Professional Documents
Culture Documents
Documemnt Delivery Billing Scheduline Q
Documemnt Delivery Billing Scheduline Q
A: The header data is stored in Header Tables and the Transactional data is stored in Item
tables. ex: VBAK is header table for the Sales Documents data which stores the Sales
Document number, date created, time of creation, name of the person created the Sales
document and the quotation/inquiry is valid from details.
Q. what is table for item data?
A:
A: VBEP
A:
A:
No Confg. needed but needed setting in master data and are bellow the steps.
1) Material Master purchasing view tick automatic PO check box
6) Use T.Code: ME59 & execute for PR for vendor, you will be able to create
automatic PO.
Note:
If you have more than one vendor then fixes only one vendor in source list.
For Service auto- PO, you need to activate Automatic Purchase order creation for
Service requisitions in ML91. Create info record based on Material Group,For
Automatic PO , info record is mandatory.For more please read note 635511
A: tem Relevant For Delivery Text and value items do not contain schedule lines
and therefore cannot be delivered as such. When the check box Item Relev.For
Dlv is selected, it allows the text and value items to be relevant for delivery. By
making them relevant for delivery, it does not deliver text items from stock but
allows them to copy to the delivery document for informational purposes. Do not
select this check box unless you are configuring an item category for text or
value items that you want to make relevant for delivery. For example " Material
inside is Fragile" etc.
Item Relevant For Delivery Indicator in Schedule Line When selected, the check
box item Rel.F.Dlv. allows the items attached to a schedule line to be relevant
for delivery. Leave this field deselected for those schedule line categories where
you do not want the items to be delivered such as inquiry- and quotation-related
schedule line categories.
Q. when we use one step process?
A: If the receiving plant makes manual GR, then it is called two step transfer. If it
is automated, then it is called one step
A . One Step Procedure: Stock Updation takes place between two destinations
at a time automatically by using Single Movement Type.
Ex:if u put movement type 301..stock updation will be done from plant to plant.
2. Two Step Procedure: Stock Updation takes place at Supplying and Receiving
Plant by using two different Movement Types.
The requirements class contains all control features for planning such as
relevance for
the material in the sales and distribution documents on the basis of the ATP
quantity
A finer degree of control can be obtained for sales documents using the schedule
line category.
Replenishment lead time is only included in the check performed on the basis of
the
ATP quantity.
You can control with the schedule line category whether an availability check
and
Note -
1. At the global requirements class level, the availability check can only be
switched on in combination with the transfer of requirements. At schedule line
level, the settings are proposed from the requirements class.
3. Also, at schedule line level when the availability check is switched on, the
transfer of requirements can be switched off. For example, this makes sense for
inquiries or sales information.
4. The settings specific to schedule lines for performing an availability check are
only relevant for sales documents. In the shipping documents, the settings from
the requirements class and the delivery item category are used. As with the
schedule line category, the availability check can be switched off as required in
the delivery item category.