PT PLN (Persero) PLN PUSAT MANAJEMEN PROYEK PLN ‘COMMENT No. 1 Review by: Approved by CCROUT DATE REVIEW FOR APPROVAL OF DRAWINGS / DOCUMENTS 2019 DRAWINGS / DOCUMENT NUMBER DRAWINGS / DOCUMENTS TITLE REV. CONTRACTOR REV. STATUS FIELD INSPECTION AND TEST PLAN FOR INSTRUMENT | IKCPO-YYB-G-05-067 0 A CLOCK SYSTEM KALSELTENG 2 CFSPP (2X100 MW) ~ ~~ COMMENT PLN COMMENTS CONTRACTOR RESPONSE aus : - No. Approved Date: 2 San: [yo -\- 2019 Us mq Date 27 hy Ee ae /___| Response by: Date: Sign: CONTRACTOR DOCUMENT REVIEW a“ = | wech toe [LJ pare 5 [eect |__|) commana 2 fisc — AC] approveo ‘SUPORT 8] AppRovED AS NOTE CONTRACTOR CD) Nor approved RECORD 1] INFORMATION 2 | workine pocumeNT Muneorracren PROD 2 BY DATE s Los [DATE out | comma no. T 0 | pec2720%6 issued For Approval (GAGE CONSORTIUM PUSMANPRO DESCRIPTION PREPARED & CHECKED APPROVED, PT. PLN ( PERSERO ) Jl. Trunojoyo Blok M 1/135. Kebayoran Banu Jakarta 12610 Phone : 462.21-7261875 7261122 7262234 Fax : +62-21-7221830 e-mail : webmaster@pln.coid Contract Agreement No. 1594 PJ/DAN.02.01/D1R/2016 PROUECT KALSELTENG 2 CFSPP(2x100MW) PT. PLN ( PERSERO ) PUSAT MANAJEMEN PROYEK oj 4/4) 8] 8] -[o[o/- | -]o/5/-|y¥]¥[B]- [ole [7] - [o]6|- folo PIN DOC.No. ‘CONTRACTOR ‘CONSORTIUM OF PT TRUBA JAYA ENGINEERING- HYUNDAI ENGINEERING CO. LTO.~ ITOCHU CORPORATION Trubi AHyunoal FTOGWS ‘SUB CONT WENDOR REV, DOC. NO. prepared [__OATE | nme ceecKe0 8Y | peozr 2018 pare _ FIELD INSPECTION AND TEST PLANS FOR INSTRUMENT CLOCK | anac = SYSTEM consormum | f= = —_L | APPROVED DATE CONTRACTOR DOCUMENT NUMBER REV. SEEROTED.—}— OME ij. | PLN IKCPO-YYB-G-05-067 0 PROVEC KALSELTENG 2 CFSPP(2x100MW) CONTRACTOR DOG. NO. IKCPO-YYB-G-05-067 CONTRACTOR TITLE RON FIELD INSPECTION AND TEST PLANS FOR INSTRUMENT CLOCK SYSTEM TABLE OF CONTENT COVER TABLE OF CONTENT INSPECTION AND TEST PLANS FOR CLOCK SYSTEM ATTACHMENT (Inspection & Test Report Form) = Clock system TSSUED DATE 2018 REVISION ° Page non - Porn pene) FIELD INSPECTION AND TEST PLANS FOR INSTRUMENT CLOCK eosraay | JFj2F a vunwn) 07% SYSTEM laisares? [coast eno vaonecsor ma [CFS cax300 mW) [Rev Ro @ Tecan aN in P= W = Ws, a Wes = aan Tonka eH cre he pet cy esta cps | parce Cater Been ‘Remark mm feat pews | SURO] Tapeaan [Emme] SB To, sae | "se [te cnn | Cerner PnePanaTion “| “LA pocument Review TEC Drawing Tein Saccaion - aa See Dest Ve 9 td, see won Pres sate ejn le des, udesond&ingemeted recone | topeat pecan, | wat accor Jnnss8eerom.o2010I aovebroning, vena] econ LA.2 Material Receiving Report & Mil / Test 26 ‘Speesfiestion Report 7 . east coft Venton als song ne tT reese an Treated ‘xECUTION 2a clocksysrE 244 Sec nepacton ‘uaanet Comat | yyaye pace Tp ww “= lhoasst omnozovou| Moma racers | inspection | cae 12016, Approved Oromngy | A9™0¥8S Drawing vend] PE 24.4.2 Cabletest roe, Mans Tstaion ‘Speccaton ” w | aw 22 setting RealTime cst 2121 by GPSie elewea Nt Osc Cone sane se Oe Inosseuryoanceouom| ,wrmane momen’. | tepection | See w "36, proved Drawing! | AHS awe, repo BL22 Maralyn an ough OS 28S eo | oiten » lw bw 2.3, RealTime Gack 224 wokstion wo fow | ow 232 Daroued onl sem wow tow eee oa ‘Aopiicable procedure, ccna hoasor ryt oer spec | rapecon bw 233_hepwnrae cm su gona [PSE rn] Tae” | te “ Proc na ston 234 Toineter 8 ches meter wtw tw 23.5 rooney contol ten » De} w rien (ese) FIELD INSPECTION AND TEST PLANS FOR INSTRUMENT CLOCK enmca| JFGEH auvunond ev ‘SYSTEM JRALSELTENG 2 |Conractor Dac. No, IKCPO-Y YEG O-67 [Sub forse caso 0) [fe ° Ta Ry LT FSR RW = WR aE R= OS Seve Tren ce! ction Testa eosenon ot sopatebooret roc On "0 eit some Femy | nian] pecen Temas] SP Tomas oma) |" ‘imide | eae | ost 3 [oocumenrarion {BAA escumins dsr requed a per contract sac so) manda: ta eet 8 As Bak ring ten el we acum Cont “submitted to Company for review & approval JNOISA.PI/DANOZOL/DI) _Appicable procedure, Inspection Company f mS R/2016, Approved Approved Drawing, vendor | Report, KR | Site 32 loepecion pr Hani Ws TP aay de Drowiy/ Fre Manual | Spectro | Con > twle ‘ve nepecton eet te nr ad sed 3 AE NER or ey deren crac ey coe > tw le sea aneuretes PROJECT CONTRACTOR DOO. NO, KALSELTENG 2 CFSPP(2x100MW) IKCPO-YYB-G-05-067 CONTRACTOR | TE ISSUED DATE Truke FIELD INSPECTION AND TEST PLANS FOR Bec27 2018 abvunoa! INSTRUMENT CLOCK SYSTEM REVISION ° roGws ATTACHMENT PLN KALSELTENG 2 CFSPP (2x10 MW) Tobe /TOCHS \ Date: Date: Date: UPP KALBAGTENG CLOCK SYSTEM Poe. no Page: Rev.no INSTRUMENT Description: Date Report nos Location / Area: Other: Equipment /System no. Sub System: orawing No. system No cueck rrems aco | wo | NA ReMaxs 1 check orientation & position 2, |Check location accordance with approved drawing 3. |Confirm the tag number asper drawings 4 | cheek that presevation are good condition (nodamage) [confirm the equipmentis fixed tothe support secrely with bolt, ut, plain and spring washers Comment a ms — Nowe: Tick "as applicable, ACC = Acceptable Re} = Rejected NA= Not Applicable inspected witness Approved Quality Control / Consortium PT. PLN (PUSMANPRO} PT. PLN (UPP Kalbagteng)

You might also like