orientation & position
2, |Check location accordance with approved drawing
3. |Confirm the tag number asper drawings
4 | cheek that presevation are good condition (nodamage)
[confirm the equipmentis fixed tothe support secrely with bolt, ut, plain and
spring washers
Comment a ms —
Nowe: Tick "as applicable, ACC = Acceptable Re} = Rejected NA= Not Applicable
inspected witness Approved
Quality Control / Consortium PT. PLN (PUSMANPRO} PT. PLN (UPP Kalbagteng)